Back to bathroom remodel contractors
West Coast Property Mgnt Co
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Sep 2026
- Last 24 months
- 3 permits filed
198 permits since 2000: 164 completed, 2 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
60 bathroom remodel permits: 52 completed, 1 in progress, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 101 Frederick St | apt# 1: 1)kitchen remodeling: new cabinets, counter top and flooring. no structual or removal of wall. 2)bath remodel: replace cast iron tub, vanity, toilet. new wall and floor tiles. no structural work of removal of wall.Details
apt# 1: 1)kitchen remodeling: new cabinets, counter top and flooring. no structual or removal of wall. 2)bath remodel: replace cast iron tub, vanity, toilet. new wall and floor tiles. no structural work of removal of wall. | $62,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 1328 Hyde St | unit #4: kitchen remodel - new cabinets, appliances, flooring, and countertop. bath remodel - remove/replace claw foot tub, vanity sink and cainet. no structural, no removal of work.Details
unit #4: kitchen remodel - new cabinets, appliances, flooring, and countertop. bath remodel - remove/replace claw foot tub, vanity sink and cainet. no structural, no removal of work. | $69,000 |
| Mar 11, 2024 | Completed final sign-off Jul 2025 | 2525 Fillmore St | unit 6: kitchen remodel: new cabinets, countertop, flooring & appliances. approx. 64 sq ft. bath remodel: new tub, vanity, toilet. approx 40 sq ft. both remodels in-kind. no moving walls. all sheet rock installed to be 5/8" type x.Details
unit 6: kitchen remodel: new cabinets, countertop, flooring & appliances. approx. 64 sq ft. bath remodel: new tub, vanity, toilet. approx 40 sq ft. both remodels in-kind. no moving walls. all sheet rock installed to be 5/8" type x. | $60,000 |
| Jan 8, 2024 | Completed final sign-off Feb 2025 | 2905 Van Ness Av | #406: kitchen remodel- new cabinets, countertop, appliances and floor tiles. bathroom remodel: remove/replace bath tub, shower fixtures, vanity and toilet closet bowl. no structural or removal of walls.Details
#406: kitchen remodel- new cabinets, countertop, appliances and floor tiles. bathroom remodel: remove/replace bath tub, shower fixtures, vanity and toilet closet bowl. no structural or removal of walls. | $54,000 |
| Apr 22, 2022 | Completed final sign-off Mar 2023 | 2140 Vallejo St | apt #8. kitchen & bath remodel. new cabinets, counter top in kind. add new electrical panel in unit. no structural & no removal of walls. bath: remove / replace cabinets, countertop, vanity, tub, toilet in kind.Details
apt #8. kitchen & bath remodel. new cabinets, counter top in kind. add new electrical panel in unit. no structural & no removal of walls. bath: remove / replace cabinets, countertop, vanity, tub, toilet in kind. | $40,000 |
| Jun 11, 2020 | Expired or cancelled expired Oct 2023 | 2140 Vallejo St | apt #7: kitchen remodeling: new cabinets, countertop, appliance and floor tiles. bathroom remodeling: remove and replace tub, toilet closet bowl, vanity cabinet and floor tiles. no structural work and all work in kind.Details
apt #7: kitchen remodeling: new cabinets, countertop, appliance and floor tiles. bathroom remodeling: remove and replace tub, toilet closet bowl, vanity cabinet and floor tiles. no structural work and all work in kind. | $37,000 |
| Jun 10, 2020 | Never finaled issued Jun 2020, no final | 2905 Van Ness Av | unit 101: remodel kitchen - new cabinets, countertop, appliance, and floor tiles. remodel bathroom - remove and replace bath tub, shower fixture, vanity sink, and toilet closet bowl. no structural work and no removal of wall.Details
unit 101: remodel kitchen - new cabinets, countertop, appliance, and floor tiles. remodel bathroom - remove and replace bath tub, shower fixture, vanity sink, and toilet closet bowl. no structural work and no removal of wall. | $34,000 |
| Jun 10, 2020 | Completed final sign-off Dec 2021 | 332 Presidio Av | apt 6: kitchen remodeling: new cabinets, countertop, appliance and floor tiles. bathroom: remove and replace fiberglass shower pan, vanity cabinet, toilet closet bowl. no structural work. all in kind.Details
