Block 6630, lot 042
525 29th St
- City’s use
- Single Family Residential
- Built
- 1930
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 1 bathroom
- Building
- 1,822 sq ft
- Lot
- 2,850 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2024 | In progress issued Mar 2026 | 525 29th St | new metal circular stairway from deck @ rear of builindg to backyard grade for rear egress emergency and safety purposesDetails
new metal circular stairway from deck @ rear of builindg to backyard grade for rear egress emergency and safety purposes | $20,000 | |
| Mar 29, 2018 | Completed final sign-off Apr 2018 | 525 29th St | J V Roofing | re-roofingDetails
re-roofing | $6,000 |
| May 9, 2016 | Never finaled issued May 2016, no final | 525 29th St | street space and sidewalk permitsDetails
street space and sidewalk permits | ||
| Jan 8, 2016 | Completed final sign-off Jun 2016 | 525 29th St | Zecenas Construction | upper unit - remodel kitchen, pantry & breakfast room, remodel 1/f bathroom, add sink in existing toilet room, add electrical sockets & cans, change bedroom closet.Details
upper unit - remodel kitchen, pantry & breakfast room, remodel 1/f bathroom, add sink in existing toilet room, add electrical sockets & cans, change bedroom closet. | $45,000 |
| Oct 21, 2015 | Completed final sign-off Mar 2016 | 525 29th St | replace two casement, one set of large egress windows, and nine double-hung wood windows with energy efficient pella aluminum-clad wood retrofit windows. like for like replacement of same size. front windows are wood w/ mullions - like for like replacement with aluminum clad wood windows.Details
replace two casement, one set of large egress windows, and nine double-hung wood windows with energy efficient pella aluminum-clad wood retrofit windows. like for like replacement of same size. front windows are wood w/ mullions - like for like replacement with aluminum clad wood windows. | $7,500 | |
| Apr 8, 2013 | Completed final sign-off Jun 2013 | 525 29th St | Grey-Design And Build | dry rot repair of railing and deck to rear deck, replace like for like, less than 50%Details
dry rot repair of railing and deck to rear deck, replace like for like, less than 50% | $3,000 |
| Jan 25, 2010 | Completed final sign-off Jan 2011 | 525 29th St | Grey-Design And Build | remodel upstairs bathroom, re-tile & replace toilet down stairsDetails
remodel upstairs bathroom, re-tile & replace toilet down stairs | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Grey-Design And Build (2), J V Roofing, Zecenas Construction
- Engineers
- Darrel Harris
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.