Back to bathroom remodel contractors
Will P K Ng Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Dec 2022
- Last 24 months
- 0 permits filed
96 permits since 2000: 79 completed, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 19 completed, 3 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2022 | Completed final sign-off Mar 2024 | 381 Park St | 2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms.Details
2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms. | $109,000 |
| Oct 20, 2022 | Completed final sign-off Aug 2024 | 36 Monticello St | reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yardDetails
reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yard | $50,000 |
| May 11, 2021 | Completed final sign-off Aug 2021 | 21 Stone St | kitchen (65 sf) and bathroom (40 sf) remodel in-kindDetails
kitchen (65 sf) and bathroom (40 sf) remodel in-kind | $16,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 579 Naples St | 1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer.Details
1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer. | $98,000 |
| May 10, 2021 | Completed final sign-off Feb 2023 | 735 Peralta Av | comply with complaint 202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel (e) abondaned bldg - rear bldg: remodel bath/bedroom & add kitchenette.Details
comply with complaint 202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel (e) abondaned bldg - rear bldg: remodel bath/bedroom & add kitchenette. | $20,000 |
| May 10, 2021 | Completed final sign-off Mar 2023 | 735 Peralta Av | comply w/202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel(e)abondaned bldg, front bldg:add family rm, office, bath & media @ 1/f. (n) interior stairway, replce windows @ front w/alum-clad wood wdws, replace (e) stucco @ upper front. rev. to 202009103862Details
comply w/202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel(e)abondaned bldg, front bldg:add family rm, office, bath & media @ 1/f. (n) interior stairway, replce windows @ front w/alum-clad wood wdws, replace (e) stucco @ upper front. rev. to 202009103862 | $75,000 |
| Feb 12, 2021 | Never finaled issued Apr 2021, no final | 20 Rosewood Dr | 1/f: remodel kitchen & bathroom. 2/f: remodel bathroom & add 1 full bathroom.Details
1/f: remodel kitchen & bathroom. 2/f: remodel bathroom & add 1 full bathroom. | $50,000 |
| Sep 25, 2019 | Completed final sign-off Feb 2021 | 731 Clay St | to correct nov 201981981 expansion of room 10 to add bath, remodel e bathDetails
to correct nov 201981981 expansion of room 10 to add bath, remodel e bath | $10,000 |
| Sep 20, 2019 | Completed final sign-off Jan 2021 | 2938 25th Av | remodel kitchen & bathroom, add one full bath & half bath at 2nd fl.Details
remodel kitchen & bathroom, add one full bath & half bath at 2nd fl. | $48,600 |
| Mar 12, 2019 | Completed final sign-off Jun 2021 | 3229 Lincoln Wy | revision to pa #201507222200. 1st flr - relocate furnace from unit b to 2nd flr. create hallway to separate family rm & entrance, add (2) 3 fixture bath and 1 closet. 2nd flr - add closet under staircase. 3rd flr - expand the 3 fixture bath. relocate furnace for unit a to 2nd flr.Details
revision to pa #201507222200. 1st flr - relocate furnace from unit b to 2nd flr. create hallway to separate family rm & entrance, add (2) 3 fixture bath and 1 closet. 2nd flr - add closet under staircase. 3rd flr - expand the 3 fixture bath. relocate furnace for unit a to 2nd flr. | $40,000 |
| Feb 21, 2019 | Completed final sign-off May 2019 | 130 Downey St | remodel (e) kitchen (8'x6') and bathroom (5'x8') on 2nd floor. installation of ceiling sound board and 5/8" type x sheetrock.Details
remodel (e) kitchen (8'x6') and bathroom (5'x8') on 2nd floor. installation of ceiling sound board and 5/8" type x sheetrock. | $7,000 |