apt 6: kitchen remodeling: new cabinets, countertop, appliance and floor tiles. bathroom: remove and replace fiberglass shower pan, vanity cabinet, toilet closet bowl. no structural work. all in kind. | $32,000 |
| Feb 10, 2020 | Completed final sign-off Dec 2021 | 332 Presidio Av | apt 3: remodel kitchen: new countetop, caibnets & appliances. bathroom remodeling: remove & replace shower fiberglass pan, vanity & tiolet. no structurual work.Details
apt 3: remodel kitchen: new countetop, caibnets & appliances. bathroom remodeling: remove & replace shower fiberglass pan, vanity & tiolet. no structurual work. | $32,000 |
| Dec 3, 2019 | Completed final sign-off Jan 2021 | 332 Presidio Av | apt 9: remodeling ktichen & bathroom. no cabinets, counterop, tub, vanity & to89ilet. no structural work.Details
apt 9: remodeling ktichen & bathroom. no cabinets, counterop, tub, vanity & to89ilet. no structural work. | $32,000 |
| Aug 13, 2019 | Completed final sign-off Jun 2020 | 1130 Larkin St | apt# 27; kitchen remodeling: new cabinets, countertop & appliance, bath room remodel: remove & replace tub, vanity cabinet and toilet (no structural work)Details
apt# 27; kitchen remodeling: new cabinets, countertop & appliance, bath room remodel: remove & replace tub, vanity cabinet and toilet (no structural work) | $32,500 |
| Apr 19, 2019 | Completed final sign-off Aug 2020 | 1040 Mason St | apt 301: kitchen and bath remodel 10 x 7 kitchen, no structural, no removal of walls 5x7 bathDetails
apt 301: kitchen and bath remodel 10 x 7 kitchen, no structural, no removal of walls 5x7 bath | $32,000 |
| Jan 9, 2019 | Completed final sign-off Dec 2019 | 830 Hayes St | apt 208: kitchen remodeling: remove/replace kitchen cabinets, countertops, flooring and appliance: new floor tiles. bath remodel: remove/replace tub, vanity sink, toilet. remove and replace shower fixture. * no structural work or removal of wall.Details
apt 208: kitchen remodeling: remove/replace kitchen cabinets, countertops, flooring and appliance: new floor tiles. bath remodel: remove/replace tub, vanity sink, toilet. remove and replace shower fixture. * no structural work or removal of wall. | $32,000 |
| Oct 17, 2018 | Completed final sign-off May 2019 | 1130 Larkin St | unit 41 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no structural work. bath remodeling - remove and replace tub, shower fixture vanity cabinet. no change on (e) floor planDetails
unit 41 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no structural work. bath remodeling - remove and replace tub, shower fixture vanity cabinet. no change on (e) floor plan | $33,000 |
| Aug 14, 2018 | Completed final sign-off Mar 2019 | 2514 Octavia St | kitchen remodel: new cabinets, coutnertop, flooring & appliances; bathroom remodel: remove/replace tub, vanity, flooring & shower wall tiles; no walls moved/removed/added/modified, all (e) layouts to remain unchanged.Details
kitchen remodel: new cabinets, coutnertop, flooring & appliances; bathroom remodel: remove/replace tub, vanity, flooring & shower wall tiles; no walls moved/removed/added/modified, all (e) layouts to remain unchanged. | $30,000 |
| May 11, 2018 | Never finaled issued May 2018, no final | 2905 Van Ness Av | unit 606: kitchen remodeling: new cabinets, countertop, flooring. bath remodeling: remove and replace tub, vanity, wall and floor tile. no structural work or removal of wallDetails
unit 606: kitchen remodeling: new cabinets, countertop, flooring. bath remodeling: remove and replace tub, vanity, wall and floor tile. no structural work or removal of wall | $27,200 |
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 1130 Larkin St | apt 28 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no strutural work. bath remodl - remove & replace tub, shower fixture, vanity & flooringDetails
apt 28 - kitchen remodeling - new cabinets, countertop, flooring and appliance. no strutural work. bath remodl - remove & replace tub, shower fixture, vanity & flooring | $33,000 |
