Wallace Remodeling Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2018
- Last 24 months
- 0 permits filed
285 permits since 2000: 252 completed, 12 never finaled, 21 expired or cancelled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
46 stairs permits: 43 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2016 | Expired or cancelled expired Sep 2019 | 54 Miraloma Dr | convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add windowDetails
convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add window | $50,000 |
| Sep 30, 2016 | Completed final sign-off Nov 2016 | 2 Hugo St | to comply with nov 200339639, 200341822 remove illegal stairs as per notice of violation of 7-1-03 (complaint 20339639)Details
to comply with nov 200339639, 200341822 remove illegal stairs as per notice of violation of 7-1-03 (complaint 20339639) | $500 |
| Jun 22, 2016 | Completed final sign-off Mar 2017 | 1874 10th Av | renovate rooms down. remodel master bathroom, convert office to bedroom. add laundry closet, add integral stair, move cabinet in kitchen on second floor. addition of 280 sf habitable area on ground floor. selective structural strengthening work.Details
renovate rooms down. remodel master bathroom, convert office to bedroom. add laundry closet, add integral stair, move cabinet in kitchen on second floor. addition of 280 sf habitable area on ground floor. selective structural strengthening work. | $75,000 |
| Oct 14, 2015 | Completed final sign-off Jun 2016 | 4626 17th St | add door, landing, and stair to grade at rear less than 30" above grade, replace 5 kitchen cabinets, provide new tankless water heater, provide new lighting.Details
add door, landing, and stair to grade at rear less than 30" above grade, replace 5 kitchen cabinets, provide new tankless water heater, provide new lighting. | $15,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 1230 Mason St | provide exit path from rear stairs to public way. garage to revert to last authorized use for 2 car parking per pa#200807015804. legalization of existing steel beams at the ground floor.Details
provide exit path from rear stairs to public way. garage to revert to last authorized use for 2 car parking per pa#200807015804. legalization of existing steel beams at the ground floor. | $20,000 |
| Jul 10, 2015 | Completed final sign-off Sep 2015 | 43 Prospect Av | remove an existing metal spiral stairway and replace it with a new wood stairDetails
remove an existing metal spiral stairway and replace it with a new wood stair | $15,000 |
| May 26, 2015 | Completed final sign-off Oct 2015 | 1119 Broderick St | remodel kitchen - no walls moving add laundry hook ups in storage area under stairs.Details
remodel kitchen - no walls moving add laundry hook ups in storage area under stairs. | |
| Mar 3, 2015 | Completed final sign-off Sep 2016 | 200 Stillings Av | remodel (e) bedroom and bath, replace (e) stairway with new code compliant and relocate extg laundry, repair dryrot at (e) deck and railing.Details
remodel (e) bedroom and bath, replace (e) stairway with new code compliant and relocate extg laundry, repair dryrot at (e) deck and railing. | $85,000 |
| Oct 24, 2014 | Completed final sign-off Oct 2015 | 1168 Page St | add bedroom in former storage area. remodel bedroom, bathroom, add laundry at 1st fl. remodel kitchen to great room on 2nd fl. rear stairs, doors, windows. no envelope expansion. no work visible from street.Details
add bedroom in former storage area. remodel bedroom, bathroom, add laundry at 1st fl. remodel kitchen to great room on 2nd fl. rear stairs, doors, windows. no envelope expansion. no work visible from street. | $50,000 |
| May 15, 2014 | Completed final sign-off Nov 2014 | 310 Diamond St | replace front stairs in same location/configuration.Details
replace front stairs in same location/configuration. | $10,000 |
| Feb 3, 2014 | Completed final sign-off Feb 2014 | 436 Edinburgh St | replace upper flight only at rear stairs in kind.Details
replace upper flight only at rear stairs in kind. | $3,500 |
| Nov 21, 2013 | Completed final sign-off Jan 2014 | 230 20th Av | rear deck and stairs. french door. 2 replacement windows.Details
rear deck and stairs. french door. 2 replacement windows. | $15,000 |
| Jul 5, 2013 | Completed final sign-off Dec 2013 | 892 Ashbury St | add spiral convenience stair from 1st to basement. remove portion of floor & framing @ first floor dining room; frame new stairwell; add code compliant 5'0" spiral stair for convenience access; replace furnace and water heaters; add furnace at basement dwelling unit.Details
add spiral convenience stair from 1st to basement. remove portion of floor & framing @ first floor dining room; frame new stairwell; add code compliant 5'0" spiral stair for convenience access; replace furnace and water heaters; add furnace at basement dwelling unit. | $10,000 |
| Feb 4, 2013 | Completed final sign-off Oct 2014 | 53 Delano Av | remodel 1st floor kitchen, nook, bath, add laundry. replace rear stair to grade. enlarge deckDetails