| Aug 15, 2017 | Completed final sign-off Dec 2017 | 190 Brighton Av | unit #2: repair sheetrock area=700 sq. ft. remodel bathroom and kitchen #2 unit. no structural work.Details
unit #2: repair sheetrock area=700 sq. ft. remodel bathroom and kitchen #2 unit. no structural work. | $25,000 |
| Sep 30, 2016 | Completed final sign-off May 2017 | 74 Farview Ct | to comply with complaint #201639531, remodel kitchen and bathroom, add one bedroom, (4) skylights & two full bathrooms per plan.Details
to comply with complaint #201639531, remodel kitchen and bathroom, add one bedroom, (4) skylights & two full bathrooms per plan. | $46,300 |
| Sep 16, 2016 | Expired or cancelled cancelled Dec 2016 | 4333 Cabrillo St | upper stair kitchen and bathroom remodel in kindDetails
upper stair kitchen and bathroom remodel in kind | $5,000 |
| Sep 9, 2016 | Completed final sign-off Jan 2017 | 4333 Cabrillo St | convert lower level into habitable space - 3 bedrooms and 1 bath, add media room. no change of layout at upstairs.Details
convert lower level into habitable space - 3 bedrooms and 1 bath, add media room. no change of layout at upstairs. | $30,000 |
| Jul 7, 2016 | Completed final sign-off Jun 2017 | 1643 21st Av | add 3 bedrooms, 2 full baths & mudroom on 1st floor. remodel (e) bathroom & powder room on 2nd floor per plan. remodel (e) bathroom & powder room on 2nd floor per planDetails
add 3 bedrooms, 2 full baths & mudroom on 1st floor. remodel (e) bathroom & powder room on 2nd floor per plan. remodel (e) bathroom & powder room on 2nd floor per plan | $45,000 |
| Jun 8, 2016 | Completed final sign-off Sep 2016 | 2347 30th Av | revision to approved app#201605056695. reconfigure kitchen and add one full bath at 2nd floor per plan.Details
revision to approved app#201605056695. reconfigure kitchen and add one full bath at 2nd floor per plan. | $11,000 |
| Nov 2, 2015 | Completed final sign-off Feb 2016 | 2333 17th Av | remodel exercise room, add 1/2 bath and study room on ground floor.Details
remodel exercise room, add 1/2 bath and study room on ground floor. | $20,000 |
| Aug 25, 2015 | Never finaled issued Aug 2015, no final | 2960 24th Av | remodel kitchen. 1 1/2 bath room at 2nd flr. in kitchen : replace cabinets, countertops, sink & floor tile. bathrooms: replace tub, vanity & floor tileDetails
remodel kitchen. 1 1/2 bath room at 2nd flr. in kitchen : replace cabinets, countertops, sink & floor tile. bathrooms: replace tub, vanity & floor tile | $33,000 |
| Mar 30, 2015 | Never finaled issued Mar 2015, no final | 190 Brighton Av | repair sheetrock with area 800 sq ft. remodel extg bathroom at unit #3 only.Details
repair sheetrock with area 800 sq ft. remodel extg bathroom at unit #3 only. | $10,000 |
| Mar 14, 2014 | Completed final sign-off Sep 2014 | 90 Balceta Av | add two bedrooms, two full bathrooms and play room at basement floor per planDetails
add two bedrooms, two full bathrooms and play room at basement floor per plan | $36,500 |
| Sep 8, 2011 | Completed final sign-off Mar 2012 | 420 Colon Av | remodel play room, storage room & add one bedroom, family room & two bathrooms at ground floor.Details
remodel play room, storage room & add one bedroom, family room & two bathrooms at ground floor. | $33,000 |
| Aug 18, 2011 | Completed final sign-off Mar 2012 | 420 Colon Av | remodel kitchen & 2 bathrooms, no structural work & (n) lighting comply with cec 150 (k), provide carbon monoxide alarm, repair stucco at sides and rear, not visible from street, no structural work, repair and repl stucco in kindDetails
remodel kitchen & 2 bathrooms, no structural work & (n) lighting comply with cec 150 (k), provide carbon monoxide alarm, repair stucco at sides and rear, not visible from street, no structural work, repair and repl stucco in kind | $12,000 |