Block 3084, lot 010
210 Hazelwood Ave
- City’s use
- Single Family Residential
- Built
- 1924
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,405 sq ft
- Lot
- 3,998 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2025 | Completed final sign-off Dec 2025 | 210 Hazelwood Av | Voong's Roofing Company | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,000 |
| Jul 6, 2020 | Completed final sign-off Jul 2020 | 210 Hazelwood Av | rev to pa 201912119202 -see rev bubble, change in fixture count. new bathroom window on g/f bathroom #3, expand bath #4 into (e) closet, combine 3 windows in kitchen.Details
rev to pa 201912119202 -see rev bubble, change in fixture count. new bathroom window on g/f bathroom #3, expand bath #4 into (e) closet, combine 3 windows in kitchen. | $18,000 | |
| Feb 10, 2020 | Completed final sign-off Jun 2020 | 210 Hazelwood Av | Winwin Construction Inc | replace new windows (22+) for whole house and repair the stucco (street facing). front windows will be wood with custom detail to match the existing windows. both sides will be aluminum wood clad. rear windows will be milgaurd vinyl windows. max u-factor 0.32 or better.Details
replace new windows (22+) for whole house and repair the stucco (street facing). front windows will be wood with custom detail to match the existing windows. both sides will be aluminum wood clad. rear windows will be milgaurd vinyl windows. max u-factor 0.32 or better. | $10,000 |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 210 Hazelwood Av | Winwin Construction Inc | revision to pa #2019-1211-9202: structural revisions to beams & shearwallsDetails
revision to pa #2019-1211-9202: structural revisions to beams & shearwalls | |
| Dec 11, 2019 | Completed final sign-off Jul 2020 | 210 Hazelwood Av | Winwin Construction Inc | construct 2 bedrooms, 2 full baths, & family room on ground floor. relocate existing kitchen, bathroom, and one new bathroom. upgrade two existing bedrooms at 2nd flr. rebuilt existing interior staircase from 2nd flr down to ground flr. construct new cantilever deck (14'x6') at rear of building.Details
construct 2 bedrooms, 2 full baths, & family room on ground floor. relocate existing kitchen, bathroom, and one new bathroom. upgrade two existing bedrooms at 2nd flr. rebuilt existing interior staircase from 2nd flr down to ground flr. construct new cantilever deck (14'x6') at rear of building. | $186,000 |
| Oct 18, 2019 | Completed final sign-off Jun 2020 | 210 Hazelwood Av | Winwin Construction Inc | remodel kitchne 1 bathroom at second floor. remodel in kind. no wall moved.Details
remodel kitchne 1 bathroom at second floor. remodel in kind. no wall moved. | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Winwin Construction Inc (4), Voong's Roofing Company
- Architects
- Doug Lee
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.