remodel 1st floor kitchen, nook, bath, add laundry. replace rear stair to grade. enlarge deck | $20,000 |
| Dec 5, 2012 | Completed final sign-off Feb 2013 | 292 Surrey St | rot repair, replace front stairs, more than 50%. replace in kind with wood.Details
rot repair, replace front stairs, more than 50%. replace in kind with wood. | $4,500 |
| Sep 3, 2010 | Completed final sign-off Oct 2010 | 374 28th Av | replace rear stairs-same footprint.Details
replace rear stairs-same footprint. | $10,000 |
| Aug 31, 2010 | Completed final sign-off Sep 2010 | 61 Caselli Av | revision to appl #200905118173: no pier fooitng, no steel beam, no pair closet - relocated to underneath stairs, layout change to bathroom.Details
revision to appl #200905118173: no pier fooitng, no steel beam, no pair closet - relocated to underneath stairs, layout change to bathroom. | |
| Jun 30, 2010 | Completed final sign-off Jan 2011 | 1079 Church St | remodel top floor bathroom. add wet bar in closet . add pull down folding stair to attic for storage with hall/attic floor framing for double headersDetails
remodel top floor bathroom. add wet bar in closet . add pull down folding stair to attic for storage with hall/attic floor framing for double headers | $22,000 |
| Aug 21, 2009 | Completed final sign-off Nov 2009 | 172 Clipper St | repair rot at front porch columns and part of lower walls. replace in kind with stucco patch. porch floor, roof, and stairs to remainDetails
repair rot at front porch columns and part of lower walls. replace in kind with stucco patch. porch floor, roof, and stairs to remain | $4,500 |
| Apr 9, 2009 | Completed final sign-off Aug 2010 | 1547 Noe St | merge 2 dwelling units into 1 dwelling unit. construct rear horizontal addition with new interior stair. (ref app 200904095957s for valley st bldg)Details
merge 2 dwelling units into 1 dwelling unit. construct rear horizontal addition with new interior stair. (ref app 200904095957s for valley st bldg) | $50,000 |
| Nov 19, 2008 | Completed final sign-off Jul 2009 | 265 28th St | reduce scope of work under appl #200710014218 to delete laundry room addition, delete half bath at ground floor, change rear stairs & deck.Details
reduce scope of work under appl #200710014218 to delete laundry room addition, delete half bath at ground floor, change rear stairs & deck. | |
| Nov 17, 2008 | Completed final sign-off Dec 2008 | 205 Downey St | repair part of rear stairs. replace 2 posts and parts of upper flight & top landing. leave lower flight rot repair work less than 50%.Details
repair part of rear stairs. replace 2 posts and parts of upper flight & top landing. leave lower flight rot repair work less than 50%. | $7,500 |
| Jun 5, 2008 | Completed final sign-off Sep 2008 | 118 Coso Av | add conditioned space in (e) bldg, replace non-required stair w/metal spiral stair, remodel bath on 2nd fl to powder room, remodel 2nd fl hall, enlarge 2nd floor closet, replace 2 windows in kind, remodel 1st fl storage to hall, not visable from street.Details
add conditioned space in (e) bldg, replace non-required stair w/metal spiral stair, remodel bath on 2nd fl to powder room, remodel 2nd fl hall, enlarge 2nd floor closet, replace 2 windows in kind, remodel 1st fl storage to hall, not visable from street. | $15,000 |
| Feb 27, 2008 | Completed final sign-off Jul 2008 | 112 Eastwood Dr | remodel kitchen, move 1 wall at stairs, new cainbets, countertops. replace 10 windows in kind (5) facing street. redo fireplace, indoor remodeling.Details
remodel kitchen, move 1 wall at stairs, new cainbets, countertops. replace 10 windows in kind (5) facing street. redo fireplace, indoor remodeling. | $25,000 |
| Dec 13, 2007 | Expired or cancelled expired Aug 2008 | 28 Short St | interior remodel kitchen, bath and great room. add 4 beams and posts, enclose "tunnel entry stair, add fire rated dry wall at garage. add closet to bedroom #3, replace all windows (approx 13), rplace rear stairs in kind, remove 2 skylights and add 3 new flat skylights.Details
interior remodel kitchen, bath and great room. add 4 beams and posts, enclose "tunnel entry stair, add fire rated dry wall at garage. add closet to bedroom #3, replace all windows (approx 13), rplace rear stairs in kind, remove 2 skylights and add 3 new flat skylights. | $75,000 |
| Dec 5, 2007 | Completed final sign-off Jun 2008 | 862 Church St | replace finishes at front stair - new tile; remodel 2nd floor bath - new tile , fixtures. remodel 1st floor kitchen - no floor plan changes, new cabinets countertops. no wall removal at bath & kitchen.Details
replace finishes at front stair - new tile; remodel 2nd floor bath - new tile , fixtures. remodel 1st floor kitchen - no floor plan changes, new cabinets countertops. no wall removal at bath & kitchen. | $40,000 |
| Oct 10, 2007 | Completed final sign-off Oct 2007 | 1663 Bush St | revision to appl/#200504119673. to delete new door and stairs @ rear and (n) kitchen work. existing door & kitchen to remain.Details
