Back to kitchen remodel contractors
Winwin Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Jan 2026
- Last 24 months
- 5 permits filed
53 permits since 2000: 45 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 16 completed, 1 in progress, 2 never finaled. Typically 17 days from filing to permit and 331 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2024 | Completed final sign-off Mar 2025 | 1919 43rd Av | 1/f remodel one bathroom in-kind. 2/f: remodel one bathroom and one kitchen, in-kind.Details
1/f remodel one bathroom in-kind. 2/f: remodel one bathroom and one kitchen, in-kind. | $80,000 |
| Oct 1, 2024 | Completed final sign-off Mar 2025 | 1219 25th Av | 1/f:add 1 bed, 2 full bath,fmaily and laundry and a den. 2/f: remodel kitchen & bathroom, relocate bedroom. add 1 full bathroom. replace new front windows with alum clad wood replace front stairs with in-kind. 2-story addition.Details
1/f:add 1 bed, 2 full bath,fmaily and laundry and a den. 2/f: remodel kitchen & bathroom, relocate bedroom. add 1 full bathroom. replace new front windows with alum clad wood replace front stairs with in-kind. 2-story addition. | $240,000 |
| Sep 5, 2024 | Completed final sign-off Aug 2025 | 1445 38th Av | 1/f: new bedroom, media, office, 2 new bathrooms, wet bar. relocate laundry and mech. 2/f: remodel kitchen and living room. 2 new bathrooms.Details
1/f: new bedroom, media, office, 2 new bathrooms, wet bar. relocate laundry and mech. 2/f: remodel kitchen and living room. 2 new bathrooms. | $200,000 |
| Aug 6, 2024 | Completed final sign-off Sep 2025 | 1945 Fulton St | interior remodel of 1945 fulton st. convert storage area of garage level into livable space. (n) windows & doors. repair rear siding. (n) bedrooms & bathroom. remodel kitchenDetails
interior remodel of 1945 fulton st. convert storage area of garage level into livable space. (n) windows & doors. repair rear siding. (n) bedrooms & bathroom. remodel kitchen | $75,000 |
| May 20, 2024 | In progress issued Jul 2024 | 460 Lansdale Av | repair drywall throughout. window replacements at front and sides of the building. deck replacement in rear. repair 3 bathrooms & 2 kitchens. install new skylightDetails
repair drywall throughout. window replacements at front and sides of the building. deck replacement in rear. repair 3 bathrooms & 2 kitchens. install new skylight | $200,000 |
| May 22, 2023 | Completed final sign-off Oct 2023 | 475 Lansdale Av | 2/f: remodel kitchen, replace sheetrock in living and dining room with 5/8 type x and g/f: garage replace sheetrock with 5/8 type x and repair interior stairs 50% or less. no moving walls.Details
2/f: remodel kitchen, replace sheetrock in living and dining room with 5/8 type x and g/f: garage replace sheetrock with 5/8 type x and repair interior stairs 50% or less. no moving walls. | $70,000 |
| May 15, 2023 | Completed final sign-off Jan 2026 | 54 Chenery St | 1st fl 2 new bedrooms, 2 baths, relocate mech/laundry. 2nd fl remodel kitchen, relocate bathroom, add bathroom and frame new clDetails
1st fl 2 new bedrooms, 2 baths, relocate mech/laundry. 2nd fl remodel kitchen, relocate bathroom, add bathroom and frame new cl | $150,000 |
| Mar 15, 2023 | Completed final sign-off Jul 2024 | 924 Ortega St | 1/f: add guess bedroom, office, full bath and recreation room to include a kitchenette. 2/f: remodel kitchen, bathroom and stairs to 1/f and repair 50 percent or less (e) rear deck. 3/f: remodel of 2 (e) bathroom, adding a 3rd bathroom and re-coating an ext. roof deck. add recessed lights.Details
1/f: add guess bedroom, office, full bath and recreation room to include a kitchenette. 2/f: remodel kitchen, bathroom and stairs to 1/f and repair 50 percent or less (e) rear deck. 3/f: remodel of 2 (e) bathroom, adding a 3rd bathroom and re-coating an ext. roof deck. add recessed lights. | $380,000 |
| Jan 19, 2023 | Completed final sign-off Mar 2024 | 1575 32nd Av | 1st fl: add 2 bedrooms. family, laundry & 2 full baths. 2nd fl: remodel kitchen, bathroom. add 1 full bath & 1 bedroom. infill lightwell and courtyard. add new deck at rear. replace front windows in-kind with wood and new garage door (with wood)Details
1st fl: add 2 bedrooms. family, laundry & 2 full baths. 2nd fl: remodel kitchen, bathroom. add 1 full bath & 1 bedroom. infill lightwell and courtyard. add new deck at rear. replace front windows in-kind with wood and new garage door (with wood) | $150,000 |
| Jun 30, 2022 | Never finaled issued Jul 2022, no final | 618 Thornton Av | g/: remodel bedroom, add 1 bedroom, kitchenette, 1 bathroom & side door at gf.Details
g/: remodel bedroom, add 1 bedroom, kitchenette, 1 bathroom & side door at gf. | $40,000 |
