Back to kitchen remodel contractors
Zack De Vito Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Aug 2026
- Last 24 months
- 17 permits filed
171 permits since 2000: 111 completed, 15 in progress, 24 never finaled, 21 expired or cancelled.
Of the 24 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 17 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
33 kitchen remodel permits: 25 completed, 2 in progress, 2 never finaled, 4 expired or cancelled. Typically 4 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Jul 2026 | 2679 California St | demolish 2nd fl rear exterior bay wall and reframe for new door system. new 53 sf deck. replace in kind 2 kitchen windows. replace in kind partio doors and downstairs rear bedroom window, enlarge rear upstairs bedroom window. add window to downstairs rear bedroom. steps from patio to garden.Details
demolish 2nd fl rear exterior bay wall and reframe for new door system. new 53 sf deck. replace in kind 2 kitchen windows. replace in kind partio doors and downstairs rear bedroom window, enlarge rear upstairs bedroom window. add window to downstairs rear bedroom. steps from patio to garden. | $42,645 |
| Jul 6, 2026 | In progress issued Jul 2026 | 1515 19th St | interior remodel remove two walls, install (n) beam and ceiling, new kitchen and bathroom, mep (all electric), flooring, lighting, painting, and no exterior work.Details
interior remodel remove two walls, install (n) beam and ceiling, new kitchen and bathroom, mep (all electric), flooring, lighting, painting, and no exterior work. | $208,000 |
| Nov 10, 2025 | Completed final sign-off Oct 2026 | 255 Laidley St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $100,863 |
| Jul 8, 2024 | Completed final sign-off Sep 2024 | 670 Shotwell St | re-install door in ground floor kitchen to access basement.Details
re-install door in ground floor kitchen to access basement. | $1,200 |
| Mar 18, 2024 | Completed final sign-off Apr 2024 | 670 Shotwell St | kitchen remodel. new cabinets, counters, reuse dw + range. new fridge, new lights, new plugs in (e) location (90%). no change in layout, walls, openings. new vanity in bathroom. no major sheet rock removal in kitchen. bathroom scope is only new vanity. all interior work. no major sheet work removalDetails
kitchen remodel. new cabinets, counters, reuse dw + range. new fridge, new lights, new plugs in (e) location (90%). no change in layout, walls, openings. new vanity in bathroom. no major sheet rock removal in kitchen. bathroom scope is only new vanity. all interior work. no major sheet work removal | $20,000 |
| May 19, 2023 | Completed final sign-off Sep 2024 | 445 Upper Tr | repplace exisitng single pane alum windows in livingroom, kitchen & bedrooms, operation to match exisitng. u-fact of new windows max 0.30 replace existing open wire panels at balcony railing with glass panels. same size & location.Details
repplace exisitng single pane alum windows in livingroom, kitchen & bedrooms, operation to match exisitng. u-fact of new windows max 0.30 replace existing open wire panels at balcony railing with glass panels. same size & location. | $9,200 |
| May 18, 2023 | Completed final sign-off Sep 2024 | 445 Upper Tr | unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior workDetails
unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior work | $125,000 |
| Apr 21, 2023 | Expired or cancelled cancelled Aug 2023 | 254 Page St | replace (3) front windows in the bedroom, (2) windows in bedroom #2 are sash replacement only keep (e) jam & trim. kitchen window will be a (n) complete window.Details
replace (3) front windows in the bedroom, (2) windows in bedroom #2 are sash replacement only keep (e) jam & trim. kitchen window will be a (n) complete window. | $7,500 |
| Apr 14, 2023 | Expired or cancelled cancelled Aug 2023 | 254 Page St | e 3 unit building remodel 1st fl unit. kitchen, bedroom, bath, no exterior workDetails
