Back to bathroom remodel contractors
Wallace Remodeling Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2018
- Last 24 months
- 0 permits filed
285 permits since 2000: 252 completed, 12 never finaled, 21 expired or cancelled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
93 bathroom remodel permits: 82 completed, 4 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2018 | Completed final sign-off Jun 2019 | 104 Eagle St | remodel kitchen: new floor, cabinets, tops, appliances. remodel bath new tile and fixtures. no exterior work. no floor plan changes.Details
remodel kitchen: new floor, cabinets, tops, appliances. remodel bath new tile and fixtures. no exterior work. no floor plan changes. | $36,837 |
| Nov 10, 2017 | Completed final sign-off Jul 2018 | 954 Chenery St | revision to opa 2015-0820-4806 - relocate kitchen, bath and laundry. no-structural work. no building envelope change. replace rear foundation, dry-rot repairs.Details
revision to opa 2015-0820-4806 - relocate kitchen, bath and laundry. no-structural work. no building envelope change. replace rear foundation, dry-rot repairs. | $35,000 |
| Oct 20, 2017 | Completed final sign-off Jun 2020 | 161 Dalewood Wy | interior remocel including kitchen & bathroom. new conditioned space @ ground floor (garage area) including new media & bath. new deck to be replaced (e) in rear yard. mep under separate permitDetails
interior remocel including kitchen & bathroom. new conditioned space @ ground floor (garage area) including new media & bath. new deck to be replaced (e) in rear yard. mep under separate permit | $197,700 |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 161 Dalewood Wy | remodel kitchen - replace cabinets, countertops flooring. no wal canges of exterior work. remodel bathroom - new tile and fixtures, selective demo to determine structural for other future permitDetails
remodel kitchen - replace cabinets, countertops flooring. no wal canges of exterior work. remodel bathroom - new tile and fixtures, selective demo to determine structural for other future permit | $40,000 |
| Apr 21, 2017 | Completed final sign-off May 2018 | 104 Eagle St | remodel bath & kitchen in lower unit, new cabinets, counter tops, tile, no building envelope changes, no wall changes, all lighting to be high efficacyDetails
remodel bath & kitchen in lower unit, new cabinets, counter tops, tile, no building envelope changes, no wall changes, all lighting to be high efficacy | $35,000 |
| Nov 4, 2016 | Completed final sign-off Mar 2017 | 1874 10th Av | revision to 201606220634 convert (e) storage room to 4th bedroom and 1/2 bathDetails
revision to 201606220634 convert (e) storage room to 4th bedroom and 1/2 bath | $10,000 |
| Oct 26, 2016 | Expired or cancelled expired Sep 2019 | 54 Miraloma Dr | convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add windowDetails
convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add window | $50,000 |
| Jun 22, 2016 | Completed final sign-off Mar 2017 | 1874 10th Av | renovate rooms down. remodel master bathroom, convert office to bedroom. add laundry closet, add integral stair, move cabinet in kitchen on second floor. addition of 280 sf habitable area on ground floor. selective structural strengthening work.Details
renovate rooms down. remodel master bathroom, convert office to bedroom. add laundry closet, add integral stair, move cabinet in kitchen on second floor. addition of 280 sf habitable area on ground floor. selective structural strengthening work. | $75,000 |
| Apr 1, 2016 | Completed final sign-off Dec 2016 | 2107 28th Av | downstairs room - reconfigure to create new bedroom - to replace (e), game room, new bathroom - to replace (e), wine storage and mechanical roomDetails