| Nov 29, 2021 | Completed final sign-off Feb 2026 | 1947 31st Av | voluntary soft story seismic retrofit per ab094, 2019 cebc appendix 4a. two floor horizontal addition. 2nd fl add 245 sqft, remodel 2 (n) bathroom, living room, kitchen, add 2 bathroom. relocate living room, dining, kitchen. ground fl add 418 sqft rear storage room. ground floor add 451 sqft.Details
voluntary soft story seismic retrofit per ab094, 2019 cebc appendix 4a. two floor horizontal addition. 2nd fl add 245 sqft, remodel 2 (n) bathroom, living room, kitchen, add 2 bathroom. relocate living room, dining, kitchen. ground fl add 418 sqft rear storage room. ground floor add 451 sqft. | $100,000 |
| Oct 7, 2021 | Completed final sign-off Oct 2023 | 2174 42nd Av | ist floor installed by apn: 962205 (bedroom, family rm and bathroom). legalize dwelling unit at 1st fl per ordinance #43-14 (2-bedrooms, 1-bath rm and 1-kitchen at 1/f). install a rear deck/stairs from 2/f to rear yard.Details
ist floor installed by apn: 962205 (bedroom, family rm and bathroom). legalize dwelling unit at 1st fl per ordinance #43-14 (2-bedrooms, 1-bath rm and 1-kitchen at 1/f). install a rear deck/stairs from 2/f to rear yard. | $12,000 |
| Jul 23, 2021 | Never finaled issued Jul 2021, no final | 3584 17th St | unit 3584: remodel 1 kitchen & 1 bathroom, in-kind. unit 3586:remodel 1 kitchen & 1 bathroom in-kind. remove sheetrock in both units for structural expoloration. patch in-kind.Details
unit 3584: remodel 1 kitchen & 1 bathroom, in-kind. unit 3586:remodel 1 kitchen & 1 bathroom in-kind. remove sheetrock in both units for structural expoloration. patch in-kind. | $48,000 |
| Dec 11, 2019 | Completed final sign-off Jul 2020 | 210 Hazelwood Av | construct 2 bedrooms, 2 full baths, & family room on ground floor. relocate existing kitchen, bathroom, and one new bathroom. upgrade two existing bedrooms at 2nd flr. rebuilt existing interior staircase from 2nd flr down to ground flr. construct new cantilever deck (14'x6') at rear of building.Details
construct 2 bedrooms, 2 full baths, & family room on ground floor. relocate existing kitchen, bathroom, and one new bathroom. upgrade two existing bedrooms at 2nd flr. rebuilt existing interior staircase from 2nd flr down to ground flr. construct new cantilever deck (14'x6') at rear of building. | $186,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2020 | 1970 29th Av | remodel kitchen(replace cabinets and countertop), bathroom(tiles replacement), laundry and fireplace at 2nd floor. revision to app#201809261534. to comply with complaint #201921611. replace new furnace and new water heaterDetails
remodel kitchen(replace cabinets and countertop), bathroom(tiles replacement), laundry and fireplace at 2nd floor. revision to app#201809261534. to comply with complaint #201921611. replace new furnace and new water heater | $25,000 |
| Oct 12, 2018 | Completed final sign-off Sep 2019 | 1716 14th Av | exterior: infill triangle area inside bldg envelope/ horizontal addition. replace damage siding by kind. interior remodel 3 bathrooms and kitchen. add one bathroom on level 2. total 4 bds, 3.5 bathrooms.Details
exterior: infill triangle area inside bldg envelope/ horizontal addition. replace damage siding by kind. interior remodel 3 bathrooms and kitchen. add one bathroom on level 2. total 4 bds, 3.5 bathrooms. | $30,000 |
| Aug 6, 2018 | Completed final sign-off Jun 2019 | 1891 35th Av | construct (2) bed rm. (2) full bath rm & install new front door at ground fl. remodel (e) kitchen, bath rm and (1) bath rm,remove wall betwen kithcen/living rm & upgrade partial ceiling joist (e) 2nd fl.Details
construct (2) bed rm. (2) full bath rm & install new front door at ground fl. remodel (e) kitchen, bath rm and (1) bath rm,remove wall betwen kithcen/living rm & upgrade partial ceiling joist (e) 2nd fl. | $68,000 |
| Nov 15, 2017 | Completed final sign-off May 2019 | 175 Francisco St | remodeling of kitchen, remodeling of bathrooms. remodeling of existing stairs.Details
remodeling of kitchen, remodeling of bathrooms. remodeling of existing stairs. | $250,000 |
| Aug 4, 2017 | Completed final sign-off Nov 2019 | 105 Warren Dr | 1st fl remodel (e) floor for new bathroom, family rm, laundry and bedrooms; infill area under (e) bay. 2nd fl remodel (e) floor space to include kitchen and remove wall; 1-level wood deck at rear, modify (e) facade.Details
1st fl remodel (e) floor for new bathroom, family rm, laundry and bedrooms; infill area under (e) bay. 2nd fl remodel (e) floor space to include kitchen and remove wall; 1-level wood deck at rear, modify (e) facade. | $49,000 |