e 3 unit building remodel 1st fl unit. kitchen, bedroom, bath, no exterior work | $125,000 |
| Sep 21, 2022 | Expired or cancelled expired Mar 2026 | 418 Liberty St | renovation of (e) 3-story residence, including 1st fl stair, 2nd fl kitchen/family room, 3rd fl owner's suite, for an open plan and allowing stair circulation. no exterior work to street facade.Details
renovation of (e) 3-story residence, including 1st fl stair, 2nd fl kitchen/family room, 3rd fl owner's suite, for an open plan and allowing stair circulation. no exterior work to street facade. | $375,000 |
| Apr 23, 2021 | Completed final sign-off Nov 2021 | 1672 15th St | to comply with complaint #202175324. kitchen and bath remodel.Details
to comply with complaint #202175324. kitchen and bath remodel. | $12,500 |
| Sep 5, 2020 | Completed final sign-off Apr 2021 | 223 Liberty St | kitchen remodel including a new laundry closet.Details
kitchen remodel including a new laundry closet. | $35,000 |
| Jul 22, 2020 | Completed final sign-off Dec 2021 | 1913 Baker St | replace kitchen island, refrigerator countertops, rear yard exterior decking inking less than 50%. replace wood front & side doors inkind. (n) storage cabinets in dining room & denDetails
replace kitchen island, refrigerator countertops, rear yard exterior decking inking less than 50%. replace wood front & side doors inkind. (n) storage cabinets in dining room & den | $10,000 |
| Jul 6, 2020 | Completed final sign-off Mar 2021 | 223 Liberty St | kitchen remodelDetails
kitchen remodel | $40,000 |
| Dec 14, 2018 | Completed final sign-off Aug 2019 | 1238 Castro St | t.i. of extg 1st floor office space including new partitions, conference room, & remodel of extg kitchen. no work to extg bathroom. no work to exterior. deferred submittals electrical, mechanical, plmpg & sprinklers to be design build under seperate permits.Details
t.i. of extg 1st floor office space including new partitions, conference room, & remodel of extg kitchen. no work to extg bathroom. no work to exterior. deferred submittals electrical, mechanical, plmpg & sprinklers to be design build under seperate permits. | $153,228 |
| May 29, 2018 | Completed final sign-off Apr 2019 | 1880 Steiner St | #406: interior renovation of kitchen, powderroom & 2 bathrooms. replace flooring on 4th fl and replace fireplace. relocate/replace electrical as required. maher naDetails
#406: interior renovation of kitchen, powderroom & 2 bathrooms. replace flooring on 4th fl and replace fireplace. relocate/replace electrical as required. maher na | $35,000 |
| Nov 3, 2017 | Completed final sign-off Oct 2018 | 558 22nd Av | 1st,2nd,3rd fl remodel incl.(e)kitchen & 2 bathrooms, replace 2 (e) 1st fl windows along east wall & add 2 new property line windows on 3rd fl along north wall. repair/replace (e) guardrails at rear deck with (n) glass panels. legalize bonous room and bathrm on 1st fl and remove unpermitted wet bar.Details
1st,2nd,3rd fl remodel incl.(e)kitchen & 2 bathrooms, replace 2 (e) 1st fl windows along east wall & add 2 new property line windows on 3rd fl along north wall. repair/replace (e) guardrails at rear deck with (n) glass panels. legalize bonous room and bathrm on 1st fl and remove unpermitted wet bar. | $99,000 |
| Jun 14, 2017 | Completed final sign-off Dec 2017 | 2 Warren Dr | partial interior remodel to grnd & 1st flr: (e) bathrooms and kitchen bathrooms/kitchen, electrical, plumbing. all work to take place within the building envelopeDetails
partial interior remodel to grnd & 1st flr: (e) bathrooms and kitchen bathrooms/kitchen, electrical, plumbing. all work to take place within the building envelope | $49,000 |
| Dec 1, 2016 | Completed final sign-off Sep 2017 | 770 De Haro St | remodel of existing kitchen - 11 linear feet of replacement cabinetry, counter top & appliances. replacement of existing bathroom vanity. repair/reroofing of existing deck adjacent to lilving space, repair in kind.Details