downstairs room - reconfigure to create new bedroom - to replace (e), game room, new bathroom - to replace (e), wine storage and mechanical room | $120,000 |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 1650 Jackson St | unit #506: remodel kitchen - new cabinets, tops & fixtures. remodel bath - new tile, vanity and fixtures. no structural work. no exterior workDetails
unit #506: remodel kitchen - new cabinets, tops & fixtures. remodel bath - new tile, vanity and fixtures. no structural work. no exterior work | $25,000 |
| Aug 20, 2015 | Completed final sign-off Jul 2018 | 954 Chenery St | replace (e) foundation. boldt (e) 1st fl. framing to new foundtion. add new 3rdflr above (e) 2nd flr. provide 3 new bedrms, 2 baths, closets, flat roof. provide 3 new shear walls from foundation to new roof. open kitchen-dining wall, provide new posts, beam, footing. open 1st fl. bedroom-hall nonDetails
replace (e) foundation. boldt (e) 1st fl. framing to new foundtion. add new 3rdflr above (e) 2nd flr. provide 3 new bedrms, 2 baths, closets, flat roof. provide 3 new shear walls from foundation to new roof. open kitchen-dining wall, provide new posts, beam, footing. open 1st fl. bedroom-hall non | $200,000 |
| Aug 20, 2015 | Completed final sign-off Jan 2016 | 4316 26th St | remodel 2nd flr bath, new tile, new cabinets, new plumbing fixtures, no structural work/no wall modification.Details
remodel 2nd flr bath, new tile, new cabinets, new plumbing fixtures, no structural work/no wall modification. | $15,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2017 | 442 Staples Av | legalize in-law unit per ordinance #43-14 lower slab remodel bath & kitchen with great room.Details
legalize in-law unit per ordinance #43-14 lower slab remodel bath & kitchen with great room. | $90,000 |
| Jun 29, 2015 | Never finaled issued Jun 2015, no final | 1940 Sacramento St | partial kitchen remodel: new base cabinets and countertops. partial master bath remodel - new tile floor and lavy. add laundry in den closet new lights in living room. n/a maher ord. # 155-13Details
partial kitchen remodel: new base cabinets and countertops. partial master bath remodel - new tile floor and lavy. add laundry in den closet new lights in living room. n/a maher ord. # 155-13 | $25,000 |
| Jun 26, 2015 | Completed final sign-off Dec 2015 | 1940 Sacramento St | add skylight at entry hall, add solar tube at bathroom maher not reqDetails
add skylight at entry hall, add solar tube at bathroom maher not req | $5,000 |
| Mar 3, 2015 | Completed final sign-off Sep 2016 | 200 Stillings Av | remodel (e) bedroom and bath, replace (e) stairway with new code compliant and relocate extg laundry, repair dryrot at (e) deck and railing.Details
remodel (e) bedroom and bath, replace (e) stairway with new code compliant and relocate extg laundry, repair dryrot at (e) deck and railing. | $85,000 |
| Feb 26, 2015 | Completed final sign-off May 2015 | 43 Ellert St | top level floor unit 45 : remodel kitchen and 2 bathts, middle level unit 43: remodel kitchen and 1 bath. no change in layout and openings. replace lighting with high eff.Details
top level floor unit 45 : remodel kitchen and 2 bathts, middle level unit 43: remodel kitchen and 1 bath. no change in layout and openings. replace lighting with high eff. | $75,000 |
| Feb 24, 2015 | Completed final sign-off Oct 2015 | 2694 23rd Av | legalizing 2 bedrooms and 1 bathroom on 1st flr. relocate laundry rom. replace windows at bedrooms and new bath with wood windows - size for size.Details
legalizing 2 bedrooms and 1 bathroom on 1st flr. relocate laundry rom. replace windows at bedrooms and new bath with wood windows - size for size. | $80,000 |
| Feb 3, 2015 | Completed final sign-off Jun 2016 | 551 Eureka St | add bedroom, bath, laundry, storage at first floor. remodel kitchen, dining room, powder room. replace deck at 2nd floor. remodel bath and closets at 3rd floor.Details
