Back to kitchen remodel contractors
Winans Construction
- Based in
- Oakland
- On San Francisco permits
- Apr 2000 to Nov 2010
- Last 24 months
- 0 permits filed
50 permits since 2000: 44 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 12 completed. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2010 | Completed final sign-off Dec 2010 | 875 Church St | replace cabinets, relocate some appliances, upgrade lighting & plumbing. no moving or adding walls in the kitchen.Details
replace cabinets, relocate some appliances, upgrade lighting & plumbing. no moving or adding walls in the kitchen. | $40,000 |
| Jan 19, 2010 | Completed final sign-off Mar 2010 | 481 Benton Av | remodel two kitchen; in-kind, non-structural. update electrical panels, min 50% of kitchen lighting wattage shall be of fluorescent lights.Details
remodel two kitchen; in-kind, non-structural. update electrical panels, min 50% of kitchen lighting wattage shall be of fluorescent lights. | $35,000 |
| Sep 23, 2009 | Completed final sign-off Jan 2010 | 195 Duboce Av | remodel kitchen, install new cabinets, doors & counters. new lighting at least 50% lighting wattage high efficacyDetails
remodel kitchen, install new cabinets, doors & counters. new lighting at least 50% lighting wattage high efficacy | $17,000 |
| Jan 9, 2008 | Completed final sign-off Mar 2008 | 454 15th Av | kitchen & dining remodeling, remove 1 load-bearing wall, 1 non-load bearing chase,close-off door opening from kitchen to power room & create entry to powder room thru dining room & breakfast nook. new footing @ garage to support load transferred down from (n) header/post syst. replaces bearing wall.Details
kitchen & dining remodeling, remove 1 load-bearing wall, 1 non-load bearing chase,close-off door opening from kitchen to power room & create entry to powder room thru dining room & breakfast nook. new footing @ garage to support load transferred down from (n) header/post syst. replaces bearing wall. | $65,000 |
| May 16, 2006 | Completed final sign-off Nov 2006 | 1374 12th Av | kitchen remodel, remove & replace fittings and fixtures, relocate range, remove door to laundry. remove (1) window at hallway and replace with passthroughDetails
kitchen remodel, remove & replace fittings and fixtures, relocate range, remove door to laundry. remove (1) window at hallway and replace with passthrough | $30,000 |
| Dec 13, 2004 | Completed final sign-off Aug 2005 | 881 Clayton St | kitchen remodel including new fittings and fixtures, 3 bathroom remodels including new fittingsDetails
kitchen remodel including new fittings and fixtures, 3 bathroom remodels including new fittings | $300,000 |
| Mar 10, 2004 | Completed final sign-off Jul 2004 | 148 Carnelian Wy | kitchen remodel: remove & replace finishes & fixtures including: cabinets, range, sink, faucet. dishDetails
kitchen remodel: remove & replace finishes & fixtures including: cabinets, range, sink, faucet. dish | $35,000 |
| Jun 5, 2003 | Completed final sign-off Sep 2003 | 219 03rd Av | remove wall finishes at interiors-garage level utility area, 1st floor, kitchen bath bedroom, laundrDetails
remove wall finishes at interiors-garage level utility area, 1st floor, kitchen bath bedroom, laundr | $4,000 |
| Jan 23, 2003 | Completed final sign-off Jun 2003 | 1648 Plymouth Av | kitchen remodel, including new bay window at south side. 2 bths (adjoining) remodeled, including rewDetails
kitchen remodel, including new bay window at south side. 2 bths (adjoining) remodeled, including rew | $87,000 |
| Sep 6, 2002 | Completed final sign-off Sep 2002 | 171 Juanita Wy | add 1 skylight @ kitchenDetails
add 1 skylight @ kitchen | $2,000 |
| Jun 25, 2002 | Completed final sign-off Nov 2002 | 171 Juanita Wy | kitchen remodel & remove & replace flooring,cabinets,counters,&related finishes & fittings.electricaDetails
kitchen remodel & remove & replace flooring,cabinets,counters,&related finishes & fittings.electrica | $37,500 |
| Apr 4, 2001 | Completed final sign-off Aug 2001 | 32 06th Av | remodel kitchen & powder rm on main fl., remove & replace cabinets, counters, flooring, etc.Details
remodel kitchen & powder rm on main fl., remove & replace cabinets, counters, flooring, etc. | $32,000 |