Back to bathroom remodel contractors
Zack De Vito Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Aug 2026
- Last 24 months
- 17 permits filed
171 permits since 2000: 111 completed, 15 in progress, 24 never finaled, 21 expired or cancelled.
Of the 24 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 17 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 25 completed, 7 in progress, 3 never finaled, 2 expired or cancelled. Typically 7 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Jul 2026 | 489 Harrison St | interior renovation: selective cabinetry, finishes,fixtures,built-ins.bath/laundry reconfiguration,office layout,media/desk built-ins.bathroom accessory/toilet updates.interior work only,no exterior/common area work,slab penetrations,bass building system modifications or fire sperinkler modificationDetails
interior renovation: selective cabinetry, finishes,fixtures,built-ins.bath/laundry reconfiguration,office layout,media/desk built-ins.bathroom accessory/toilet updates.interior work only,no exterior/common area work,slab penetrations,bass building system modifications or fire sperinkler modification | $85,000 |
| Jul 16, 2026 | In progress issued Sep 2026 | 2679 California St | interior remodel of 3 bathrooms. move laundry location. reconfigure entry to include mudroom. add hydronic radiant heat to first floor level. update lighting plan, no exterior work.Details
interior remodel of 3 bathrooms. move laundry location. reconfigure entry to include mudroom. add hydronic radiant heat to first floor level. update lighting plan, no exterior work. | $351,456 |
| Jul 6, 2026 | In progress issued Jul 2026 | 1515 19th St | interior remodel remove two walls, install (n) beam and ceiling, new kitchen and bathroom, mep (all electric), flooring, lighting, painting, and no exterior work.Details
interior remodel remove two walls, install (n) beam and ceiling, new kitchen and bathroom, mep (all electric), flooring, lighting, painting, and no exterior work. | $208,000 |
| May 21, 2026 | In progress issued Jun 2026 | 1858 Union St | revision to 202604239938, new framing of bathroom floor and wallsDetails
revision to 202604239938, new framing of bathroom floor and walls | $10,000 |
| Apr 22, 2026 | Completed final sign-off Sep 2026 | 255 Laidley St | (e) single family home, remodel (e) bathroom. move non-loadbearing wall. replace vanity, single faucet and toilet. convert walk in shower to alvcove tub/shower.Details
(e) single family home, remodel (e) bathroom. move non-loadbearing wall. replace vanity, single faucet and toilet. convert walk in shower to alvcove tub/shower. | $33,552 |
| Dec 9, 2024 | Completed final sign-off Oct 2025 | 255 Laidley St | interior alteration of existing single family home. rebuild interior stair. rennovate existing full bath, convert full bath to powder room. add closet to primary bedroom. new hardwood flooring. replace existing roof ( under separated permit)Details
interior alteration of existing single family home. rebuild interior stair. rennovate existing full bath, convert full bath to powder room. add closet to primary bedroom. new hardwood flooring. replace existing roof ( under separated permit) | $134,776 |
| Oct 15, 2024 | In progress issued Oct 2024 | 304 Shotwell St | demolition of existing bathroom and utility sink. demolish entry vestibule partitions. demolish portions of (e) non structural slab for future work under separate permit. all work non-structural in nature. no work to exteriorDetails
demolition of existing bathroom and utility sink. demolish entry vestibule partitions. demolish portions of (e) non structural slab for future work under separate permit. all work non-structural in nature. no work to exterior | $2,500 |
| Sep 13, 2024 | In progress issued Sep 2024 | 144 Mallorca Wy | retile (e) bath, replace (e) tub, all other fixtures to remain. move refrigerator. new countertops + sink. all other appliances to emain. replace lighting. no changes to walls.Details
retile (e) bath, replace (e) tub, all other fixtures to remain. move refrigerator. new countertops + sink. all other appliances to emain. replace lighting. no changes to walls. | $45,000 |
