Williams Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Jul 2025
- Last 24 months
- 7 permits filed
73 permits since 2000: 53 completed, 1 in progress, 6 never finaled, 13 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 10 completed, 1 never finaled, 1 expired or cancelled. Typically 42 days from filing to permit and 444 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2024 | Expired or cancelled expired Jun 2026 | 32 Parker Av | revision to permit #202201045337. remove interior stair wall revised window layout in new stair penthouse.Details
revision to permit #202201045337. remove interior stair wall revised window layout in new stair penthouse. | |
| Oct 11, 2022 | Completed final sign-off Jun 2024 | 1759 28th Av | at garage level: re-configure non-loadbearing walls, move hvac and water heater, move washer and dryer to under stairs, add french slider to rear yard. on upper level: add bathroom, create master suites, re-configure non-loading bearing walls.Details
at garage level: re-configure non-loadbearing walls, move hvac and water heater, move washer and dryer to under stairs, add french slider to rear yard. on upper level: add bathroom, create master suites, re-configure non-loading bearing walls. | $85,000 |
| Aug 1, 2022 | Completed final sign-off Jun 2023 | 1283 16th Av | convert (e) garage into conditioned living space with bedroom, bathroom, media room & laundry. upgrade interior stairs.Details
convert (e) garage into conditioned living space with bedroom, bathroom, media room & laundry. upgrade interior stairs. | $100,000 |
| Jan 4, 2022 | Completed final sign-off Jun 2026 | 32 Parker Av | new roof deck with stair penthouse for roof access. deck infrastructure includes a gas bbq and fire pit and permanent lighting.Details
new roof deck with stair penthouse for roof access. deck infrastructure includes a gas bbq and fire pit and permanent lighting. | $125,000 |
| Jan 31, 2020 | Completed final sign-off Nov 2020 | 185 16th Av | revision to pa 2019-1016-4600 (common area) stair structural repair of (e) exterior stairs) in kindDetails
revision to pa 2019-1016-4600 (common area) stair structural repair of (e) exterior stairs) in kind | $4,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 187 16th Av | repair rear stairs in kind, less than 50%Details
repair rear stairs in kind, less than 50% | $3,000 |
| Apr 25, 2017 | Never finaled issued Jul 2017, no final | 624 Brussels St | rev. to pa#201703211913 (n) conditioned space within (e) envelope at garage level, (n) bath, (n) bedroom and home office, (n) foundation. reconfiguration of (e) deck & exterior stair.Details
rev. to pa#201703211913 (n) conditioned space within (e) envelope at garage level, (n) bath, (n) bedroom and home office, (n) foundation. reconfiguration of (e) deck & exterior stair. | $45,000 |
| Sep 14, 2016 | Completed final sign-off Jan 2020 | 768 Dartmouth St | horizontal addition. two story rear addition of house, new roof deck & stairs, 1st fl is 2 bedrooms, 1 bath, 1 lavndry. 2nd fl addition is dining room. roof deck is over new bedroom @ 1st floor.Details
horizontal addition. two story rear addition of house, new roof deck & stairs, 1st fl is 2 bedrooms, 1 bath, 1 lavndry. 2nd fl addition is dining room. roof deck is over new bedroom @ 1st floor. | $150,000 |
| Jun 27, 2016 | Completed final sign-off Apr 2017 | 1305 Scott St | add 2 skylights 1 above stairs and 1 in bathroomDetails
add 2 skylights 1 above stairs and 1 in bathroom | $5,000 |
| Jan 29, 2015 | Completed final sign-off Jul 2015 | 461 Collingwood St | revision to app#201410249797 which include reconfigure stair infill of a lightwell, and other misc. framing changes. area of work increased by 79 sq ft.Details
revision to app#201410249797 which include reconfigure stair infill of a lightwell, and other misc. framing changes. area of work increased by 79 sq ft. | $25,000 |
| Jul 11, 2014 | Completed final sign-off May 2016 | 7 Short St | remodel e kitchen, reconfigure e stair, remodel bath on 2nd fl, relocate entry door, add planter walls, skylight in bedroom, (n) exterior stair & guard at west elev.Details
remodel e kitchen, reconfigure e stair, remodel bath on 2nd fl, relocate entry door, add planter walls, skylight in bedroom, (n) exterior stair & guard at west elev. | $60,000 |
| Nov 19, 2009 | Completed final sign-off Nov 2014 | 4426 20th St | repair and replace deck, add firewall along east property line, rebuild stair at new location.Details
repair and replace deck, add firewall along east property line, rebuild stair at new location. | $20,000 |