Back to kitchen remodel contractors
Will P K Ng Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Dec 2022
- Last 24 months
- 0 permits filed
96 permits since 2000: 79 completed, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 19 completed, 2 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2022 | Completed final sign-off Mar 2024 | 381 Park St | 2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms.Details
2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms. | $109,000 |
| Oct 20, 2022 | Completed final sign-off Aug 2024 | 36 Monticello St | reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yardDetails
reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yard | $50,000 |
| Nov 16, 2021 | Completed final sign-off Oct 2023 | 420 Colon Av | add kitchenette to existing family room at ground floor.Details
add kitchenette to existing family room at ground floor. | $5,000 |
| Sep 17, 2021 | Completed final sign-off Sep 2022 | 3673 Mission St | add kitchenette at 1/f to (e) habitable space. ref pa202006259122.Details
add kitchenette at 1/f to (e) habitable space. ref pa202006259122. | $5,000 |
| Jun 23, 2021 | Completed final sign-off Sep 2021 | 2840 San Bruno Av | unit #8: remdel kitchen & convert dining to bedroom.Details
unit #8: remdel kitchen & convert dining to bedroom. | $22,000 |
| May 11, 2021 | Completed final sign-off Aug 2021 | 21 Stone St | kitchen (65 sf) and bathroom (40 sf) remodel in-kindDetails
kitchen (65 sf) and bathroom (40 sf) remodel in-kind | $16,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 579 Naples St | 1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer.Details
1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer. | $98,000 |
| May 10, 2021 | Completed final sign-off Feb 2023 | 735 Peralta Av | comply with complaint 202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel (e) abondaned bldg - rear bldg: remodel bath/bedroom & add kitchenette.Details
comply with complaint 202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel (e) abondaned bldg - rear bldg: remodel bath/bedroom & add kitchenette. | $20,000 |
| Feb 12, 2021 | Never finaled issued Apr 2021, no final | 20 Rosewood Dr | 1/f: remodel kitchen & bathroom. 2/f: remodel bathroom & add 1 full bathroom.Details
1/f: remodel kitchen & bathroom. 2/f: remodel bathroom & add 1 full bathroom. | $50,000 |
| Jun 25, 2020 | Completed final sign-off Jan 2021 | 3673 Mission St | repair fire damage in 2 kitchen (12x12.5) and sheetrock (replace with 5/8" type "x" gyp. bd. to maintain unit separation as needed).Details
repair fire damage in 2 kitchen (12x12.5) and sheetrock (replace with 5/8" type "x" gyp. bd. to maintain unit separation as needed). | $31,000 |
| Sep 20, 2019 | Completed final sign-off Jan 2021 | 2938 25th Av | remodel kitchen & bathroom, add one full bath & half bath at 2nd fl.Details
remodel kitchen & bathroom, add one full bath & half bath at 2nd fl. | $48,600 |
| Feb 21, 2019 | Completed final sign-off May 2019 | 130 Downey St | remodel (e) kitchen (8'x6') and bathroom (5'x8') on 2nd floor. installation of ceiling sound board and 5/8" type x sheetrock.Details
remodel (e) kitchen (8'x6') and bathroom (5'x8') on 2nd floor. installation of ceiling sound board and 5/8" type x sheetrock. | $7,000 |
| May 4, 2018 | Completed final sign-off Feb 2020 | 3033 Alemany Bl | to comply with nov# 201839201. remove (e) kitchen on ground floor.Details
to comply with nov# 201839201. remove (e) kitchen on ground floor. | $18,000 |
| Aug 15, 2017 | Completed final sign-off Dec 2017 | 190 Brighton Av | unit #2: repair sheetrock area=700 sq. ft. remodel bathroom and kitchen #2 unit. no structural work.Details
unit #2: repair sheetrock area=700 sq. ft. remodel bathroom and kitchen #2 unit. no structural work. | $25,000 |
| Sep 30, 2016 | Completed final sign-off May 2017 | 74 Farview Ct | to comply with complaint #201639531, remodel kitchen and bathroom, add one bedroom, (4) skylights & two full bathrooms per plan.Details
to comply with complaint #201639531, remodel kitchen and bathroom, add one bedroom, (4) skylights & two full bathrooms per plan. | $46,300 |
| Sep 16, 2016 | Expired or cancelled cancelled Dec 2016 | 4333 Cabrillo St | upper stair kitchen and bathroom remodel in kindDetails
upper stair kitchen and bathroom remodel in kind | $5,000 |
| Jun 8, 2016 | Completed final sign-off Sep 2016 | 2347 30th Av | revision to approved app#201605056695. reconfigure kitchen and add one full bath at 2nd floor per plan.Details
revision to approved app#201605056695. reconfigure kitchen and add one full bath at 2nd floor per plan. | $11,000 |
| May 5, 2016 | Completed final sign-off Sep 2016 | 2347 30th Av | remodel kitchen & dining room at 2nd floor. reconfigure layout per planDetails
remodel kitchen & dining room at 2nd floor. reconfigure layout per plan | $23,000 |
| Aug 25, 2015 | Never finaled issued Aug 2015, no final | 2960 24th Av | remodel kitchen. 1 1/2 bath room at 2nd flr. in kitchen : replace cabinets, countertops, sink & floor tile. bathrooms: replace tub, vanity & floor tileDetails
remodel kitchen. 1 1/2 bath room at 2nd flr. in kitchen : replace cabinets, countertops, sink & floor tile. bathrooms: replace tub, vanity & floor tile | $33,000 |
| Jul 29, 2013 | Completed final sign-off Jan 2014 | 2170 35th Av | replace kitchen cabinets with new cabinets.Details
replace kitchen cabinets with new cabinets. | $6,000 |
| Sep 23, 2011 | Completed final sign-off Mar 2012 | 420 Colon Av | revision to pa# 2011-0908-4155-comply w/correction notice, replace/repair foundation at ground floor & replace header at kitchen areaDetails
revision to pa# 2011-0908-4155-comply w/correction notice, replace/repair foundation at ground floor & replace header at kitchen area | $6,000 |
| Aug 18, 2011 | Completed final sign-off Mar 2012 | 420 Colon Av | remodel kitchen & 2 bathrooms, no structural work & (n) lighting comply with cec 150 (k), provide carbon monoxide alarm, repair stucco at sides and rear, not visible from street, no structural work, repair and repl stucco in kindDetails
remodel kitchen & 2 bathrooms, no structural work & (n) lighting comply with cec 150 (k), provide carbon monoxide alarm, repair stucco at sides and rear, not visible from street, no structural work, repair and repl stucco in kind | $12,000 |