Back to kitchen remodel contractors
Yes General Construction Builder Llc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to Jul 2026
- Last 24 months
- 1 permit filed
63 permits since 2000: 51 completed, 2 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 18 completed, 2 never finaled. Typically 26 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | Completed final sign-off Sep 2026 | 2001 Ocean Av | to comply with nov: 202654718 - convert laundry to kitchenette with hood, 2burners stove (no oven) sink, refgrigerator and cabinets. relocate washer, dryer, sink to garage on ground floor.Details
to comply with nov: 202654718 - convert laundry to kitchenette with hood, 2burners stove (no oven) sink, refgrigerator and cabinets. relocate washer, dryer, sink to garage on ground floor. | $2,500 |
| Oct 4, 2024 | Completed final sign-off Oct 2024 | 67 Inverness Dr | rev 202206287329- change layout in kitchen bathroom and stairs, reduce size of skylights, enlarge closet located at ground floor. relocated kitchenette, reduce size of door and window at rear.Details
rev 202206287329- change layout in kitchen bathroom and stairs, reduce size of skylights, enlarge closet located at ground floor. relocated kitchenette, reduce size of door and window at rear. | |
| May 13, 2024 | Completed final sign-off Jul 2024 | 4763 19th St | interior remodel - kitchen remodel on 2/f. add one half bathroom on 2/f and add one bathroom on 3/f. no exterior change.Details
interior remodel - kitchen remodel on 2/f. add one half bathroom on 2/f and add one bathroom on 3/f. no exterior change. | $20,000 |
| Feb 5, 2024 | Completed final sign-off May 2024 | 4200 Moraga St | remodel (1) e. kitchen, (1) e. bathroom & e. half bathroom. replace in-kind. kitchen: replace cabinets, countertops, and appliances. bathroom: replace tiles, fixtures, and tub. half bathroom: replace tiles and fixtures.Details
remodel (1) e. kitchen, (1) e. bathroom & e. half bathroom. replace in-kind. kitchen: replace cabinets, countertops, and appliances. bathroom: replace tiles, fixtures, and tub. half bathroom: replace tiles and fixtures. | $18,500 |
| Jul 18, 2023 | Completed final sign-off Nov 2023 | 263 Sadowa St | construct new wall between hallway/(e) storage & install kitchentte at g/f.Details
construct new wall between hallway/(e) storage & install kitchentte at g/f. | $15,000 |
| Jun 9, 2023 | Completed final sign-off Apr 2024 | 1838 Irving St | construction revision on 20191231119, new floor layout for kitchen and dinning area. new ada restroomDetails
construction revision on 20191231119, new floor layout for kitchen and dinning area. new ada restroom | |
| Jun 5, 2023 | Completed final sign-off Mar 2024 | 1639 Polk St | establish "union dumpling" restaurant. scope of work includes new ktichen equipment per plan. (e) kitchen hood to remain.Details
establish "union dumpling" restaurant. scope of work includes new ktichen equipment per plan. (e) kitchen hood to remain. | $100,000 |
| Feb 28, 2023 | Never finaled issued Oct 2023, no final | 60 Clipper Cove Wy | new food service and seating area in e historic building. work consists of new kitchen equipment and finishes, millwork bar, bar equipment, type 1 and 2 hoods. hood/duct fire suppression system under sep permit. (bar scope on sep permit)Details
new food service and seating area in e historic building. work consists of new kitchen equipment and finishes, millwork bar, bar equipment, type 1 and 2 hoods. hood/duct fire suppression system under sep permit. (bar scope on sep permit) | $80,000 |
| Jun 28, 2022 | Completed final sign-off Oct 2024 | 67 Inverness Dr | remodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl.Details
remodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl. | $150,000 |
| Oct 5, 2021 | Completed final sign-off Nov 2023 | 206 Leland Av | a.d.u. (unit d) per ordinance 162-16 on 1st floor 1st floor 1) add two bedrooms, one kitchen and living/dining room; 2) relocate w.h. and w & d.Details
a.d.u. (unit d) per ordinance 162-16 on 1st floor 1st floor 1) add two bedrooms, one kitchen and living/dining room; 2) relocate w.h. and w & d. | $50,000 |
| May 11, 2021 | Completed final sign-off Dec 2023 | 1430 19th Av | 1st floor -a.d.u. per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. separate submittal for fire sprinkler and structuralDetails