| Jun 21, 2024 | In progress issued Jul 2025 | 1279 34th Av | interior remodel of bath, kithcen & stairs. update plumbing, electrical, new skylights. infill patia @ 2nd fl, enclose lightwell @ 2nd fl south side of bldg. new powder room @ 2nd flDetails
interior remodel of bath, kithcen & stairs. update plumbing, electrical, new skylights. infill patia @ 2nd fl, enclose lightwell @ 2nd fl south side of bldg. new powder room @ 2nd fl | $275,000 |
| Mar 18, 2024 | Completed final sign-off Apr 2024 | 670 Shotwell St | kitchen remodel. new cabinets, counters, reuse dw + range. new fridge, new lights, new plugs in (e) location (90%). no change in layout, walls, openings. new vanity in bathroom. no major sheet rock removal in kitchen. bathroom scope is only new vanity. all interior work. no major sheet work removalDetails
kitchen remodel. new cabinets, counters, reuse dw + range. new fridge, new lights, new plugs in (e) location (90%). no change in layout, walls, openings. new vanity in bathroom. no major sheet rock removal in kitchen. bathroom scope is only new vanity. all interior work. no major sheet work removal | $20,000 |
| May 18, 2023 | Completed final sign-off Sep 2024 | 445 Upper Tr | unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior workDetails
unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior work | $125,000 |
| Apr 14, 2023 | Expired or cancelled cancelled Aug 2023 | 254 Page St | e 3 unit building remodel 1st fl unit. kitchen, bedroom, bath, no exterior workDetails
e 3 unit building remodel 1st fl unit. kitchen, bedroom, bath, no exterior work | $125,000 |
| May 6, 2022 | Completed final sign-off Jul 2024 | 2181 09th Av | work to a 2-story over 2-level basement single family residence built in 2019. interior remodel only of basement & 2nd fl. convert existing spa into gym. convert existing dressing room into another bedroom & bathroom.Details
work to a 2-story over 2-level basement single family residence built in 2019. interior remodel only of basement & 2nd fl. convert existing spa into gym. convert existing dressing room into another bedroom & bathroom. | $160,000 |
| Apr 23, 2021 | Completed final sign-off Nov 2021 | 1672 15th St | to comply with complaint #202175324. kitchen and bath remodel.Details
to comply with complaint #202175324. kitchen and bath remodel. | $12,500 |
| Jan 11, 2021 | Completed final sign-off Mar 2023 | 3542 Scott St | interior renovations to a residential unit. existing bathroom remodel. (n) master bathroom, (n) walk-in closet, (n) linen closets.Details
interior renovations to a residential unit. existing bathroom remodel. (n) master bathroom, (n) walk-in closet, (n) linen closets. | $30,000 |
| Oct 2, 2020 | Completed final sign-off Jun 2022 | 489 Harrison St | unit 404: r/r non structural walls,ceilings/soffits mod to plan updates,install new kitchn cabinetry,dining,library,laundry,bathroom.r/r tub w/ shower.remove ensuite tub and replace with freestanding tub.reroute (e) ductwork.new wall and floor finishesDetails
unit 404: r/r non structural walls,ceilings/soffits mod to plan updates,install new kitchn cabinetry,dining,library,laundry,bathroom.r/r tub w/ shower.remove ensuite tub and replace with freestanding tub.reroute (e) ductwork.new wall and floor finishes | $100,000 |
| Aug 28, 2020 | Completed final sign-off Dec 2021 | 1913 Baker St | remodel master bedroom, bathroom, and closets. demolish exterior wood staircase. replace windows at rear facade of building.Details
remodel master bedroom, bathroom, and closets. demolish exterior wood staircase. replace windows at rear facade of building. | $75,000 |
| Oct 17, 2019 | Never finaled issued Feb 2021, no final | 747 Duncan St | rear addition to (e) single family bldg. demo (e) rear deck. reconfigure interior stairway. remodel entry. add bedrooms baths & laundry.Details
rear addition to (e) single family bldg. demo (e) rear deck. reconfigure interior stairway. remodel entry. add bedrooms baths & laundry. | $457,000 |
| Dec 14, 2018 | Completed final sign-off Aug 2019 | 1238 Castro St | t.i. of extg 1st floor office space including new partitions, conference room, & remodel of extg kitchen. no work to extg bathroom. no work to exterior. deferred submittals electrical, mechanical, plmpg & sprinklers to be design build under seperate permits.Details
