Back to bathroom remodel contractors
Winans Construction
- Based in
- Oakland
- On San Francisco permits
- Apr 2000 to Nov 2010
- Last 24 months
- 0 permits filed
50 permits since 2000: 44 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2006 | Completed final sign-off Dec 2006 | 219 03rd Av | master bedroom remodel including: new bathroom with vanity, shower & toilet, cabinets. add 2 closets, 3 skylights. rework door way @ bedroom #1, add cabinet.Details
master bedroom remodel including: new bathroom with vanity, shower & toilet, cabinets. add 2 closets, 3 skylights. rework door way @ bedroom #1, add cabinet. | $80,000 |
| Mar 30, 2006 | Completed final sign-off May 2006 | 218 Edgewood Av | remove tub & replace with shower in existing bathroom. no change to partitions or windows.Details
remove tub & replace with shower in existing bathroom. no change to partitions or windows. | $1,000 |
| Dec 13, 2004 | Completed final sign-off Aug 2005 | 881 Clayton St | kitchen remodel including new fittings and fixtures, 3 bathroom remodels including new fittingsDetails
kitchen remodel including new fittings and fixtures, 3 bathroom remodels including new fittings | $300,000 |
| Jun 10, 2004 | Completed final sign-off Sep 2004 | 201 San Fernando Wy | bathroom remodel (2) including relocation of fixtures, removal of non-load bearing wallsDetails
bathroom remodel (2) including relocation of fixtures, removal of non-load bearing walls | $60,000 |
| Feb 2, 2004 | Completed final sign-off Jul 2004 | 183 Carnelian Wy | remodel bathroom expand into previsouly (e) undeveloped space on the lower levelDetails
remodel bathroom expand into previsouly (e) undeveloped space on the lower level | $50,000 |
| Jun 5, 2003 | Completed final sign-off Sep 2003 | 219 03rd Av | remove wall finishes at interiors-garage level utility area, 1st floor, kitchen bath bedroom, laundrDetails
remove wall finishes at interiors-garage level utility area, 1st floor, kitchen bath bedroom, laundr | $4,000 |
| Mar 28, 2003 | Completed final sign-off May 2003 | 148 Carnelian Wy | remove and replace (e) finishes at 2 bathrooms, fixtures back to the same placeDetails
remove and replace (e) finishes at 2 bathrooms, fixtures back to the same place | $28,000 |