Back to kitchen remodel contractors
Wei's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to May 2025
- Last 24 months
- 1 permit filed
42 permits since 2000: 41 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 12 completed. Typically 10 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2024 | Completed final sign-off Oct 2024 | 2266 35th Av | 1/f: replace federal pacific main panel & install new ceiling mounted furnace & tankless water heater in garage. 2/f: replace all windows & skylights, convert a 4-fixture bath into a 3-fixture bath & powder room and remodel kitchen. no structural alteration under this permit.Details
1/f: replace federal pacific main panel & install new ceiling mounted furnace & tankless water heater in garage. 2/f: replace all windows & skylights, convert a 4-fixture bath into a 3-fixture bath & powder room and remodel kitchen. no structural alteration under this permit. | $70,000 |
| Jan 21, 2020 | Completed final sign-off Apr 2021 | 23 Skyview Wy | new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd flDetails
new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd fl | $93,500 |
| Apr 30, 2019 | Completed final sign-off Nov 2019 | 1446 Moraga St | remodel of kitchen (wall removed & open kitchen); addition of bathroom (lower level) & add mudroom. renovate existing bathrooms. update windowsDetails
remodel of kitchen (wall removed & open kitchen); addition of bathroom (lower level) & add mudroom. renovate existing bathrooms. update windows | $150,000 |
| Jul 12, 2017 | Completed final sign-off Jul 2018 | 1991 California St | #111 & #112- interior remodel living space includes bedrooms, bathrooms, kitchens, living & dining rooms. add new laundry area in 2 units. n/a maherDetails
#111 & #112- interior remodel living space includes bedrooms, bathrooms, kitchens, living & dining rooms. add new laundry area in 2 units. n/a maher | $20,000 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 138 Clearfield Dr | kitchen and bath remodel. add new gas fireplace. remove non bearing wall, replace kitchen cabinets, new island and flooring. master bath remodel, common bath remodel, replace existing rear windows on upper floor. whole house electrical upgrade.Details
kitchen and bath remodel. add new gas fireplace. remove non bearing wall, replace kitchen cabinets, new island and flooring. master bath remodel, common bath remodel, replace existing rear windows on upper floor. whole house electrical upgrade. | $35,000 |
| Dec 2, 2015 | Completed final sign-off Jan 2016 | 1243 16th Av | remodel kitchen on 2nd fl.Details
remodel kitchen on 2nd fl. | $9,000 |
| Jan 14, 2015 | Completed final sign-off Dec 2015 | 26 Maddux Av | remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room.Details
remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room. | $100,000 |
| May 15, 2014 | Completed final sign-off Oct 2014 | 155 Hancock St | unit #5:kitchen remodel with new counter top and cabinets.Details
unit #5:kitchen remodel with new counter top and cabinets. | $8,000 |
| Jan 9, 2013 | Completed final sign-off Feb 2013 | 497 21st Av | remodel kitchen in unit 497 only.Details
remodel kitchen in unit 497 only. | $3,500 |
| Aug 3, 2010 | Completed final sign-off Aug 2010 | 130 23rd Av | #2 - remodel kitchen. no wall changes. replace cabinets, counter top, no new lighting.Details
#2 - remodel kitchen. no wall changes. replace cabinets, counter top, no new lighting. | $1,500 |
| Jul 19, 2010 | Completed final sign-off Aug 2010 | 130 23rd Av | unit #5 & 6. remodel kitchens & laundry in kind. no new lighting. no change to exhaust system.Details
unit #5 & 6. remodel kitchens & laundry in kind. no new lighting. no change to exhaust system. | $3,000 |
| Sep 23, 2008 | Completed final sign-off Jul 2009 | 1458 Silver Av | attic area-new bathrm & 3 skylights. 2nd fl-relocate (e) kitchen, bathrm, convert laundry to new family rm, convert (e) dining rm to new kitchen, convert (e) family rm to new bedrm. 1st fl-remodeling new game rm, reduce size of (e) office to provide an access to street and a new rear exit stairDetails
attic area-new bathrm & 3 skylights. 2nd fl-relocate (e) kitchen, bathrm, convert laundry to new family rm, convert (e) dining rm to new kitchen, convert (e) family rm to new bedrm. 1st fl-remodeling new game rm, reduce size of (e) office to provide an access to street and a new rear exit stair | $70,000 |