Back to bathroom remodel contractors
Ybj Construction Services
- Based in
- Fremont
- On San Francisco permits
- Jan 2009 to Apr 2023
- Last 24 months
- 0 permits filed
42 permits since 2000: 30 completed, 12 never finaled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 102 days from filing to permit and 296 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2018 | Completed final sign-off Dec 2019 | 2370 California St | remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popoutDetails
remove posts and beam from garage, new structure, relocate furnace and water heater, remodel reconfigure kitchen, 2 full baths, 1 powder remodel, 1 new powder. remove stair to attic, walls and doors at top attic stair. replace french door w/ slider at 2nd level rear, replace 2 windows at side popout | $250,000 |
| Apr 29, 2013 | Completed final sign-off Apr 2014 | 2805 Mission St | exterior facade renovation. removal of mansard to be replaced with parapet & overhang, new glazing, modify planters to reduced height, new lighting, entry canopies; interior renovation; new seating layout & decoration, kitchen upgrade, new interior lighting, bathroom renovationDetails
exterior facade renovation. removal of mansard to be replaced with parapet & overhang, new glazing, modify planters to reduced height, new lighting, entry canopies; interior renovation; new seating layout & decoration, kitchen upgrade, new interior lighting, bathroom renovation | $300,000 |