Will P K Ng Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Dec 2022
- Last 24 months
- 0 permits filed
96 permits since 2000: 79 completed, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 21 days from filing to permit and 243 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2022 | Completed final sign-off Aug 2024 | 36 Monticello St | reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yardDetails
reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yard | $50,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 579 Naples St | 1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer.Details
1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer. | $98,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2023 | 749 Webster St | re-built dry rotted front entry stair with deck/landing in (e) envelope/footprint.Details
re-built dry rotted front entry stair with deck/landing in (e) envelope/footprint. | $8,000 |
| Oct 15, 2015 | Completed final sign-off Feb 2016 | 448 Gold Mine Dr | termite repair: all deck & install drainage to let water drainage,replace all termite work, not visible to the street bet detached garage & front door of the house, less than 50%Details
termite repair: all deck & install drainage to let water drainage,replace all termite work, not visible to the street bet detached garage & front door of the house, less than 50% | $5,000 |
| Apr 29, 2005 | Completed final sign-off Aug 2005 | 474 Monterey Bl | replace front door,new stucco for whole front,repair deck on 2 & 3 floor.less than 50% of structuralDetails
replace front door,new stucco for whole front,repair deck on 2 & 3 floor.less than 50% of structural | $15,000 |