| Aug 29, 2017 | Completed final sign-off Mar 2018 | 700 O'farrell St | apt. #108: kitchen remodeling, new cabinet, countertop, flooring and appliance. no structural work or removal of wall. bath remodeling: replace tub, toilet, vanity and shower fixtureDetails
apt. #108: kitchen remodeling, new cabinet, countertop, flooring and appliance. no structural work or removal of wall. bath remodeling: replace tub, toilet, vanity and shower fixture | $28,000 |
| Jul 21, 2017 | Completed final sign-off Apr 2018 | 101 Frederick St | unit 2: kitchen remodel, new cabinet, countertop, flooring & appliances; bath remodel, new tub, shower pan, flooring, vanity or pedestal sink. no structural work.Details
unit 2: kitchen remodel, new cabinet, countertop, flooring & appliances; bath remodel, new tub, shower pan, flooring, vanity or pedestal sink. no structural work. | $32,000 |
| Jun 16, 2017 | Completed final sign-off Aug 2017 | 76 Toledo Wy | bathroom remodel. no removal of wall or structural workDetails
bathroom remodel. no removal of wall or structural work | $13,000 |
| May 16, 2017 | Completed final sign-off Feb 2018 | 1040 Mason St | #201- kitchen and bath remodeling, no structural work.Details
#201- kitchen and bath remodeling, no structural work. | $30,000 |
| May 16, 2017 | Completed final sign-off Feb 2018 | 1040 Mason St | #404- kitchen and bath remodeling, no structural work.Details
#404- kitchen and bath remodeling, no structural work. | $30,000 |
| Feb 10, 2017 | Completed final sign-off Aug 2017 | 2905 Van Ness Av | unit #601 no walls moved, removed or added. all layout to remain unchanged. kitchen remodel, new cabinets, countertop, flooring & appliances. bathroom remodel, remove & replace bathtub, toilet, pedestal sink, wall & floor tiles. no structural work.Details
unit #601 no walls moved, removed or added. all layout to remain unchanged. kitchen remodel, new cabinets, countertop, flooring & appliances. bathroom remodel, remove & replace bathtub, toilet, pedestal sink, wall & floor tiles. no structural work. | $27,200 |
| Oct 21, 2016 | Completed final sign-off Mar 2017 | 1326 Hyde St | unit 1: kitchen remodel - new cabinets, countertop, flooring & appliance; bath remodel - remove/replace tub, vanity cabinet, wall & floor tiles; no structural work or removal of wall.Details
unit 1: kitchen remodel - new cabinets, countertop, flooring & appliance; bath remodel - remove/replace tub, vanity cabinet, wall & floor tiles; no structural work or removal of wall. | $30,000 |
| Jul 5, 2016 | Completed final sign-off Nov 2016 | 975 Burnett Av | apt #18. kitchen remodeling: new cabinets, counter tops, flooring & appliances. bathroom remodeling: replace tub, vanity, toilet, wall & floor tiles & no structural or removal of wallsDetails
apt #18. kitchen remodeling: new cabinets, counter tops, flooring & appliances. bathroom remodeling: replace tub, vanity, toilet, wall & floor tiles & no structural or removal of walls | $27,500 |
| Jun 16, 2016 | Completed final sign-off Oct 2016 | 1328 Hyde St | unti #3: kitchen remodeling: new cabinets, counter top, flooring & appliances. bathroom remodeling: remove and replace tub, vanity cabinets, wall and floor tiles. no structural work or removal of walls.Details
unti #3: kitchen remodeling: new cabinets, counter top, flooring & appliances. bathroom remodeling: remove and replace tub, vanity cabinets, wall and floor tiles. no structural work or removal of walls. | $30,000 |
| Apr 11, 2016 | Completed final sign-off Sep 2016 | 2140 Vallejo St | kitchen and bathroom remodel in unit #5:(n)cabinets,countertop,sink, flooring & appliances in kitchen; remove & replace tub,shower faucet, toilet,vanity & tiles in bathroom. no (n)wall & no (e)wall relocation. lighting shall comply with cec 150.0(k)3 & 5 resp. all new sheet rock shall be 5/8" type xDetails
kitchen and bathroom remodel in unit #5:(n)cabinets,countertop,sink, flooring & appliances in kitchen; remove & replace tub,shower faucet, toilet,vanity & tiles in bathroom. no (n)wall & no (e)wall relocation. lighting shall comply with cec 150.0(k)3 & 5 resp. all new sheet rock shall be 5/8" type x | $30,000 |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 1755 Van Ness Av | apt 301: kitchen remodel. new cabinet, counter, floor, appliance. bath remodel. remove and replace bath tub, pedestal sink, new wall, floor tiles, no removal of wall window door, no structuralDetails
