Ybj Construction Services
- Based in
- Fremont
- On San Francisco permits
- Jan 2009 to Apr 2023
- Last 24 months
- 0 permits filed
42 permits since 2000: 30 completed, 12 never finaled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 197 days from filing to permit and 286 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2018 | Completed final sign-off Dec 2019 | 2370 California St | remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popoutDetails
remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popout | $250,000 |
| Mar 31, 2017 | Completed final sign-off Sep 2018 | 272 O'farrell St | change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred.Details
change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred. | $110,000 |