Walsh Construction
- Based in
- Costa Mesa
- On San Francisco permits
- Jul 2004 to Apr 2014
- Last 24 months
- 0 permits filed
36 permits since 2000: 29 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2009 | Expired or cancelled expired Jun 2010 | 476 Diamond St | refer/revision to pa #200608230294s1 & #200801253306, proposed spiral staircase remove from scope of work and upper deck shortened to line up w/ building.Details
refer/revision to pa #200608230294s1 & #200801253306, proposed spiral staircase remove from scope of work and upper deck shortened to line up w/ building. | |
| Jan 29, 2008 | Completed final sign-off Jun 2009 | 159 Middlefield Dr | horizontal addition of deck on 1st and 2nd level. addition of ground floor habitable space, interior remodeling, replacement of existing window and addition of some new windows. replace ex. roof with new roof.Details
horizontal addition of deck on 1st and 2nd level. addition of ground floor habitable space, interior remodeling, replacement of existing window and addition of some new windows. replace ex. roof with new roof. | $285,000 |
| Jun 21, 2005 | Completed final sign-off Dec 2005 | 1458 24th Av | kitchen and bath remodel, level floors, rebuild (e) deckDetails
kitchen and bath remodel, level floors, rebuild (e) deck | $60,000 |