1st floor -a.d.u. per ordinance 162-16 include 1) reconfigure interior layout include two bedrooms, a living room, kitchen & a 3-fixtures bathroom. 2) add common space (gym), a 3-fixture bathroom and storage. separate submittal for fire sprinkler and structural | $50,000 |
| Apr 21, 2021 | Completed final sign-off Dec 2023 | 1430 19th Av | remodel 3 bathrooms on 2/f & 1 kitchen.Details
remodel 3 bathrooms on 2/f & 1 kitchen. | $30,000 |
| Dec 26, 2019 | Completed final sign-off Aug 2020 | 267 Holyoke St | remodel existing kitchen and bathroom fixtures. upgrade electrician panel to 200 amps and wires. replace existing stairs inkind and front facade windows in kind with all wood windows.Details
remodel existing kitchen and bathroom fixtures. upgrade electrician panel to 200 amps and wires. replace existing stairs inkind and front facade windows in kind with all wood windows. | $15,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 577 37th Av | 1)remodel 2 extg bathrooms, change extg closet to be laundry closet. change extg kitchen to be new bedroom. change extg dining to be new kitchen at 3rd floor. 2)remodel 2 extg bathrooms and change extg closet to be laundry closet at 2nd floor. 3)install new lighting fixtures at 2nd and 3rd floor.Details
1)remodel 2 extg bathrooms, change extg closet to be laundry closet. change extg kitchen to be new bedroom. change extg dining to be new kitchen at 3rd floor. 2)remodel 2 extg bathrooms and change extg closet to be laundry closet at 2nd floor. 3)install new lighting fixtures at 2nd and 3rd floor. | $82,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2020 | 395 Joost Av | revision to app#201809069252. basement reconfigure layout per plans. 1st floor: relocate kitchen and dining. new cantilever deck and deck at rear.Details
revision to app#201809069252. basement reconfigure layout per plans. 1st floor: relocate kitchen and dining. new cantilever deck and deck at rear. | $20,000 |
| Sep 6, 2018 | Completed final sign-off Mar 2020 | 395 Joost Av | remodel e kitchen at gr fl. convert e bedroom to dining rm, remove e bth, laundry room convert back to garage at gr fl. remodel e 2 bedroom and 1 bath at 2nd fl. construct 1 bedroom, family rm, 1 full bath at basementDetails
remodel e kitchen at gr fl. convert e bedroom to dining rm, remove e bth, laundry room convert back to garage at gr fl. remodel e 2 bedroom and 1 bath at 2nd fl. construct 1 bedroom, family rm, 1 full bath at basement | $82,000 |
| Aug 21, 2018 | Completed final sign-off Feb 2023 | 300 Somerset St | comply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg.Details
comply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg. | $15,000 |
| Jul 12, 2018 | Completed final sign-off May 2023 | 1519 22nd Av | two story rear addition & raise 2nd fl roof to match adjacent neighbor. addition of dwelling unit on ground fl per ordiance no. 95-17 section 207(1)(6) & comply with info sht g-23. 1st fl (adu) add 1 bed,1 bath, 1 media, 1 living, kitchen & laundry. 2nd fl add 1 study and 1 bath, new deckDetails
two story rear addition & raise 2nd fl roof to match adjacent neighbor. addition of dwelling unit on ground fl per ordiance no. 95-17 section 207(1)(6) & comply with info sht g-23. 1st fl (adu) add 1 bed,1 bath, 1 media, 1 living, kitchen & laundry. 2nd fl add 1 study and 1 bath, new deck | $80,000 |
| Sep 7, 2017 | Completed final sign-off Feb 2020 | 128 Venus St | horizontal addition and new/replaced deck in the rear. scope to include adding one additional dwelling unit to existing single home family pursuant to planning code section 207(c)(6)- 2 bedrooms, 1 kitchen, 1 bathroom. structural deferred under separate permit.Details
horizontal addition and new/replaced deck in the rear. scope to include adding one additional dwelling unit to existing single home family pursuant to planning code section 207(c)(6)- 2 bedrooms, 1 kitchen, 1 bathroom. structural deferred under separate permit. | $30,000 |
| May 19, 2017 | Completed final sign-off Dec 2017 | 122 Venus St | 1st floor: add 2 bedrooms and one full bath. 2nd floor: remodel kitchen and bath, and add 1 bedroom, 1 bath and deck at rear.Details
1st floor: add 2 bedrooms and one full bath. 2nd floor: remodel kitchen and bath, and add 1 bedroom, 1 bath and deck at rear. | $80,000 |