apt 301: kitchen remodel. new cabinet, counter, floor, appliance. bath remodel. remove and replace bath tub, pedestal sink, new wall, floor tiles, no removal of wall window door, no structural | $25,000 |
| Oct 16, 2015 | Completed final sign-off Jan 2017 | 332 Presidio Av | #2 - kitchen remodeling: new cabinet, countertop, flooring & appliances. bath remodeling: replace toilet, vanity sink, claw foot tub. no structural work. all work in-kind.Details
#2 - kitchen remodeling: new cabinet, countertop, flooring & appliances. bath remodeling: replace toilet, vanity sink, claw foot tub. no structural work. all work in-kind. | $25,000 |
| Sep 30, 2015 | Completed final sign-off Feb 2016 | 1948 Mcallister St | unit #4: kitchen remodeling - new cabinet, countertop, floor and appliances. bath remodeling: remove and replace bath tubs, vanity cabinet and toilet. no structural work or removal of wallDetails
unit #4: kitchen remodeling - new cabinet, countertop, floor and appliances. bath remodeling: remove and replace bath tubs, vanity cabinet and toilet. no structural work or removal of wall | $30,650 |
| Aug 14, 2015 | Completed final sign-off Mar 2016 | 807 Ulloa St | work in unit #1: kitchen remodeling: new cabinets, counter flooring and appliances, bath remodeling: remove and replace tub, vanity, sink, toilet and shower fixture. new floor tile. no removal of walls or structure work.Details
work in unit #1: kitchen remodeling: new cabinets, counter flooring and appliances, bath remodeling: remove and replace tub, vanity, sink, toilet and shower fixture. new floor tile. no removal of walls or structure work. | $25,000 |
| Jun 10, 2015 | Completed final sign-off Aug 2015 | 1948 Mcallister St | #3:kitchen remodeling: new cabinet, countertop, flooring and appliances. no structural work. bathroom remodeling: remove and replace tub, toilet, sink, vanity light, wall, and flooring. no structural work. no walls moved, removed or added. all layout to remain the same.Details
#3:kitchen remodeling: new cabinet, countertop, flooring and appliances. no structural work. bathroom remodeling: remove and replace tub, toilet, sink, vanity light, wall, and flooring. no structural work. no walls moved, removed or added. all layout to remain the same. | $25,000 |
| Jun 10, 2015 | Completed final sign-off Nov 2015 | 2905 Van Ness Av | #501:kitchen remodeling: new cabinet, countertop, flooring, and appliances. no structural work. bath remodeling: remove/replace bath tub, toilet, pedastal, vanity light, medicine cabinet, wall and flooring tiles. no structural work. no walls moved, removed or added. all layout o remain unchanged.Details
#501:kitchen remodeling: new cabinet, countertop, flooring, and appliances. no structural work. bath remodeling: remove/replace bath tub, toilet, pedastal, vanity light, medicine cabinet, wall and flooring tiles. no structural work. no walls moved, removed or added. all layout o remain unchanged. | $27,200 |
| Feb 5, 2015 | Completed final sign-off Jun 2015 | 200 Van Ness Av | unit #206. bathroom: remove & replace wood decay floor joist & underlayment. new floor tiles. (5'x5' area only). n/a for maher.Details
unit #206. bathroom: remove & replace wood decay floor joist & underlayment. new floor tiles. (5'x5' area only). n/a for maher. | $3,500 |
| Jan 23, 2015 | Expired or cancelled expired Aug 2019 | 200 Van Ness Av | #306: bathroom: remove & replace wood decay underlayment & floor joist w/the same elcDetails
#306: bathroom: remove & replace wood decay underlayment & floor joist w/the same elc | $2,000 |
| Dec 30, 2014 | Completed final sign-off Mar 2015 | 2601 Greenwich St | unit 9: kitchen remodel: new cabinets, countertop, floor tile & appliances, new led or flourescent ceiling light fixture. no removal of wall or structural work. bath remodel: new shower fixture, toilet, pedestal sink.Details