revision to appl/#200504119673. to delete new door and stairs @ rear and (n) kitchen work. existing door & kitchen to remain. | |
| Oct 9, 2007 | Completed final sign-off Nov 2007 | 862 Church St | replace rear stairs in kind.Details
replace rear stairs in kind. | $5,000 |
| Jun 15, 2007 | Completed final sign-off Dec 2007 | 920 Faxon Av | replace front stairs per termite report 32848 items 4a 4b. replace 25 lineal feet of foundation between house and new front entrance stairDetails
replace front stairs per termite report 32848 items 4a 4b. replace 25 lineal feet of foundation between house and new front entrance stair | $25,000 |
| Mar 8, 2006 | Completed final sign-off Nov 2006 | 4284 23rd St | add bedroom, music room, bathroom, laundry room at basement, add interior stair from 1st floor to basement change full bath to powder roomDetails
add bedroom, music room, bathroom, laundry room at basement, add interior stair from 1st floor to basement change full bath to powder room | $60,000 |
| Dec 30, 2005 | Completed final sign-off Jun 2006 | 586 19th Av | horizontal addition- remodel kitchen new cabinets, counters, flooring, one new window one new door; remodel powder room- new fixtures, new location; relocate back stairs to sideDetails
horizontal addition- remodel kitchen new cabinets, counters, flooring, one new window one new door; remodel powder room- new fixtures, new location; relocate back stairs to side | $50,000 |
| Dec 27, 2005 | Completed final sign-off Sep 2006 | 65 Whitney St | add bedroom at lower floor. remodel bath at lower floor. revise stairway to lower floor.Details
add bedroom at lower floor. remodel bath at lower floor. revise stairway to lower floor. | $50,000 |
| Nov 10, 2005 | Expired or cancelled expired Feb 2007 | 99 San Anselmo Av | kitchen remodel, open wall to den. relocate stairs @ 2nd fl.Details
kitchen remodel, open wall to den. relocate stairs @ 2nd fl. | $75,000 |
| Nov 10, 2004 | Completed final sign-off Jan 2005 | 1079 Church St | replace front stairs w/narrower stairsDetails
replace front stairs w/narrower stairs | $8,500 |
| Jun 28, 2004 | Completed final sign-off Feb 2005 | 3320 Washington St | replace planter retaining wall at front/replace wood stairs in same configuration to 3322 & tile itDetails
replace planter retaining wall at front/replace wood stairs in same configuration to 3322 & tile it | $38,000 |
| Apr 27, 2004 | Completed final sign-off Jun 2004 | 1663 Bush St | replace rear wood stairs in kind from grd to top flrDetails
replace rear wood stairs in kind from grd to top flr | $8,500 |
| Jan 22, 2004 | Completed final sign-off Mar 2004 | 325 Webster St | comply w/nov 200234872- repair guardrail at front stairs, repair exterior side stairs, (less than 50Details
comply w/nov 200234872- repair guardrail at front stairs, repair exterior side stairs, (less than 50 | $4,000 |
| Nov 26, 2003 | Completed final sign-off Jan 2004 | 550 Liberty St | stair replacement and room supportDetails
stair replacement and room support | $12,000 |
| Aug 14, 2003 | Completed final sign-off Dec 2003 | 45 Bache St | rev#200301064633 s-1/r-1 change stair a basement to be a closet floorDetails
rev#200301064633 s-1/r-1 change stair a basement to be a closet floor | $1,000 |
| Jan 28, 2003 | Completed final sign-off Mar 2003 | 1115 Castro St | rot repair, rplace rear stairs in kind, from grade to 1st fl, then to 2nd flDetails
rot repair, rplace rear stairs in kind, from grade to 1st fl, then to 2nd fl | $20,000 |
| Jun 10, 2002 | Completed final sign-off Sep 2002 | 1504 Willard St | repl 3 footings & add grade beams @rear center;stair & deck accssble by one unit onlyDetails
repl 3 footings & add grade beams @rear center;stair & deck accssble by one unit only | $11,500 |
| Apr 22, 2002 | Completed final sign-off Aug 2002 | 307 Chattanooga St | rot repair at existing side stairs replace in kind less than 50% to be involvedDetails
rot repair at existing side stairs replace in kind less than 50% to be involved | $2,000 |
| Apr 16, 2002 | Completed final sign-off Jun 2002 | 2714 Harrison St | repl front east & left south side fndtn approx 80 ft.;rmve & repl front stairs like kindDetails
repl front east & left south side fndtn approx 80 ft.;rmve & repl front stairs like kind | $20,000 |
| Apr 6, 2001 | Completed final sign-off May 2001 | 52 Santa Rosa Av | replace rear deck with smaller deck, replace stairs in kindDetails
replace rear deck with smaller deck, replace stairs in kind | $5,000 |
| Apr 6, 2001 | Completed final sign-off May 2001 | 52 Santa Rosa Av | repair front stairs new stringers treads risers and railsDetails
repair front stairs new stringers treads risers and rails | $3,500 |
| Apr 3, 2000 | Completed final sign-off Apr 2002 | 56 Laidley St | ground fl-reconfigure stair to 1st floor, new coat closet; 1st floor-new kitchen, add half bath, newDetails
ground fl-reconfigure stair to 1st floor, new coat closet; 1st floor-new kitchen, add half bath, new | $98,000 |