add bedroom, bath, laundry, storage at first floor. remodel kitchen, dining room, powder room. replace deck at 2nd floor. remodel bath and closets at 3rd floor. | $225,000 |
| Oct 24, 2014 | Completed final sign-off Oct 2015 | 1168 Page St | add bedroom in former storage area. remodel bedroom, bathroom, add laundry at 1st fl. remodel kitchen to great room on 2nd fl. rear stairs, doors, windows. no envelope expansion. no work visible from street.Details
add bedroom in former storage area. remodel bedroom, bathroom, add laundry at 1st fl. remodel kitchen to great room on 2nd fl. rear stairs, doors, windows. no envelope expansion. no work visible from street. | $50,000 |
| Aug 19, 2014 | Expired or cancelled withdrawn Jan 2015 | 912 Steiner St | refurbish 1st fl rooms. half bath only, on ground floor. no building expansion.Details
refurbish 1st fl rooms. half bath only, on ground floor. no building expansion. | $40,000 |
| Jul 30, 2014 | Completed final sign-off Nov 2014 | 1531 Noe St | remodel one bath - convert tub to shower. new tile, new cabinets & new fixtures. non structural.Details
remodel one bath - convert tub to shower. new tile, new cabinets & new fixtures. non structural. | $10,000 |
| Jul 9, 2014 | Completed final sign-off Sep 2014 | 310 Diamond St | remodel ground floor bathroom - change tub to shower, new tile, new fixtures.Details
remodel ground floor bathroom - change tub to shower, new tile, new fixtures. | $9,037 |
| May 9, 2014 | Completed final sign-off Oct 2014 | 2694 23rd Av | remodle top floor bathroom - keep tub, new tiels, new pedestal sink. to comply with cec15(k) 10Details
remodle top floor bathroom - keep tub, new tiels, new pedestal sink. to comply with cec15(k) 10 | $12,000 |
| Mar 11, 2014 | Completed final sign-off Oct 2014 | 357 Allison St | add rooms at 1st floor down - 2 bedrooms, 1 bath, 1 laundry.Details
add rooms at 1st floor down - 2 bedrooms, 1 bath, 1 laundry. | $50,000 |
| Jan 22, 2014 | Completed final sign-off Feb 2014 | 47 Clifford Tr | add attic access ladder. add skylight in bathroom. not visible from street. add solar attic fanDetails
add attic access ladder. add skylight in bathroom. not visible from street. add solar attic fan | $4,000 |
| Nov 5, 2013 | Completed final sign-off Dec 2013 | 142 Clearfield Dr | replace shower pan and bottom tile at upper bath. replace shower stall with bathtub at lower bath with new toilet, vanity and resilient flooring. no wall changes - no exterior work.Details
replace shower pan and bottom tile at upper bath. replace shower stall with bathtub at lower bath with new toilet, vanity and resilient flooring. no wall changes - no exterior work. | $11,000 |
| Jun 25, 2013 | Completed final sign-off Sep 2013 | 112 Eastwood Dr | partial bath remodel change tub to tile showerDetails
partial bath remodel change tub to tile shower | $5,000 |
| Apr 23, 2013 | Completed final sign-off Jun 2013 | 47 Arroyo Wy | remodel hall bath new tile, new fixtures, same location on main level vacancy light switches.Details
remodel hall bath new tile, new fixtures, same location on main level vacancy light switches. | $10,000 |
| Apr 23, 2013 | Completed final sign-off Jul 2013 | 768 Dartmouth St | remodel bath new tile, new fixtures, same location, vacancy light switches.Details
remodel bath new tile, new fixtures, same location, vacancy light switches. | $10,000 |
| Feb 22, 2013 | Completed final sign-off Oct 2013 | 793 Cole St | remodel kitchen with new partition, remodel bath to powder room, remodel 2 hall closets.Details
remodel kitchen with new partition, remodel bath to powder room, remodel 2 hall closets. | $40,000 |
| Feb 4, 2013 | Completed final sign-off Oct 2014 | 53 Delano Av | remodel 1st floor kitchen, nook, bath, add laundry. replace rear stair to grade. enlarge deckDetails