unit 9: kitchen remodel: new cabinets, countertop, floor tile & appliances, new led or flourescent ceiling light fixture. no removal of wall or structural work. bath remodel: new shower fixture, toilet, pedestal sink. | $25,000 |
| Dec 10, 2014 | Completed final sign-off Jun 2016 | 4015 18th St | kitchen remodeling, new kitchen cabinets, coutner top, flooring & appliance. install new led recesed lighting (6), bath remodeling, remove/replace bath tub, vanity & toilet. install new shower fixture w/pressure balance valve.Details
kitchen remodeling, new kitchen cabinets, coutner top, flooring & appliance. install new led recesed lighting (6), bath remodeling, remove/replace bath tub, vanity & toilet. install new shower fixture w/pressure balance valve. | $35,000 |
| Sep 23, 2014 | Completed final sign-off Feb 2015 | 332 Presidio Av | #8 - kitchen remodeling: new cabinets, countertop, flooring & appliances. install new fluorescent light fixture to comply/wcec 150fk. bath remodeling: remove & replace toilet, pedestal sink & claw foot tub. no structural work, existing drain & water will remain.Details
#8 - kitchen remodeling: new cabinets, countertop, flooring & appliances. install new fluorescent light fixture to comply/wcec 150fk. bath remodeling: remove & replace toilet, pedestal sink & claw foot tub. no structural work, existing drain & water will remain. | $25,000 |
| Jan 3, 2014 | Completed final sign-off Jul 2014 | 1755 Van Ness Av | #201- kitchen remodeling: new cabinet, appliances, counter top, flooring, install fluorescent light fixtures w/high efficacy. bath remodel: remove & replace tub, pedestal sink & toilet, new shower valve & flooring. all existing water & drain lines will remain, install light fixture w/high efficacy.Details
#201- kitchen remodeling: new cabinet, appliances, counter top, flooring, install fluorescent light fixtures w/high efficacy. bath remodel: remove & replace tub, pedestal sink & toilet, new shower valve & flooring. all existing water & drain lines will remain, install light fixture w/high efficacy. | $25,000 |
| Nov 15, 2013 | Completed final sign-off May 2014 | 2525 Fillmore St | #5: kitchen remodeling: new cabinet, counter top, floor tiles & appliances. install new flourescent light fixture. (no structural work) 55sf; bath remodeling: remove and replace claw foot tub, shower fixture. 48sf vanity cabinet, wall and floor tiles. install flourescent light fixtureDetails
#5: kitchen remodeling: new cabinet, counter top, floor tiles & appliances. install new flourescent light fixture. (no structural work) 55sf; bath remodeling: remove and replace claw foot tub, shower fixture. 48sf vanity cabinet, wall and floor tiles. install flourescent light fixture | $26,000 |
| Nov 15, 2013 | Expired or cancelled expired Jun 2023 | 2 Gaviota Wy | renovate gr floor to include 2 bedrooms, family room, full bath, and 1/2 bathDetails
renovate gr floor to include 2 bedrooms, family room, full bath, and 1/2 bath | $25,000 |
| Aug 7, 2013 | Completed final sign-off Jan 2014 | 1755 Van Ness Av | kitchen remodel: new cabinet, appliances, counter top, flooring & fixtures. install flourescent light fixtures in kind. bath remodeling: rmeove and replace tub, pedestal sink and toilet. new shower valve & flooring. all eixting water and drain lines will remain. no structural work.Details
kitchen remodel: new cabinet, appliances, counter top, flooring & fixtures. install flourescent light fixtures in kind. bath remodeling: rmeove and replace tub, pedestal sink and toilet. new shower valve & flooring. all eixting water and drain lines will remain. no structural work. | $25,000 |
| Jul 24, 2013 | Completed final sign-off Aug 2014 | 149 Magellan Av | bathroom remodeling: remove & replace shower fixture, tub, toilet closet bowl, vanity sink & cabinet and exhaust fan with fluorescent light fixture, no structural work in kind fixturesDetails
bathroom remodeling: remove & replace shower fixture, tub, toilet closet bowl, vanity sink & cabinet and exhaust fan with fluorescent light fixture, no structural work in kind fixtures | $15,000 |
