Back to bathroom remodel contractors
Wei's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to May 2025
- Last 24 months
- 1 permit filed
42 permits since 2000: 41 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 20 completed. Typically 5 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2024 | Completed final sign-off Oct 2024 | 2266 35th Av | 1/f: replace federal pacific main panel & install new ceiling mounted furnace & tankless water heater in garage. 2/f: replace all windows & skylights, convert a 4-fixture bath into a 3-fixture bath & powder room and remodel kitchen. no structural alteration under this permit.Details
1/f: replace federal pacific main panel & install new ceiling mounted furnace & tankless water heater in garage. 2/f: replace all windows & skylights, convert a 4-fixture bath into a 3-fixture bath & powder room and remodel kitchen. no structural alteration under this permit. | $70,000 |
| Sep 22, 2022 | Completed final sign-off Dec 2022 | 1177 California St | remodeling one bathroom. non structural.Details
remodeling one bathroom. non structural. | $5,000 |
| Jun 21, 2022 | Completed final sign-off Aug 2022 | 3026 Octavia St | remodel bathroom in the hallwayDetails
remodel bathroom in the hallway | $10,000 |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 1987 California St | unit #102: bathroom remodel - replace toilet, bathtub, and vanity. retile bathroom & walls . replace fixtures.Details
unit #102: bathroom remodel - replace toilet, bathtub, and vanity. retile bathroom & walls . replace fixtures. | $15,000 |
| Dec 24, 2021 | Completed final sign-off Mar 2022 | 2386 15th St | to comply with violation 202183972. convert legal half bath on ground floor to full bath.Details
to comply with violation 202183972. convert legal half bath on ground floor to full bath. | $5,200 |
| Jan 21, 2020 | Completed final sign-off Apr 2021 | 23 Skyview Wy | new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd flDetails
new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd fl | $93,500 |
| Dec 23, 2019 | Completed final sign-off Sep 2020 | 1495 39th Av | interior remodel to develop unconditioned square footage on 1st level adding 1 bedroom, 1 bath, living space and office. remodel of (e) interior stair connecting levels and bathroom on 2nd level. replace (e) windows.Details
interior remodel to develop unconditioned square footage on 1st level adding 1 bedroom, 1 bath, living space and office. remodel of (e) interior stair connecting levels and bathroom on 2nd level. replace (e) windows. | $250,000 |
| Apr 30, 2019 | Completed final sign-off Nov 2019 | 1446 Moraga St | remodel of kitchen (wall removed & open kitchen); addition of bathroom (lower level) & add mudroom. renovate existing bathrooms. update windowsDetails
remodel of kitchen (wall removed & open kitchen); addition of bathroom (lower level) & add mudroom. renovate existing bathrooms. update windows | $150,000 |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 838 Anza St | remodel bathroom in unit 103 .Details
remodel bathroom in unit 103 . | $10,000 |
| Jan 3, 2018 | Completed final sign-off Mar 2018 | 467 Gold Mine Dr | remodel bathroom on 3rd floorDetails
remodel bathroom on 3rd floor | $6,000 |
| Jul 12, 2017 | Completed final sign-off Jul 2018 | 1991 California St | #111 & #112- interior remodel living space includes bedrooms, bathrooms, kitchens, living & dining rooms. add new laundry area in 2 units. n/a maherDetails
#111 & #112- interior remodel living space includes bedrooms, bathrooms, kitchens, living & dining rooms. add new laundry area in 2 units. n/a maher | $20,000 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 138 Clearfield Dr | kitchen and bath remodel. add new gas fireplace. remove non bearing wall, replace kitchen cabinets, new island and flooring. master bath remodel, common bath remodel, replace existing rear windows on upper floor. whole house electrical upgrade.Details
kitchen and bath remodel. add new gas fireplace. remove non bearing wall, replace kitchen cabinets, new island and flooring. master bath remodel, common bath remodel, replace existing rear windows on upper floor. whole house electrical upgrade. | $35,000 |
| Sep 1, 2016 | Completed final sign-off Nov 2016 | 474 Princeton St | add a play room family room, an office and a full bath on 1st floor.Details
add a play room family room, an office and a full bath on 1st floor. | $50,000 |
| Jan 14, 2015 | Completed final sign-off Dec 2015 | 26 Maddux Av | remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room.Details
remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room. | $100,000 |
| Mar 24, 2014 | Completed final sign-off May 2014 | 155 Hancock St | retile bathroom at unit 5.Details
retile bathroom at unit 5. | $2,500 |
| Mar 8, 2013 | Completed final sign-off Apr 2013 | 608 Missouri St | convert powder room to full bath on 2nd fl. relocate laundry room.Details
convert powder room to full bath on 2nd fl. relocate laundry room. | $20,000 |
| May 17, 2010 | Completed final sign-off Dec 2010 | 735 Cambridge St | revision to appl. #201004140229; relocate (e) full bathroom & laundry on (e) ground flr. per plan. enlarge (e) garage depth.Details
revision to appl. #201004140229; relocate (e) full bathroom & laundry on (e) ground flr. per plan. enlarge (e) garage depth. | |
| Apr 14, 2010 | Completed final sign-off Dec 2010 | 735 Cambridge St | to add one bedroom, one play room, one full bath room, one laundry room & one storage on the existing ground floor.Details
to add one bedroom, one play room, one full bath room, one laundry room & one storage on the existing ground floor. | $38,000 |
| Aug 15, 2007 | Completed final sign-off Jan 2010 | 1630 Sloat Bl | vertical addition to single family dwelling - (n) master bedroom & two bedroom, master bath & bath.Details
vertical addition to single family dwelling - (n) master bedroom & two bedroom, master bath & bath. | $80,000 |
| Mar 2, 2007 | Completed final sign-off Jun 2007 | 1726 Alemany Bl | 1)construct one story rear deck(9'-6" ht) on ground floor level per plan. 2) to add 2 bed room, one full bath room, one laundry room/storage on extg ground floor per planDetails
1)construct one story rear deck(9'-6" ht) on ground floor level per plan. 2) to add 2 bed room, one full bath room, one laundry room/storage on extg ground floor per plan | $26,000 |