Permit GraphShortlistSan Francisco building permits since 2000

Yes General Construction Builder Llc

Contractor license
999640
State license record
Based in
San Francisco
On San Francisco permits
Dec 2015 to Jul 2026
Last 24 months
1 permit filed

63 permits since 2000: 51 completed, 2 in progress, 8 never finaled, 2 expired or cancelled.

Of the 8 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllDeck 7Stairs 8Kitchen remodel 20Bathroom remodel 19

8 stairs permits: 8 completed. Typically 4 days from filing to permit and 223 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 4, 2024Completed
final sign-off Oct 2024
67 Inverness Drrev 202206287329- change layout in kitchen bathroom and stairs, reduce size of skylights, enlarge closet located at ground floor. relocated kitchenette, reduce size of door and window at rear.
Details
Permit
202410042349
Status
complete
Filed
Oct 4, 2024
Permit issued
Oct 7, 2024
Final sign-off
Oct 18, 2024
Address
67 Inverness Dr

rev 202206287329- change layout in kitchen bathroom and stairs, reduce size of skylights, enlarge closet located at ground floor. relocated kitchenette, reduce size of door and window at rear.

Open the permit page

Jun 28, 2022Completed
final sign-off Oct 2024
67 Inverness Drremodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl.
Details
Permit
202206287329
Status
complete
Filed
Jun 28, 2022
Permit issued
Jun 30, 2022
Final sign-off
Oct 18, 2024
Declared cost
$150,000
Address
67 Inverness Dr

remodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl.

Open the permit page

$150,000
Dec 26, 2019Completed
final sign-off Aug 2020
267 Holyoke Stremodel existing kitchen and bathroom fixtures. upgrade electrician panel to 200 amps and wires. replace existing stairs inkind and front facade windows in kind with all wood windows.
Details
Permit
201912260727
Status
complete
Filed
Dec 26, 2019
Permit issued
Dec 26, 2019
Final sign-off
Aug 6, 2020
Declared cost
$15,000
Address
267 Holyoke St

remodel existing kitchen and bathroom fixtures. upgrade electrician panel to 200 amps and wires. replace existing stairs inkind and front facade windows in kind with all wood windows.

Open the permit page

$15,000
Aug 21, 2018Completed
final sign-off Feb 2023
300 Somerset Stcomply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg.
Details
Permit
201808217860
Status
complete
Filed
Aug 21, 2018
Permit issued
Jul 8, 2022
Final sign-off
Feb 15, 2023
Declared cost
$15,000
Address
300 Somerset St

comply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg.

Open the permit page

$15,000
Jun 26, 2018Completed
final sign-off Sep 2018
1742 36th Avadd deck & stairs at rear of building per plan.
Details
Permit
201806262925
Status
complete
Filed
Jun 26, 2018
Permit issued
Jun 29, 2018
Final sign-off
Sep 5, 2018
Declared cost
$15,000
Address
1742 36th Av

add deck & stairs at rear of building per plan.

Open the permit page

$15,000
Sep 7, 2017Completed
final sign-off May 2021
2183 Mission St Stinstall accessible entries/ramps at entrances, provide new 1 hr fire rated passageway. install (n) accessible toilet room; install (n) handrails on (e) stairs; renovate (e) storefront to make accessible; both tenant space are vacant and will remain vacant until spaces have been leased
Details
Permit
201709077211
Status
complete
Filed
Sep 7, 2017
Permit issued
Jul 18, 2018
Final sign-off
May 10, 2021
Declared cost
$100,000
Address
2183 Mission St St

install accessible entries/ramps at entrances, provide new 1 hr fire rated passageway. install (n) accessible toilet room; install (n) handrails on (e) stairs; renovate (e) storefront to make accessible; both tenant space are vacant and will remain vacant until spaces have been leased

Open the permit page

$100,000
Dec 8, 2016Completed
final sign-off Dec 2017
123 Precita Avto comply with complaint 201639701: repair (e) exterior staircase at rear of building in kind per plan
Details
Permit
201612084472
Status
complete
Filed
Dec 8, 2016
Permit issued
Feb 17, 2017
Final sign-off
Dec 15, 2017
Declared cost
$5,000
Address
123 Precita Av

to comply with complaint 201639701: repair (e) exterior staircase at rear of building in kind per plan

Open the permit page

$5,000
Mar 25, 2016Completed
final sign-off Jun 2016
52 Alvarado Streplace (e) rear stairs do not block exits
Details
Permit
201603253131
Status
complete
Filed
Mar 25, 2016
Permit issued
Mar 31, 2016
Final sign-off
Jun 28, 2016
Declared cost
$15,000
Address
52 Alvarado St

replace (e) rear stairs do not block exits

Open the permit page

$15,000