remodel of existing kitchen - 11 linear feet of replacement cabinetry, counter top & appliances. replacement of existing bathroom vanity. repair/reroofing of existing deck adjacent to lilving space, repair in kind. | $17,500 |
| Aug 10, 2016 | Completed final sign-off Nov 2017 | 3572 19th St | remodel existing duplex kitchen and bath remodel and addition of a master bedroom & bath on the 1st floor. upper unit include kitchen and bath and the addition of a spiral stair leading to a new roof deckDetails
remodel existing duplex kitchen and bath remodel and addition of a master bedroom & bath on the 1st floor. upper unit include kitchen and bath and the addition of a spiral stair leading to a new roof deck | $350,000 |
| May 2, 2016 | Completed final sign-off Feb 2017 | 446 Bryant St | t.i.-new accessible restrms & kitchen, new non-load bearing walls @ storage and conference rms, new t-24 compliant lighting, new finishes. replace (e) steel roll up door w/new alum/glass roll up door w/fixed glass above, new finishes. mep under separae demo under separate pa# 201603021003;maher n/aDetails
t.i.-new accessible restrms & kitchen, new non-load bearing walls @ storage and conference rms, new t-24 compliant lighting, new finishes. replace (e) steel roll up door w/new alum/glass roll up door w/fixed glass above, new finishes. mep under separae demo under separate pa# 201603021003;maher n/a | $198,000 |
| Dec 9, 2013 | Completed final sign-off Nov 2015 | 22 Fairmount St | new 1 bedroom in-law unit at rear horizontal addition. rear addition on the (e) 1st fl deck to accomodate a kitchen remodel. new rear 1/fl deck over the new rear in-law unit addition. new external spiral stair fr 1/fl to backyard.Details
new 1 bedroom in-law unit at rear horizontal addition. rear addition on the (e) 1st fl deck to accomodate a kitchen remodel. new rear 1/fl deck over the new rear in-law unit addition. new external spiral stair fr 1/fl to backyard. | $200,000 |
| Apr 10, 2013 | Completed final sign-off Apr 2014 | 1320 Church St | revision to pa# 200705030361. changes include: upgrade framing due to deteriorated (e0 conditions discovered after demolition of interiors; exterior door and windows relocated; relocate kitchen.(e) rear buildingDetails
revision to pa# 200705030361. changes include: upgrade framing due to deteriorated (e0 conditions discovered after demolition of interiors; exterior door and windows relocated; relocate kitchen.(e) rear building | $20,000 |
| Jul 16, 2012 | Completed final sign-off Jul 2013 | 321 San Carlos St | no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4".Details
no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4". | $200,000 |
| Jun 1, 2012 | Expired or cancelled withdrawn Jun 2012 | 321 San Carlos St | project does not enlarge bldg. footprint or height. project includes new foundation, remodeled kitchen & bathrms. new exterior windows on secondart facades, remove non-historic laundry room. new stair betwn lower level & 1st level. increase in ceiling hieght on lower level. new skylights.Details
project does not enlarge bldg. footprint or height. project includes new foundation, remodeled kitchen & bathrms. new exterior windows on secondart facades, remove non-historic laundry room. new stair betwn lower level & 1st level. increase in ceiling hieght on lower level. new skylights. | $350,000 |
| Mar 13, 2012 | Completed final sign-off Nov 2012 | 746 Valencia St | additional use from vacant to coffee store work entail bldg (n) non-struct int partitns, ceiling separat ltd food handlng & dishwashing areas from the retail, svc & seating areas, except (e) restroom, all new elec,mech & plbg.new fixture,finish. no kitchen in project scope, all food prep off site.Details
additional use from vacant to coffee store work entail bldg (n) non-struct int partitns, ceiling separat ltd food handlng & dishwashing areas from the retail, svc & seating areas, except (e) restroom, all new elec,mech & plbg.new fixture,finish. no kitchen in project scope, all food prep off site. | $110,000 |
