Back to kitchen remodel contractors
Walsh Construction
- Based in
- Costa Mesa
- On San Francisco permits
- Jul 2004 to Apr 2014
- Last 24 months
- 0 permits filed
36 permits since 2000: 29 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2014 | Completed final sign-off Nov 2014 | 1160 Mission St | #908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13Details
#908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13 | $55,000 |
| May 27, 2011 | Completed final sign-off Sep 2011 | 930 Noriega St | replace cabinets, electrical & plumbing @ kitchen. add door to kitchen, replace (e) exterior doors & window at lightwell, new window @ lightwell, not visible to street.Details
replace cabinets, electrical & plumbing @ kitchen. add door to kitchen, replace (e) exterior doors & window at lightwell, new window @ lightwell, not visible to street. | $20,000 |
| Dec 10, 2009 | Completed final sign-off Feb 2010 | 146 Sears St | replace tile in shower area & replace floor tile in bathroom only, no other work. replace kitchen cabinets, install (n) counter tops & install (n) flooring, no other work.Details
replace tile in shower area & replace floor tile in bathroom only, no other work. replace kitchen cabinets, install (n) counter tops & install (n) flooring, no other work. | $5,000 |
| Sep 16, 2009 | Completed final sign-off Apr 2010 | 3701 Clement St | remove (e) non-bearing walls and replace with new. replace (e) 3 windows. replace (e) cabinets and appliances with new. new kitchen lighting and new finishes.Details
remove (e) non-bearing walls and replace with new. replace (e) 3 windows. replace (e) cabinets and appliances with new. new kitchen lighting and new finishes. | $50,000 |
| Jul 3, 2008 | Completed final sign-off Nov 2008 | 71 Garcia Av | demolish & remodel kitchen, replace/move 2 windows and 1 door, repair outside wall, rebuild top portion of back stairs, remove non-load wall between dining room and kitchenDetails
demolish & remodel kitchen, replace/move 2 windows and 1 door, repair outside wall, rebuild top portion of back stairs, remove non-load wall between dining room and kitchen | $100,000 |
| Jun 15, 2007 | Completed final sign-off Aug 2007 | 300 Beale St | replace (1) (e) kitchen & bathroom counter tops with new counter tops, sinks and fausets with new sink and fauset replace existing toilets with new toilets replace (e) trach lighting with new trach lighting all in one unit (1) kitchen (2) bath remodel. non structural.Details
replace (1) (e) kitchen & bathroom counter tops with new counter tops, sinks and fausets with new sink and fauset replace existing toilets with new toilets replace (e) trach lighting with new trach lighting all in one unit (1) kitchen (2) bath remodel. non structural. | $13,000 |
| Feb 13, 2006 | Completed final sign-off Jun 2006 | 331 Panorama Dr | remodel kitchen new cabs/new windows at side, new plumbing, electrical.Details
remodel kitchen new cabs/new windows at side, new plumbing, electrical. | $30,000 |
| Jun 21, 2005 | Completed final sign-off Dec 2005 | 1458 24th Av | kitchen and bath remodel, level floors, rebuild (e) deckDetails
kitchen and bath remodel, level floors, rebuild (e) deck | $60,000 |