Zecenas Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Jan 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 10 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2018 | Never finaled issued May 2018, no final | 3567 19th St | revision to 201706260331. remodel 2 bathrooms and kitchen - move some walls (non-load bearing).Details
revision to 201706260331. remodel 2 bathrooms and kitchen - move some walls (non-load bearing). | |
| Jan 8, 2016 | Completed final sign-off Jun 2016 | 525 29th St | upper unit - remodel kitchen, pantry & breakfast room, remodel 1/f bathroom, add sink in existing toilet room, add electrical sockets & cans, change bedroom closet.Details
upper unit - remodel kitchen, pantry & breakfast room, remodel 1/f bathroom, add sink in existing toilet room, add electrical sockets & cans, change bedroom closet. | $45,000 |
| Jan 13, 2015 | Completed final sign-off Mar 2016 | 3569 19th St | upper unit remodel: kitchen, 2 bathrooms, upgrade electrical, new finishes,add skylight over entry hallDetails
upper unit remodel: kitchen, 2 bathrooms, upgrade electrical, new finishes,add skylight over entry hall | $70,000 |
| Jul 5, 2011 | Completed final sign-off Nov 2012 | 180 28th Av | proposed horizontal addition in the rear of bldg with (n) exterior finishes, colors, & roof to match (e) conditions; interior of (n) addition to be (n) bathroom w/ necessary electrical, mechanical & plumbing as req'd. proposed remodel & upgrades to finishes on (e) master bath, including (n) fixturesDetails
proposed horizontal addition in the rear of bldg with (n) exterior finishes, colors, & roof to match (e) conditions; interior of (n) addition to be (n) bathroom w/ necessary electrical, mechanical & plumbing as req'd. proposed remodel & upgrades to finishes on (e) master bath, including (n) fixtures | $90,000 |
| Mar 15, 2011 | Completed final sign-off Jun 2011 | 1029 Portola Dr | install bathroom & bedroom in garage level.Details
install bathroom & bedroom in garage level. | $25,000 |