Back to kitchen remodel contractors
Zecenas Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Jan 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 171 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2018 | Never finaled issued May 2018, no final | 3567 19th St | revision to 201706260331. remodel 2 bathrooms and kitchen - move some walls (non-load bearing).Details
revision to 201706260331. remodel 2 bathrooms and kitchen - move some walls (non-load bearing). | |
| Jan 8, 2016 | Completed final sign-off Jun 2016 | 525 29th St | upper unit - remodel kitchen, pantry & breakfast room, remodel 1/f bathroom, add sink in existing toilet room, add electrical sockets & cans, change bedroom closet.Details
upper unit - remodel kitchen, pantry & breakfast room, remodel 1/f bathroom, add sink in existing toilet room, add electrical sockets & cans, change bedroom closet. | $45,000 |
| Jan 13, 2015 | Completed final sign-off Mar 2016 | 3569 19th St | upper unit remodel: kitchen, 2 bathrooms, upgrade electrical, new finishes,add skylight over entry hallDetails
upper unit remodel: kitchen, 2 bathrooms, upgrade electrical, new finishes,add skylight over entry hall | $70,000 |
| Feb 7, 2014 | Expired or cancelled expired Feb 2017 | 180 28th Av | remodel one existing kitchen: move sink location, replace cabinets & countertops, replace existing lighting, upgrade electrical, install hood, remove one existing kitchen window (not visible from street) & , (n) wall 5'-0" from property line.Details
remodel one existing kitchen: move sink location, replace cabinets & countertops, replace existing lighting, upgrade electrical, install hood, remove one existing kitchen window (not visible from street) & , (n) wall 5'-0" from property line. | $20,000 |
| Oct 3, 2013 | Completed final sign-off Feb 2014 | 999 Green St | remodel (e) kitchen, replace cabinets, appliances, fixtures, countertops, upgrade electrical and add lighting. no structural work. new hood is self ducting. minimum 50% high efficiency lighting for kitchen.Details
remodel (e) kitchen, replace cabinets, appliances, fixtures, countertops, upgrade electrical and add lighting. no structural work. new hood is self ducting. minimum 50% high efficiency lighting for kitchen. | $50,000 |