remodel 1st floor kitchen, nook, bath, add laundry. replace rear stair to grade. enlarge deck | $20,000 |
| Aug 23, 2012 | Never finaled issued Aug 2012, no final | 5001 Diamond Heights Bl | remodel 1st floor, new partitions for bedroom, bath, dressing room, hall, laundry. no exterior workDetails
remodel 1st floor, new partitions for bedroom, bath, dressing room, hall, laundry. no exterior work | $25,000 |
| Jun 7, 2012 | Completed final sign-off Nov 2012 | 457 Dellbrook Av | remodel gound level: add office, bedroom/family room, bathroom, wet bar. all work at 1st floor.Details
remodel gound level: add office, bedroom/family room, bathroom, wet bar. all work at 1st floor. | $25,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2013 | 567 Mangels Av | add 1 bathroom, legalize 1 bedroom, office and closet on ground floor. house will be 3 bedrooms and 2 bathrooms.Details
add 1 bathroom, legalize 1 bedroom, office and closet on ground floor. house will be 3 bedrooms and 2 bathrooms. | $15,000 |
| Jan 31, 2012 | Completed final sign-off Apr 2012 | 19 Edith St | remodel master bath - new cabinets, fixtures, tile flourescents. no change on walls and openings. partial kitchen remodel - 2 new cabinets - remove fireplace, new sink.Details
remodel master bath - new cabinets, fixtures, tile flourescents. no change on walls and openings. partial kitchen remodel - 2 new cabinets - remove fireplace, new sink. | $25,000 |
| Jan 25, 2012 | Completed final sign-off Mar 2012 | 1015 Lake St | add led lighting to studio ceiling (12) recessed fixtures. replace ceiling with 5/8" type x drywall. replace bathroom vanity top - new laminate top.Details
add led lighting to studio ceiling (12) recessed fixtures. replace ceiling with 5/8" type x drywall. replace bathroom vanity top - new laminate top. | $7,500 |
| Sep 14, 2011 | Completed final sign-off Jan 2012 | 840 Sloat Bl | add bedroom and bath at 1st floor to make house 3 bedrooms and 2 baths.Details
add bedroom and bath at 1st floor to make house 3 bedrooms and 2 baths. | $20,000 |
| Jun 27, 2011 | Completed final sign-off Sep 2011 | 118 Coso Av | partial bath remodel - new tub - new tile and pedestal - add laundry hookups in same bathroomDetails
partial bath remodel - new tub - new tile and pedestal - add laundry hookups in same bathroom | $7,500 |
| May 19, 2011 | Never finaled issued May 2011, no final | 15 Laidley St | bath room remodeling partial: new tile over (e) tile floor. replace claw foot bath tub with local new plumbing (no electrical) bathroom on upper floor.Details
bath room remodeling partial: new tile over (e) tile floor. replace claw foot bath tub with local new plumbing (no electrical) bathroom on upper floor. | $2,000 |
| Dec 8, 2010 | Completed final sign-off Feb 2011 | 457 Dellbrook Av | replace kitchen window and bath window. windows not visible from street. no opening change. new windows to be fiberglass sliders - tempered safety glass at bathroom.Details
replace kitchen window and bath window. windows not visible from street. no opening change. new windows to be fiberglass sliders - tempered safety glass at bathroom. | $1,000 |
| Oct 5, 2010 | Completed final sign-off Feb 2011 | 457 Dellbrook Av | kitchen remodel -replace cabinets & counter tops, lighting to be fluorescent, bath remodel, lighting to be fluorescent, new shower stall, new tile floor, new vanity cabinetDetails
kitchen remodel -replace cabinets & counter tops, lighting to be fluorescent, bath remodel, lighting to be fluorescent, new shower stall, new tile floor, new vanity cabinet | $25,200 |
| Sep 3, 2010 | Completed final sign-off Mar 2011 | 55 Almaden Ct | remodel master bath, new tile & fixtures. remodel powder room, new tile & fixtures. remodel kitchen, new cabinets & tops.Details
