Back to kitchen remodel contractors
Williams Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Jul 2025
- Last 24 months
- 7 permits filed
73 permits since 2000: 53 completed, 1 in progress, 6 never finaled, 13 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2024 | Expired or cancelled expired Jun 2026 | 32 Parker Av | rev 202210214898 - revise south window layout in kitchen and laudry roomDetails
rev 202210214898 - revise south window layout in kitchen and laudry room | |
| Oct 22, 2024 | Expired or cancelled expired Jun 2026 | 32 Parker Av | revision to permit#: 202210214897. revised kitchen, laundry, and bedroom #2 layout. new gas fireplace location.Details
revision to permit#: 202210214897. revised kitchen, laundry, and bedroom #2 layout. new gas fireplace location. | |
| Jun 24, 2019 | Completed final sign-off May 2020 | 47 Cole St | add 1/2 bath to workshop at 1st fl remodel kitchen at 2nd flDetails
add 1/2 bath to workshop at 1st fl remodel kitchen at 2nd fl | $35,000 |
| Oct 18, 2018 | Completed final sign-off Dec 2019 | 72 Parker Av | renovation of interior of (e) flat on 2/f. remodel of (e) kitchen & (e) master bath into master and powder room. new partitions and minor structural work (beam. new lighting and plumbing fixtures. remodel (e) laundry room.Details
renovation of interior of (e) flat on 2/f. remodel of (e) kitchen & (e) master bath into master and powder room. new partitions and minor structural work (beam. new lighting and plumbing fixtures. remodel (e) laundry room. | $100,000 |
| Jul 13, 2018 | Completed final sign-off Nov 2019 | 112 28th St | kitchen remodel add half bathroom remove load bearing wallDetails
kitchen remodel add half bathroom remove load bearing wall | $55,000 |
| Apr 2, 2018 | Completed final sign-off Sep 2020 | 940 Duncan St | replace kitchen cabinets and install appliancesDetails
replace kitchen cabinets and install appliances | $25,000 |
| Mar 21, 2017 | Completed final sign-off Dec 2017 | 624 Brussels St | remodel.alteration including addition of half bath, kitchen remodel, bath remodel, hvac, water heating and fenestrationDetails
remodel.alteration including addition of half bath, kitchen remodel, bath remodel, hvac, water heating and fenestration | $103,558 |
| Feb 21, 2017 | Completed final sign-off Oct 2017 | 56 Magnolia St | kitchen and bath remodel. no walls moved.Details
kitchen and bath remodel. no walls moved. | $25,000 |
| Jun 20, 2016 | Completed final sign-off Apr 2017 | 1305 Scott St | kitchen & batroom remodel; no walls moved/removed/added/walled; all (e) layouts to remain unchanged.Details
kitchen & batroom remodel; no walls moved/removed/added/walled; all (e) layouts to remain unchanged. | $50,000 |
| Jun 17, 2015 | Completed final sign-off Oct 2016 | 455 Vallejo St | unit ph6: remodel kitchen and bathroom. no structural work.Details
unit ph6: remodel kitchen and bathroom. no structural work. | $50,000 |
| Oct 24, 2014 | Completed final sign-off Jan 2016 | 461 Collingwood St | remodel (e) ground floor family room, remove illegal kitchen & replace with full bathroom, replace sliding glass door with larger sliding glass door. central air heating system to be replaced with hydronic radiant floor system.Details
remodel (e) ground floor family room, remove illegal kitchen & replace with full bathroom, replace sliding glass door with larger sliding glass door. central air heating system to be replaced with hydronic radiant floor system. | $71,000 |
| Jul 11, 2014 | Completed final sign-off May 2016 | 7 Short St | remodel e kitchen, reconfigure e stair, remodel bath on 2nd fl, relocate entry door, add planter walls, skylight in bedroom, (n) exterior stair & guard at west elev.Details
remodel e kitchen, reconfigure e stair, remodel bath on 2nd fl, relocate entry door, add planter walls, skylight in bedroom, (n) exterior stair & guard at west elev. | $60,000 |
| Sep 26, 2012 | Completed final sign-off May 2013 | 1048 Haight St | remodel kitchen and bathroom (1048); remodel kitchen and (2) bathrooms (1050), no change on walls and openingDetails
remodel kitchen and bathroom (1048); remodel kitchen and (2) bathrooms (1050), no change on walls and opening | $80,000 |
| Jul 20, 2012 | Completed final sign-off Nov 2012 | 472 12th Av | remodel kitchen, new cabinets, appliances, new electrical & relocate gas line (seperate permit)Details
remodel kitchen, new cabinets, appliances, new electrical & relocate gas line (seperate permit) | $20,000 |
| May 16, 2012 | Completed final sign-off Aug 2012 | 546 03rd Av | rear cottage- kitchen & bath remodel, replace siding with hardie plank, replace door and 2 windows in existing openings, not visable from street.Details
rear cottage- kitchen & bath remodel, replace siding with hardie plank, replace door and 2 windows in existing openings, not visable from street. | $20,000 |
| Feb 18, 2003 | Completed final sign-off Oct 2003 | 816 Alvarado St | kitchen remodelDetails
kitchen remodel | $25,000 |