| Aug 30, 2010 | Never finaled issued Oct 2010, no final | 27 Maiden Ln | a retail bakery - a new non-struct raised flr level throughout the space 7 new interior separating limited food preparation & dishwashing areas from retail & seating areas, mechanical mezzanine lcoated above the food prep, coffee svc & dishwashing areas.all new mep within the space, (no kitchen).Details
a retail bakery - a new non-struct raised flr level throughout the space 7 new interior separating limited food preparation & dishwashing areas from retail & seating areas, mechanical mezzanine lcoated above the food prep, coffee svc & dishwashing areas.all new mep within the space, (no kitchen). | $200,000 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 2565 03rd St | ste #323 -interior tenant improvement for a wholesale bakery. work to include (n) plumbing & electrical & mechanical. (n) kitchen equipment, a new ada bathroom & a (n) storage mezzanine. as a wholesale food prep facility only state health dept. approval req. sprinkler under spearate permit.Details
ste #323 -interior tenant improvement for a wholesale bakery. work to include (n) plumbing & electrical & mechanical. (n) kitchen equipment, a new ada bathroom & a (n) storage mezzanine. as a wholesale food prep facility only state health dept. approval req. sprinkler under spearate permit. | $45,000 |
| Jan 27, 2010 | Completed final sign-off Mar 2010 | 2304 Market St | minor tenant improvement of an (e) restaurant space. work to include; rework an (e) dining counter & equipment & building a new order & pick up counter. minor changes to kitchen equipment-remove cooktop & tow pasta cookers, install new grille & fryer. remove (e) canvas awning & install (n) awning.Details
minor tenant improvement of an (e) restaurant space. work to include; rework an (e) dining counter & equipment & building a new order & pick up counter. minor changes to kitchen equipment-remove cooktop & tow pasta cookers, install new grille & fryer. remove (e) canvas awning & install (n) awning. | $20,000 |
| Sep 16, 2009 | Completed final sign-off Nov 2009 | 451 09th St | new finishes on walls & floor, new ada platform & ramp for entry; new lighting, new sink in kitchen, new display case/cabinets and work tables, new ada signage.Details
new finishes on walls & floor, new ada platform & ramp for entry; new lighting, new sink in kitchen, new display case/cabinets and work tables, new ada signage. | $30,000 |
| Jul 10, 2008 | Completed final sign-off Nov 2008 | 621 Spruce St | remodel kitchen & 3 bathroom, replace counters, cabients, appliances, plbg fixtures, repalce (e) window @ lightwell at kitchen.all work on 3rd and 4th floors.Details
remodel kitchen & 3 bathroom, replace counters, cabients, appliances, plbg fixtures, repalce (e) window @ lightwell at kitchen.all work on 3rd and 4th floors. | $40,000 |
| Jan 4, 2007 | Never finaled issued Jan 2007, no final | 18 Harper St | interior remodel: new cabinery, counters, flooring & finishes, new appliances, lighting & plumbing fixtures, infill exisiting and add new wood sididng, new non property line windows,new ducts @ kitchen hood & w/p, new skylight, lno work on lany other location or unit on propertyDetails
interior remodel: new cabinery, counters, flooring & finishes, new appliances, lighting & plumbing fixtures, infill exisiting and add new wood sididng, new non property line windows,new ducts @ kitchen hood & w/p, new skylight, lno work on lany other location or unit on property | $24,000 |
| Dec 4, 2000 | Completed final sign-off Dec 2000 | 163 Chenery St | clarification work done to unit 163 chenery remodel kitchen bathrm new cabinets fixture & finishesDetails
clarification work done to unit 163 chenery remodel kitchen bathrm new cabinets fixture & finishes | $25,000 |