remodel master bath, new tile & fixtures. remodel powder room, new tile & fixtures. remodel kitchen, new cabinets & tops. | $35,000 |
| Sep 3, 2010 | Completed final sign-off Jan 2011 | 1079 Church St | add skylight in bathroom. revision to appl.#201006305701.Details
add skylight in bathroom. revision to appl.#201006305701. | $2,000 |
| Aug 31, 2010 | Completed final sign-off Sep 2010 | 61 Caselli Av | revision to appl #200905118173: no pier fooitng, no steel beam, no pair closet - relocated to underneath stairs, layout change to bathroom.Details
revision to appl #200905118173: no pier fooitng, no steel beam, no pair closet - relocated to underneath stairs, layout change to bathroom. | |
| Aug 11, 2010 | Completed final sign-off Dec 2010 | 3937 23rd St | remodel top floor bathroom. new tub, tile vanity, toilet 7'x9'. electrical lights fluorescent or with occupancy "manuel on" switches, new fan.Details
remodel top floor bathroom. new tub, tile vanity, toilet 7'x9'. electrical lights fluorescent or with occupancy "manuel on" switches, new fan. | $15,000 |
| Jun 30, 2010 | Completed final sign-off Jan 2011 | 1079 Church St | remodel top floor bathroom. add wet bar in closet . add pull down folding stair to attic for storage with hall/attic floor framing for double headersDetails
remodel top floor bathroom. add wet bar in closet . add pull down folding stair to attic for storage with hall/attic floor framing for double headers | $22,000 |
| May 28, 2010 | Completed final sign-off Feb 2011 | 77 Fair Oaks St | remodel/ interior work to provide ccessibility and accomodation for disability. revise powder room to full bath. remodel master bath - new fixtures and tile. remodel kitchen incl. new cabs and counter tops.Details
remodel/ interior work to provide ccessibility and accomodation for disability. revise powder room to full bath. remodel master bath - new fixtures and tile. remodel kitchen incl. new cabs and counter tops. | $35,000 |
| May 7, 2010 | Completed final sign-off Aug 2010 | 658 Joost Av | add bathroom on main floor, remodel closets, relocate bedroom doors, new skylight on roof, no expansion or exterior work.Details
add bathroom on main floor, remodel closets, relocate bedroom doors, new skylight on roof, no expansion or exterior work. | $15,000 |
| May 11, 2009 | Completed final sign-off Sep 2009 | 107 Eastwood Dr | remodel 2 baths to be full baths. replace tile at fireplace. all work on 2nd floor.Details
remodel 2 baths to be full baths. replace tile at fireplace. all work on 2nd floor. | $26,500 |
| May 11, 2009 | Completed final sign-off Sep 2010 | 61 Caselli Av | replace cracked beam at bottom level, remodel bath at bottom level, remodel storage & eliminate dark room at bwer level.Details
replace cracked beam at bottom level, remodel bath at bottom level, remodel storage & eliminate dark room at bwer level. | $22,500 |
| Mar 6, 2009 | Completed final sign-off Aug 2009 | 826 Rhode Island St | relocate bath #2. remodel bath #1. remodel kitchen. replace six windows-same openings at front. no structural work of building envelope changes.Details
relocate bath #2. remodel bath #1. remodel kitchen. replace six windows-same openings at front. no structural work of building envelope changes. | $40,000 |
| Nov 19, 2008 | Completed final sign-off Jul 2009 | 265 28th St | reduce scope of work under appl #200710014218 to delete laundry room addition, delete half bath at ground floor, change rear stairs & deck.Details
reduce scope of work under appl #200710014218 to delete laundry room addition, delete half bath at ground floor, change rear stairs & deck. | |
| Nov 17, 2008 | Completed final sign-off Dec 2008 | 2475 43rd Av | remodel 1 bathroom only. new tile floor, new tub w/ shower, new toilet and lavy. no wall removal.Details
