Back to bathroom remodel contractors
Walsh Construction
- Based in
- Costa Mesa
- On San Francisco permits
- Jul 2004 to Apr 2014
- Last 24 months
- 0 permits filed
36 permits since 2000: 29 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 9 completed. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2014 | Completed final sign-off Nov 2014 | 1160 Mission St | #908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13Details
#908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13 | $55,000 |
| Feb 20, 2014 | Completed final sign-off Mar 2016 | 331 Panorama Dr | convert part of garage into master bath. relocate entry within extg stair enclosure and reconfigure interior stairs. replace footings to extg interior columns. new concrete slab at lower level.Details
convert part of garage into master bath. relocate entry within extg stair enclosure and reconfigure interior stairs. replace footings to extg interior columns. new concrete slab at lower level. | $106,000 |
| Nov 20, 2013 | Completed final sign-off Feb 2014 | 331 Panorama Dr | remodel (e) bathroom- relocate toilet, move (e) non-bearing wall; replace and reconfigure bathroom window not visible from street.Details
remodel (e) bathroom- relocate toilet, move (e) non-bearing wall; replace and reconfigure bathroom window not visible from street. | $20,000 |
| Dec 10, 2009 | Completed final sign-off Feb 2010 | 146 Sears St | replace tile in shower area & replace floor tile in bathroom only, no other work. replace kitchen cabinets, install (n) counter tops & install (n) flooring, no other work.Details
replace tile in shower area & replace floor tile in bathroom only, no other work. replace kitchen cabinets, install (n) counter tops & install (n) flooring, no other work. | $5,000 |
| Jun 10, 2009 | Completed final sign-off Oct 2009 | 15 Gladeview Wy | remodel bathroom on 2nd floor- work includes removal non-bearing wall & const new walls for bathroom. reconfigure closets & opening into existing den.Details
remodel bathroom on 2nd floor- work includes removal non-bearing wall & const new walls for bathroom. reconfigure closets & opening into existing den. | $30,000 |
| Mar 31, 2008 | Completed final sign-off May 2008 | 18 Worth St | remodel existing 1 bathroom. new tub, toilet, sink, new tile,new plumbing fixtures. same location.Details
remodel existing 1 bathroom. new tub, toilet, sink, new tile,new plumbing fixtures. same location. | $23,000 |
| Jun 15, 2007 | Completed final sign-off Aug 2007 | 300 Beale St | replace (1) (e) kitchen & bathroom counter tops with new counter tops, sinks and fausets with new sink and fauset replace existing toilets with new toilets replace (e) trach lighting with new trach lighting all in one unit (1) kitchen (2) bath remodel. non structural.Details
replace (1) (e) kitchen & bathroom counter tops with new counter tops, sinks and fausets with new sink and fauset replace existing toilets with new toilets replace (e) trach lighting with new trach lighting all in one unit (1) kitchen (2) bath remodel. non structural. | $13,000 |
| Oct 7, 2005 | Completed final sign-off Sep 2006 | 301 Folsom St | remodel 2 baths, new tub,sins, shower,plumb fix, cntrtps. new elec, shtrk,painting. no structural work, provide fl lightingDetails
remodel 2 baths, new tub,sins, shower,plumb fix, cntrtps. new elec, shtrk,painting. no structural work, provide fl lighting | $10,000 |
| Jun 21, 2005 | Completed final sign-off Dec 2005 | 1458 24th Av | kitchen and bath remodel, level floors, rebuild (e) deckDetails
kitchen and bath remodel, level floors, rebuild (e) deck | $60,000 |