t.i. of extg 1st floor office space including new partitions, conference room, & remodel of extg kitchen. no work to extg bathroom. no work to exterior. deferred submittals electrical, mechanical, plmpg & sprinklers to be design build under seperate permits. | $153,228 |
| May 29, 2018 | Completed final sign-off Apr 2019 | 1880 Steiner St | #406: interior renovation of kitchen, powderroom & 2 bathrooms. replace flooring on 4th fl and replace fireplace. relocate/replace electrical as required. maher naDetails
#406: interior renovation of kitchen, powderroom & 2 bathrooms. replace flooring on 4th fl and replace fireplace. relocate/replace electrical as required. maher na | $35,000 |
| Nov 3, 2017 | Completed final sign-off Oct 2018 | 558 22nd Av | 1st,2nd,3rd fl remodel incl.(e)kitchen & 2 bathrooms, replace 2 (e) 1st fl windows along east wall & add 2 new property line windows on 3rd fl along north wall. repair/replace (e) guardrails at rear deck with (n) glass panels. legalize bonous room and bathrm on 1st fl and remove unpermitted wet bar.Details
1st,2nd,3rd fl remodel incl.(e)kitchen & 2 bathrooms, replace 2 (e) 1st fl windows along east wall & add 2 new property line windows on 3rd fl along north wall. repair/replace (e) guardrails at rear deck with (n) glass panels. legalize bonous room and bathrm on 1st fl and remove unpermitted wet bar. | $99,000 |
| Jun 14, 2017 | Completed final sign-off Dec 2017 | 2 Warren Dr | partial interior remodel to grnd & 1st flr: (e) bathrooms and kitchen bathrooms/kitchen, electrical, plumbing. all work to take place within the building envelopeDetails
partial interior remodel to grnd & 1st flr: (e) bathrooms and kitchen bathrooms/kitchen, electrical, plumbing. all work to take place within the building envelope | $49,000 |
| Feb 13, 2017 | Completed final sign-off Jun 2017 | 199 Marietta Dr | revision to app#201701187339. replace door with window. remove 1/2 bath replace with laundry.Details
revision to app#201701187339. replace door with window. remove 1/2 bath replace with laundry. | |
| Jan 18, 2017 | Completed final sign-off Jun 2017 | 199 Marietta Dr | convert extg garage to an artist studio and storage. add a new half bath. add one exterior door and modify one extg window.Details
convert extg garage to an artist studio and storage. add a new half bath. add one exterior door and modify one extg window. | $4,800 |
| Dec 1, 2016 | Completed final sign-off Sep 2017 | 770 De Haro St | remodel of existing kitchen - 11 linear feet of replacement cabinetry, counter top & appliances. replacement of existing bathroom vanity. repair/reroofing of existing deck adjacent to lilving space, repair in kind.Details
remodel of existing kitchen - 11 linear feet of replacement cabinetry, counter top & appliances. replacement of existing bathroom vanity. repair/reroofing of existing deck adjacent to lilving space, repair in kind. | $17,500 |
| Aug 10, 2016 | Completed final sign-off Nov 2017 | 3572 19th St | remodel existing duplex kitchen and bath remodel and addition of a master bedroom & bath on the 1st floor. upper unit include kitchen and bath and the addition of a spiral stair leading to a new roof deckDetails
remodel existing duplex kitchen and bath remodel and addition of a master bedroom & bath on the 1st floor. upper unit include kitchen and bath and the addition of a spiral stair leading to a new roof deck | $350,000 |
| Apr 14, 2014 | Completed final sign-off Dec 2015 | 22 Fairmount St | remodel of an existing bathroom on the second floor.Details
remodel of an existing bathroom on the second floor. | $10,000 |
| Apr 10, 2013 | Completed final sign-off Apr 2014 | 1318 Church St | revision to pa# 200612149841. changes include: change structural system from post and beam to all wood frame; change window size and location; change plan of third floor bathroom; add two property line windows.Details
revision to pa# 200612149841. changes include: change structural system from post and beam to all wood frame; change window size and location; change plan of third floor bathroom; add two property line windows. | |