remodel 1 bathroom only. new tile floor, new tub w/ shower, new toilet and lavy. no wall removal. | $8,838 |
| Jun 5, 2008 | Completed final sign-off Sep 2008 | 118 Coso Av | add conditioned space in (e) bldg, replace non-required stair w/metal spiral stair, remodel bath on 2nd fl to powder room, remodel 2nd fl hall, enlarge 2nd floor closet, replace 2 windows in kind, remodel 1st fl storage to hall, not visable from street.Details
add conditioned space in (e) bldg, replace non-required stair w/metal spiral stair, remodel bath on 2nd fl to powder room, remodel 2nd fl hall, enlarge 2nd floor closet, replace 2 windows in kind, remodel 1st fl storage to hall, not visable from street. | $15,000 |
| Dec 13, 2007 | Expired or cancelled expired Aug 2008 | 28 Short St | interior remodel kitchen, bath and great room. add 4 beams and posts, enclose "tunnel entry stair, add fire rated dry wall at garage. add closet to bedroom #3, replace all windows (approx 13), rplace rear stairs in kind, remove 2 skylights and add 3 new flat skylights.Details
interior remodel kitchen, bath and great room. add 4 beams and posts, enclose "tunnel entry stair, add fire rated dry wall at garage. add closet to bedroom #3, replace all windows (approx 13), rplace rear stairs in kind, remove 2 skylights and add 3 new flat skylights. | $75,000 |
| Dec 5, 2007 | Completed final sign-off Jun 2008 | 862 Church St | replace finishes at front stair - new tile; remodel 2nd floor bath - new tile , fixtures. remodel 1st floor kitchen - no floor plan changes, new cabinets countertops. no wall removal at bath & kitchen.Details
replace finishes at front stair - new tile; remodel 2nd floor bath - new tile , fixtures. remodel 1st floor kitchen - no floor plan changes, new cabinets countertops. no wall removal at bath & kitchen. | $40,000 |
| Nov 27, 2007 | Expired or cancelled expired Aug 2008 | 28 Short St | remodel upper floor bath-new tub, toilet, sink, tile. remodel lower floor bath, new shower, toilet, 2 sinks tile. repair rot at left front corner-top floor-replace wood in kind, patch stucco.Details
remodel upper floor bath-new tub, toilet, sink, tile. remodel lower floor bath, new shower, toilet, 2 sinks tile. repair rot at left front corner-top floor-replace wood in kind, patch stucco. | $20,000 |
| Oct 19, 2007 | Completed final sign-off Mar 2008 | 42 Bache St | remodel to provide 2 new bedrooms, 1 bathroom, new egress door,relocate w/h and furnance to new utility room, 1 hour separation at garage, reduce size of garage,,lower landing at new bedroom,Details
remodel to provide 2 new bedrooms, 1 bathroom, new egress door,relocate w/h and furnance to new utility room, 1 hour separation at garage, reduce size of garage,,lower landing at new bedroom, | $40,000 |
| Sep 28, 2007 | Completed final sign-off Sep 2008 | 2154 09th Av | remodel 1st floor bath. new tile and fixtures. remodel 2nd floor bath. new tile and fixtures. repair 2nd floor master bath. fix leak at tub add new cabinets on way. no structural workDetails
remodel 1st floor bath. new tile and fixtures. remodel 2nd floor bath. new tile and fixtures. repair 2nd floor master bath. fix leak at tub add new cabinets on way. no structural work | $20,000 |
| Sep 19, 2007 | Completed final sign-off Jan 2008 | 3600 Lyon St | remodel 1 hall bath. new tub, toilet, cabinets, sink, tile. no lighting changeDetails
remodel 1 hall bath. new tub, toilet, cabinets, sink, tile. no lighting change | $10,000 |
| Mar 2, 2007 | Completed final sign-off Oct 2007 | 4293 23rd St | add bathroom at rear-215 sq ft underneath cantilevered room. add door from garage to side yard. all work at rear not visible from street.Details
add bathroom at rear-215 sq ft underneath cantilevered room. add door from garage to side yard. all work at rear not visible from street. | $50,000 |