| May 8, 2013 | Completed final sign-off Jun 2013 | 2905 Van Ness Av | unit #104: kitchen remodeling: new cabinet, counter top, flooring, appliances, bath remodeling: remove & repl tub, shower fixture, toilet & pedestal sink, install fluorescent light fixtures, no structural work #104Details
unit #104: kitchen remodeling: new cabinet, counter top, flooring, appliances, bath remodeling: remove & repl tub, shower fixture, toilet & pedestal sink, install fluorescent light fixtures, no structural work #104 | $25,000 |
| May 8, 2013 | Completed final sign-off Jul 2013 | 706 Jackson St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 2nd & 3rd flrs. install common hall bathroom & shower rooms grab bars, bathrooms in 301,302,304,306,307,318,319,320,322,324,325Details
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 2nd & 3rd flrs. install common hall bathroom & shower rooms grab bars, bathrooms in 301,302,304,306,307,318,319,320,322,324,325 | $5,000 |
| Apr 22, 2013 | Expired or cancelled cancelled Jul 2013 | 2905 Van Ness Av | kitchen remodeling: new cabinet, flooring, counter top and appliances. install new flourescent light fixture to comply with title24. bath remodeling: r/r shower fixtures, vanity sink, toilet closet bowl, new shower wall tiles, new flourescent light fixture to cmply with title 24. no structuralDetails
kitchen remodeling: new cabinet, flooring, counter top and appliances. install new flourescent light fixture to comply with title24. bath remodeling: r/r shower fixtures, vanity sink, toilet closet bowl, new shower wall tiles, new flourescent light fixture to cmply with title 24. no structural | $5,000 |
| Feb 5, 2013 | Completed final sign-off Jun 2013 | 2350 California St | work in unit #4: kitchen remodel includes new cabinets, counter, flooring, sink &. d bathroom remodel includes new tub surround with wall tiles, shower fixtures, toilet & vanity. no new wall and no wall relocation. lighting for kitchen & bathroom remodel shall comply with cec 150(k)8 & cec 150(k)10.Details
work in unit #4: kitchen remodel includes new cabinets, counter, flooring, sink &. d bathroom remodel includes new tub surround with wall tiles, shower fixtures, toilet & vanity. no new wall and no wall relocation. lighting for kitchen & bathroom remodel shall comply with cec 150(k)8 & cec 150(k)10. | $20,000 |
| Feb 5, 2013 | Completed final sign-off Jul 2013 | 807 Ulloa St | work in unit #3: kitchen remodel includes new cabinet, counter , flooring, sink & appliances. bathroom remodel includes new tub surround with wall tiles, shower fixtures, toilet & vanity. no new wall & no wall relocation. lighting shall comply with cec 150(k)8 & cec 150(k)10.Details
work in unit #3: kitchen remodel includes new cabinet, counter , flooring, sink & appliances. bathroom remodel includes new tub surround with wall tiles, shower fixtures, toilet & vanity. no new wall & no wall relocation. lighting shall comply with cec 150(k)8 & cec 150(k)10. | $20,000 |
| Jul 24, 2012 | Completed final sign-off Oct 2012 | 528 Ashbury St | #1 - remodel kitchen: new cabinets,coutner & appliance,install new flourescent light to comply w/t-24 cec 150(k)8, relocate gas line, (e) water,drain line will remain, remodel bath: new shower valve fixture, new toilet, new vanity, new shower wall,tub liner, no struct work, flour light cec 150(k)10.Details
#1 - remodel kitchen: new cabinets,coutner & appliance,install new flourescent light to comply w/t-24 cec 150(k)8, relocate gas line, (e) water,drain line will remain, remodel bath: new shower valve fixture, new toilet, new vanity, new shower wall,tub liner, no struct work, flour light cec 150(k)10. | $15,000 |
| Aug 11, 2011 | Completed final sign-off Jan 2012 | 332 Presidio Av | unit #1: kitchen remodeling: new cabinet, countertop, new sink and dishwasher. install new ceiling flourescent light fixture to comply with title 24. no structural work. lighting to comply with cec 150(k). bath remodeling: (1) new tub, toilet, vanity sink. new tub surround wall tilesDetails
unit #1: kitchen remodeling: new cabinet, countertop, new sink and dishwasher. install new ceiling flourescent light fixture to comply with title 24. no structural work. lighting to comply with cec 150(k). bath remodeling: (1) new tub, toilet, vanity sink. new tub surround wall tiles | $25,000 |
