Wei's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to May 2025
- Last 24 months
- 1 permit filed
42 permits since 2000: 41 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 22 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2020 | Completed final sign-off Apr 2021 | 23 Skyview Wy | new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd flDetails
new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd fl | $93,500 |
| Dec 23, 2019 | Completed final sign-off Sep 2020 | 1495 39th Av | interior remodel to develop unconditioned square footage on 1st level adding 1 bedroom, 1 bath, living space and office. remodel of (e) interior stair connecting levels and bathroom on 2nd level. replace (e) windows.Details
interior remodel to develop unconditioned square footage on 1st level adding 1 bedroom, 1 bath, living space and office. remodel of (e) interior stair connecting levels and bathroom on 2nd level. replace (e) windows. | $250,000 |
| Jan 14, 2015 | Completed final sign-off Dec 2015 | 26 Maddux Av | remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room.Details
remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room. | $100,000 |
| Jun 9, 2014 | Completed final sign-off Jul 2014 | 86 Florentine Av | minor repair at front stair.Details
minor repair at front stair. | $500 |
| Jun 15, 2012 | Completed final sign-off Aug 2012 | 478 Hazelwood Av | repair front stair & stucco.Details
repair front stair & stucco. | $5,000 |
| Sep 23, 2008 | Completed final sign-off Jul 2009 | 1458 Silver Av | attic area-new bathrm & 3 skylights. 2nd fl-relocate (e) kitchen, bathrm, convert laundry to new family rm, convert (e) dining rm to new kitchen, convert (e) family rm to new bedrm. 1st fl-remodeling new game rm, reduce size of (e) office to provide an access to street and a new rear exit stairDetails
attic area-new bathrm & 3 skylights. 2nd fl-relocate (e) kitchen, bathrm, convert laundry to new family rm, convert (e) dining rm to new kitchen, convert (e) family rm to new bedrm. 1st fl-remodeling new game rm, reduce size of (e) office to provide an access to street and a new rear exit stair | $70,000 |