| Feb 2, 2007 | Completed final sign-off Jan 2008 | 339 Chattanooga St | add 1 bathroom within top floor bedroom remodel 2nd 1 bathroom (2 total bathrooms).Details
add 1 bathroom within top floor bedroom remodel 2nd 1 bathroom (2 total bathrooms). | $25,000 |
| Nov 10, 2006 | Completed final sign-off Mar 2007 | 576 28th St | add bathroom and legalize bedroom adjacent to garage @ ground floor.Details
add bathroom and legalize bedroom adjacent to garage @ ground floor. | $20,000 |
| May 12, 2006 | Completed final sign-off Sep 2006 | 325 Webster St | #329- add bedroom at parlor area, bath-new tile and fixtures, kitchen-new floor & countertops. #325-revert "study" to bedroom, hall egress ceiling height corrected. ref 200406287478 & 200406176711.Details
#329- add bedroom at parlor area, bath-new tile and fixtures, kitchen-new floor & countertops. #325-revert "study" to bedroom, hall egress ceiling height corrected. ref 200406287478 & 200406176711. | $15,000 |
| Mar 8, 2006 | Completed final sign-off Nov 2006 | 4284 23rd St | add bedroom, music room, bathroom, laundry room at basement, add interior stair from 1st floor to basement change full bath to powder roomDetails
add bedroom, music room, bathroom, laundry room at basement, add interior stair from 1st floor to basement change full bath to powder room | $60,000 |
| Feb 16, 2006 | Completed final sign-off Aug 2007 | 40 Ravenwood Dr | horizontal addition- add bathroom & bedroom at 2nd floor, add nook at 1st floor.Details
horizontal addition- add bathroom & bedroom at 2nd floor, add nook at 1st floor. | $60,000 |
| Dec 27, 2005 | Completed final sign-off Sep 2006 | 65 Whitney St | add bedroom at lower floor. remodel bath at lower floor. revise stairway to lower floor.Details
add bedroom at lower floor. remodel bath at lower floor. revise stairway to lower floor. | $50,000 |
| Dec 23, 2005 | Expired or cancelled cancelled Jan 2008 | 3921 21st St | add upper floor with 1 bedroom & 1 bath.Details
add upper floor with 1 bedroom & 1 bath. | $60,000 |
| Dec 9, 2005 | Completed final sign-off May 2007 | 1480 Noe St | master bath suite addition- kitchen and bath remodelDetails
master bath suite addition- kitchen and bath remodel | $117,500 |
| Dec 8, 2005 | Completed final sign-off Mar 2006 | 1548 Grove St | remodel bathroom on top floor- new tile floor, new shower stall & toilet fixtures-no exterior changes or wall movingDetails
remodel bathroom on top floor- new tile floor, new shower stall & toilet fixtures-no exterior changes or wall moving | $18,000 |
| Dec 8, 2005 | Completed final sign-off Jul 2006 | 327 Webster St | remodel kitchen, new cabinets, countertops, appliances, no moving of walls-no exterior changes, remodel bath & half bath new toilets, tile; add forced air heat- remove wall heater; replace 6 rear windows w/wood double hung units, .67 u-factor minimumDetails
remodel kitchen, new cabinets, countertops, appliances, no moving of walls-no exterior changes, remodel bath & half bath new toilets, tile; add forced air heat- remove wall heater; replace 6 rear windows w/wood double hung units, .67 u-factor minimum | $25,000 |
| Jun 30, 2005 | Completed final sign-off Nov 2005 | 2579 16th Av | kitchen remodel- replace cabs, countertops, appliances, in same locations. new finish floor-bath reDetails
kitchen remodel- replace cabs, countertops, appliances, in same locations. new finish floor-bath re | $75,000 |
| Apr 11, 2005 | Completed final sign-off Oct 2007 | 1663 Bush St | add bath and laundry and remodel 3rd flr/add powder room & remodel kchn/entertainment rm 2ndDetails
add bath and laundry and remodel 3rd flr/add powder room & remodel kchn/entertainment rm 2nd | $247,000 |
| Jan 7, 2005 | Completed final sign-off Sep 2005 | 936 Page St | remodel kitchen, bath 1 & 2, add laundry closet.Details
remodel kitchen, bath 1 & 2, add laundry closet. | $95,000 |