| Jul 16, 2012 | Completed final sign-off Jul 2013 | 321 San Carlos St | no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4".Details
no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4". | $200,000 |
| Jul 12, 2012 | Completed final sign-off Nov 2012 | 1145 Douglass St | the project shall include the remodel of the existing two bathrooms and an existing walk-though closetDetails
the project shall include the remodel of the existing two bathrooms and an existing walk-though closet | $35,000 |
| Dec 2, 2011 | Expired or cancelled withdrawn Sep 2019 | 155 Caselli Av | interior remodeling incl new ktichen & bath fixtures & finishes, new bath on 2nd floor, new finishes as req to integrate new work, remov e(e) vinyl siding, repair stucco @ front, repair (e) wood sidings as req at rear, replace all windows w/marvin integrity windows, add skylights.Details
interior remodeling incl new ktichen & bath fixtures & finishes, new bath on 2nd floor, new finishes as req to integrate new work, remov e(e) vinyl siding, repair stucco @ front, repair (e) wood sidings as req at rear, replace all windows w/marvin integrity windows, add skylights. | $78,500 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 2565 03rd St | ste #323 -interior tenant improvement for a wholesale bakery. work to include (n) plumbing & electrical & mechanical. (n) kitchen equipment, a new ada bathroom & a (n) storage mezzanine. as a wholesale food prep facility only state health dept. approval req. sprinkler under spearate permit.Details
ste #323 -interior tenant improvement for a wholesale bakery. work to include (n) plumbing & electrical & mechanical. (n) kitchen equipment, a new ada bathroom & a (n) storage mezzanine. as a wholesale food prep facility only state health dept. approval req. sprinkler under spearate permit. | $45,000 |
| Apr 23, 2010 | Never finaled issued Dec 2010, no final | 2136 18th St | 3-story addition to an (e) residence. (n) garage entry & den on ground flr; (e) 2nd flr. reconfigured to provide 2 (n) bathrms., 2-bedrms, kit., liv.rm., din.rm. & stair. 3rd. flr. will add a guest bedrm. & bath & roof deck. (e) footprint to remain, no work to (e) ground flr. other than to interfacDetails
3-story addition to an (e) residence. (n) garage entry & den on ground flr; (e) 2nd flr. reconfigured to provide 2 (n) bathrms., 2-bedrms, kit., liv.rm., din.rm. & stair. 3rd. flr. will add a guest bedrm. & bath & roof deck. (e) footprint to remain, no work to (e) ground flr. other than to interfac | $180,000 |
| Nov 2, 2009 | Completed final sign-off Dec 2009 | 2175 Chestnut St | revision to application 200909036148. add soffit over bar, relocate fixtures in new bathroom. add awning at front of building.Details
revision to application 200909036148. add soffit over bar, relocate fixtures in new bathroom. add awning at front of building. | $2,500 |
| Sep 3, 2009 | Completed final sign-off Dec 2009 | 2175 Chestnut St | ti of (e) restaurant. resurface walls, floors, etc. new ada bathroom, enlarge bar, minor changes to cook line equipment.Details
ti of (e) restaurant. resurface walls, floors, etc. new ada bathroom, enlarge bar, minor changes to cook line equipment. | $40,000 |
| Jul 10, 2008 | Completed final sign-off Nov 2008 | 621 Spruce St | remodel kitchen & 3 bathroom, replace counters, cabients, appliances, plbg fixtures, repalce (e) window @ lightwell at kitchen.all work on 3rd and 4th floors.Details
remodel kitchen & 3 bathroom, replace counters, cabients, appliances, plbg fixtures, repalce (e) window @ lightwell at kitchen.all work on 3rd and 4th floors. | $40,000 |
| May 3, 2007 | Never finaled issued Dec 2007, no final | 1320 Church St | remove existing entrance &i entry stairs, convert existing garage to new habtitable, r-3 space w/2 new bedrooms & bath. interiro remodel to existing second floor. lower existisng foundation by 8" to allow for head clearance.Details
remove existing entrance &i entry stairs, convert existing garage to new habtitable, r-3 space w/2 new bedrooms & bath. interiro remodel to existing second floor. lower existisng foundation by 8" to allow for head clearance. | $20,000 |