| May 9, 2011 | Completed final sign-off Aug 2011 | 1674 28th Av | bath remodeling-2nd floor: new bath tub, new vanity cabinet & sink, new tub surround.new floor tiles. install flourescent ceiling light fixture with flourescent. replace window with vinyl single hung window (not facing street) in lightwell area. comply with cec 150 (k).Details
bath remodeling-2nd floor: new bath tub, new vanity cabinet & sink, new tub surround.new floor tiles. install flourescent ceiling light fixture with flourescent. replace window with vinyl single hung window (not facing street) in lightwell area. comply with cec 150 (k). | $10,000 |
| Nov 18, 2010 | Completed final sign-off Aug 2011 | 55 West Portal Av | kitchen remodeling, new kitchen cabinet, counter, floor tiles, appliances, new water heater, install fluorescent light fixtures, to comply w/ title 24. bath remodel new tub, toilet, vanity, install fluorescent light fixture, to comply w/ title 24. new floor tiles.Details
kitchen remodeling, new kitchen cabinet, counter, floor tiles, appliances, new water heater, install fluorescent light fixtures, to comply w/ title 24. bath remodel new tub, toilet, vanity, install fluorescent light fixture, to comply w/ title 24. new floor tiles. | $30,000 |
| Feb 12, 2009 | Completed final sign-off May 2009 | 2514 Octavia St | unit 3 - kitchen remodel r/r kitchen cabinets, counter top, dishwasher, garage disposer & flooring, new fluorescent light fixture. bath remodel-r/r bathtub, toilet closet bowl, vanity flooring. all water & drain lines will remain on same location. no structural work.Details
unit 3 - kitchen remodel r/r kitchen cabinets, counter top, dishwasher, garage disposer & flooring, new fluorescent light fixture. bath remodel-r/r bathtub, toilet closet bowl, vanity flooring. all water & drain lines will remain on same location. no structural work. | $18,000 |
| Sep 20, 2007 | Completed final sign-off Dec 2007 | 1139 Guerrero St | to complaince n.o.v#200713630 . item 6 & 12: 1139 & 1139a -relocation bathroom light switch. item 9: r/r kitchen sink & countertop.Details
to complaince n.o.v#200713630 . item 6 & 12: 1139 & 1139a -relocation bathroom light switch. item 9: r/r kitchen sink & countertop. | $1,000 |
| Mar 15, 2007 | Completed final sign-off Apr 2007 | 289 Downey St | to comply w/nov#200794853. item3: repair bathroom floor.item 5: repair damaged ceiling & walls. item 6: paint ceiling & walls.Details
to comply w/nov#200794853. item3: repair bathroom floor.item 5: repair damaged ceiling & walls. item 6: paint ceiling & walls. | $5,000 |
| Feb 10, 2006 | Completed final sign-off Mar 2006 | 15 Stone St | n.o.v#200563973 compliance item 8: to remove bathroom in basement. to correct installation of water heater exhaust fance.Details
n.o.v#200563973 compliance item 8: to remove bathroom in basement. to correct installation of water heater exhaust fance. | $6,000 |
| Aug 16, 2005 | Completed final sign-off Jul 2006 | 1271 Union St | kitchen remodel - new cabinets, new flooring, new computer, bathroom remodeling- new shower, vanity,Details
kitchen remodel - new cabinets, new flooring, new computer, bathroom remodeling- new shower, vanity, | $40,000 |
| Jun 13, 2005 | Completed final sign-off Aug 2005 | 3175 24th St | replace kitchen cabinets, replace stainles sink, replace shower valve fixture in bathroom.Details
replace kitchen cabinets, replace stainles sink, replace shower valve fixture in bathroom. | $5,000 |
| Dec 6, 2004 | Completed final sign-off Jun 2005 | 946 Stockton St | hall bath remodel, new tub, shower fix, vanity,toilet,closet bowl. master bath remodel,new shower paDetails
hall bath remodel, new tub, shower fix, vanity,toilet,closet bowl. master bath remodel,new shower pa | $20,000 |
| Oct 18, 2004 | Completed final sign-off Oct 2005 | 1654 31st Av | alteration to existing 1/f residential.to construct 1bedroom,1 family room,1 full bathDetails
alteration to existing 1/f residential.to construct 1bedroom,1 family room,1 full bath | $33,400 |