| Jan 7, 2005 | Completed final sign-off Nov 2007 | 2815 Pine St | remodel bathroom & kitchen, to remove illegal unit at g/f.Details
remodel bathroom & kitchen, to remove illegal unit at g/f. | $85,000 |
| Jan 5, 2005 | Completed final sign-off May 2005 | 85 Fernwood Dr | add bath in 2nd bedroom, remodel master bathDetails
add bath in 2nd bedroom, remodel master bath | $75,000 |
| Sep 24, 2004 | Completed final sign-off Dec 2004 | 550 Liberty St | bath remodel new tile,new tub & toilet no exterior work no well chanesDetails
bath remodel new tile,new tub & toilet no exterior work no well chanes | $15,000 |
| Sep 24, 2004 | Completed final sign-off Apr 2005 | 2526 Fulton St | remodel kitchen, new cabinets, countertop. rmdl bath,tile, lavy, fixtures,non strucDetails
remodel kitchen, new cabinets, countertop. rmdl bath,tile, lavy, fixtures,non struc | $40,000 |
| Jun 28, 2004 | Completed final sign-off Feb 2006 | 325 Webster St | interior remodel only/kchn/bath/closet/heatDetails
interior remodel only/kchn/bath/closet/heat | $75,000 |
| Jun 3, 2004 | Completed final sign-off Nov 2004 | 150 Lombard St | remodeling kitchen. new finish flr, new cabs & tops remodeling baths new tile & fixturesDetails
remodeling kitchen. new finish flr, new cabs & tops remodeling baths new tile & fixtures | $50,000 |
| Nov 26, 2003 | Completed final sign-off Feb 2004 | 150 Lombard St | bath remodel new shower tile. new toilet. unit 701 onlyDetails
bath remodel new shower tile. new toilet. unit 701 only | $10,000 |
| Sep 8, 2003 | Completed final sign-off Feb 2004 | 770 Teresita Bl | add bedroom and bathroom on 1st flrDetails
add bedroom and bathroom on 1st flr | $50,000 |
| Jan 6, 2003 | Completed final sign-off Dec 2003 | 45 Bache St | add bedroom and bath on new partial 3rd floorDetails
add bedroom and bath on new partial 3rd floor | $75,000 |
| Feb 14, 2002 | Completed final sign-off Jul 2003 | 108 Lunado Wy | horizontal & vertical addition, add family room on 1/fl., add bedrm/bath/office on 2/flDetails
horizontal & vertical addition, add family room on 1/fl., add bedrm/bath/office on 2/fl | $100,000 |
| Jan 11, 2001 | Completed final sign-off Jul 2001 | 920 Faxon Av | remodel kitchen. new cabinets, tops, appliance, hardwood flr, remodel bthrm on lower flr, new bath tDetails
remodel kitchen. new cabinets, tops, appliance, hardwood flr, remodel bthrm on lower flr, new bath t | $75,000 |
| Jun 22, 2000 | Completed final sign-off Jan 2001 | 1490 Willard St | remodel bath on top floor, new tub, vanity, toilet, cabinetsDetails
remodel bath on top floor, new tub, vanity, toilet, cabinets | $25,000 |
| Apr 18, 2000 | Completed final sign-off Oct 2000 | 459 Lakeshore Dr | remodel existing bath, new cabinets & fixtures, new tileDetails
remodel existing bath, new cabinets & fixtures, new tile | $12,500 |
| Apr 3, 2000 | Completed final sign-off Apr 2002 | 56 Laidley St | ground fl-reconfigure stair to 1st floor, new coat closet; 1st floor-new kitchen, add half bath, newDetails
ground fl-reconfigure stair to 1st floor, new coat closet; 1st floor-new kitchen, add half bath, new | $98,000 |
| Mar 13, 2000 | Expired or cancelled expired Jun 2001 | 963 14th St | remodel bath on top floor, relocate 1 shearwall.Details
remodel bath on top floor, relocate 1 shearwall. | $15,000 |
| Feb 24, 2000 | Expired or cancelled expired Jun 2000 | 139 Olympia Wy | replace windows, same size, bathroom, bedroosm, laundry windowsDetails
replace windows, same size, bathroom, bedroosm, laundry windows | |
| Feb 22, 2000 | Completed final sign-off Jun 2000 | 2025 Castro St | partial bath remodel, new tile floor, toiletDetails
partial bath remodel, new tile floor, toilet | |
| Feb 2, 2000 | Completed final sign-off Aug 2000 | 139 Olympia Wy | remodel kitchen and two bathsDetails
remodel kitchen and two baths |