Winwin Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Jan 2026
- Last 24 months
- 5 permits filed
53 permits since 2000: 45 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 6 completed, 1 in progress. Typically 44 days from filing to permit and 346 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2025 | Completed final sign-off Aug 2025 | 1445 38th Av | new deck at rear less than 10-ft above grade with spiral stairs. add skylights to pa 202409050152.Details
new deck at rear less than 10-ft above grade with spiral stairs. add skylights to pa 202409050152. | $20,000 |
| May 20, 2024 | In progress issued Jul 2024 | 460 Lansdale Av | repair drywall throughout. window replacements at front and sides of the building. deck replacement in rear. repair 3 bathrooms & 2 kitchens. install new skylightDetails
repair drywall throughout. window replacements at front and sides of the building. deck replacement in rear. repair 3 bathrooms & 2 kitchens. install new skylight | $200,000 |
| Mar 15, 2023 | Completed final sign-off Jul 2024 | 924 Ortega St | 1/f: add guess bedroom, office, full bath and recreation room to include a kitchenette. 2/f: remodel kitchen, bathroom and stairs to 1/f and repair 50 percent or less (e) rear deck. 3/f: remodel of 2 (e) bathroom, adding a 3rd bathroom and re-coating an ext. roof deck. add recessed lights.Details
1/f: add guess bedroom, office, full bath and recreation room to include a kitchenette. 2/f: remodel kitchen, bathroom and stairs to 1/f and repair 50 percent or less (e) rear deck. 3/f: remodel of 2 (e) bathroom, adding a 3rd bathroom and re-coating an ext. roof deck. add recessed lights. | $380,000 |
| Jan 19, 2023 | Completed final sign-off Mar 2024 | 1575 32nd Av | 1st fl: add 2 bedrooms. family, laundry & 2 full baths. 2nd fl: remodel kitchen, bathroom. add 1 full bath & 1 bedroom. infill lightwell and courtyard. add new deck at rear. replace front windows in-kind with wood and new garage door (with wood)Details
1st fl: add 2 bedrooms. family, laundry & 2 full baths. 2nd fl: remodel kitchen, bathroom. add 1 full bath & 1 bedroom. infill lightwell and courtyard. add new deck at rear. replace front windows in-kind with wood and new garage door (with wood) | $150,000 |
| Oct 7, 2021 | Completed final sign-off Oct 2023 | 2174 42nd Av | ist floor installed by apn: 962205 (bedroom, family rm and bathroom). legalize dwelling unit at 1st fl per ordinance #43-14 (2-bedrooms, 1-bath rm and 1-kitchen at 1/f). install a rear deck/stairs from 2/f to rear yard.Details
ist floor installed by apn: 962205 (bedroom, family rm and bathroom). legalize dwelling unit at 1st fl per ordinance #43-14 (2-bedrooms, 1-bath rm and 1-kitchen at 1/f). install a rear deck/stairs from 2/f to rear yard. | $12,000 |
| Dec 11, 2019 | Completed final sign-off Jul 2020 | 210 Hazelwood Av | construct 2 bedrooms, 2 full baths, & family room on ground floor. relocate existing kitchen, bathroom, and one new bathroom. upgrade two existing bedrooms at 2nd flr. rebuilt existing interior staircase from 2nd flr down to ground flr. construct new cantilever deck (14'x6') at rear of building.Details
construct 2 bedrooms, 2 full baths, & family room on ground floor. relocate existing kitchen, bathroom, and one new bathroom. upgrade two existing bedrooms at 2nd flr. rebuilt existing interior staircase from 2nd flr down to ground flr. construct new cantilever deck (14'x6') at rear of building. | $186,000 |
| Aug 4, 2017 | Completed final sign-off Nov 2019 | 105 Warren Dr | 1st fl remodel (e) floor for new bathroom, family rm, laundry and bedrooms; infill area under (e) bay. 2nd fl remodel (e) floor space to include kitchen and remove wall; 1-level wood deck at rear, modify (e) facade.Details
1st fl remodel (e) floor for new bathroom, family rm, laundry and bedrooms; infill area under (e) bay. 2nd fl remodel (e) floor space to include kitchen and remove wall; 1-level wood deck at rear, modify (e) facade. | $49,000 |