Back to kitchen remodel contractors
Ybj Construction Services
- Based in
- Fremont
- On San Francisco permits
- Jan 2009 to Apr 2023
- Last 24 months
- 0 permits filed
42 permits since 2000: 30 completed, 12 never finaled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 102 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2019 | Completed final sign-off Apr 2020 | 1201 Ocean Av | remodel of dining area and kitchen, (n) restrooms and removal of all (e) ada barriers. (e) facade will be replaced w/ (n) mechanical limited to (n) fan & relocation of registers. electrical limited to (n) lighting in dining area. (n) cooking equipment (n) ansul system f/a, ansul defferralDetails
remodel of dining area and kitchen, (n) restrooms and removal of all (e) ada barriers. (e) facade will be replaced w/ (n) mechanical limited to (n) fan & relocation of registers. electrical limited to (n) lighting in dining area. (n) cooking equipment (n) ansul system f/a, ansul defferral | $750,000 |
| Sep 19, 2018 | Completed final sign-off Dec 2019 | 2370 California St | remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popoutDetails
remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popout | $250,000 |
| Mar 31, 2017 | Completed final sign-off Sep 2018 | 272 O'farrell St | change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred.Details
change of use. this project is a t.i. of an existing beauty salon (persons services) into a tea cafe (retail sales). the scope of work includes new store fron, signs, staircase, interior walls, finishes, kitchen equipment, and light fixtures. mechanical & fire protection is deferred. | $110,000 |
| Jul 7, 2015 | Completed final sign-off May 2016 | 235 Front St | decor upgrades, ada removal from dining and restrooms. kitchen upgrade. exterior work under separate permit. n/a for maherDetails
decor upgrades, ada removal from dining and restrooms. kitchen upgrade. exterior work under separate permit. n/a for maher | $300,000 |
| Apr 30, 2015 | Completed final sign-off Apr 2016 | 255 Winston Dr | upgrade existing facades, upgrade existing dining area with new decor, upgrade restrooms to meet ada requirements, minor kitchen updates.Details
upgrade existing facades, upgrade existing dining area with new decor, upgrade restrooms to meet ada requirements, minor kitchen updates. | $150,000 |
| Feb 9, 2015 | Completed final sign-off Apr 2015 | 441 Sutter St | revision to app#201312184521. scope is to relocate kitchen equipment and related mep. add under counter dishwasher and add structural anchorage for freestanding kiosks.Details
revision to app#201312184521. scope is to relocate kitchen equipment and related mep. add under counter dishwasher and add structural anchorage for freestanding kiosks. | $50,000 |
| Apr 29, 2013 | Completed final sign-off Apr 2014 | 2805 Mission St | exterior facade renovation. removal of mansard to be replaced with parapet & overhang, new glazing, modify planters to reduced height, new lighting, entry canopies; interior renovation; new seating layout & decoration, kitchen upgrade, new interior lighting, bathroom renovationDetails
exterior facade renovation. removal of mansard to be replaced with parapet & overhang, new glazing, modify planters to reduced height, new lighting, entry canopies; interior renovation; new seating layout & decoration, kitchen upgrade, new interior lighting, bathroom renovation | $300,000 |
| Jan 9, 2009 | Completed final sign-off Feb 2009 | 2016 Fillmore St | install new class ii kitchen hood & exhaust system & associated make-up air system including new roof mounted exhaust & supply fansDetails
install new class ii kitchen hood & exhaust system & associated make-up air system including new roof mounted exhaust & supply fans | $5,000 |