Wallace Remodeling Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Aug 2018
- Last 24 months
- 0 permits filed
285 permits since 2000: 252 completed, 12 never finaled, 21 expired or cancelled.
Of the 12 never-finaled permits, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 285.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2018 | Completed final sign-off Jun 2019 | 104 Eagle St | remodel kitchen: new floor, cabinets, tops, appliances. remodel bath new tile and fixtures. no exterior work. no floor plan changes.Details
remodel kitchen: new floor, cabinets, tops, appliances. remodel bath new tile and fixtures. no exterior work. no floor plan changes. | $36,837 |
| Jul 2, 2018 | Completed final sign-off Feb 2019 | 28 Harry St | voluntary replacement of (e) foundation & voluntary seismic strengthening of cripple wallsDetails
voluntary replacement of (e) foundation & voluntary seismic strengthening of cripple walls | $50,000 |
| Dec 27, 2017 | Completed final sign-off Oct 2018 | 25 Castro St | drywall patching, remove/replace approx. 1,200 sq. ft., w/insulation as needed; remove/replace kitchen cabinets/counter tops, no wall changes.Details
drywall patching, remove/replace approx. 1,200 sq. ft., w/insulation as needed; remove/replace kitchen cabinets/counter tops, no wall changes. | $12,400 |
| Dec 27, 2017 | Completed final sign-off Feb 2018 | 23 Castro St | drywall patching, remove/replace approx 1200 sq. ft. w/insulation as neededDetails
drywall patching, remove/replace approx 1200 sq. ft. w/insulation as needed | $2,400 |
| Dec 6, 2017 | Never finaled issued Dec 2017, no final | 161 Dalewood Wy | replace 3 windows at front within the existing openings - casement wood interior aluminum exterior. u factor 0.32 max.Details
replace 3 windows at front within the existing openings - casement wood interior aluminum exterior. u factor 0.32 max. | $5,000 |
| Nov 10, 2017 | Completed final sign-off Jul 2018 | 954 Chenery St | revision to opa 2015-0820-4806 - relocate kitchen, bath and laundry. no-structural work. no building envelope change. replace rear foundation, dry-rot repairs.Details
revision to opa 2015-0820-4806 - relocate kitchen, bath and laundry. no-structural work. no building envelope change. replace rear foundation, dry-rot repairs. | $35,000 |
| Oct 20, 2017 | Completed final sign-off Jun 2020 | 161 Dalewood Wy | interior remocel including kitchen & bathroom. new conditioned space @ ground floor (garage area) including new media & bath. new deck to be replaced (e) in rear yard. mep under separate permitDetails
interior remocel including kitchen & bathroom. new conditioned space @ ground floor (garage area) including new media & bath. new deck to be replaced (e) in rear yard. mep under separate permit | $197,700 |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 161 Dalewood Wy | remodel kitchen - replace cabinets, countertops flooring. no wal canges of exterior work. remodel bathroom - new tile and fixtures, selective demo to determine structural for other future permitDetails
remodel kitchen - replace cabinets, countertops flooring. no wal canges of exterior work. remodel bathroom - new tile and fixtures, selective demo to determine structural for other future permit | $40,000 |
| May 4, 2017 | Completed final sign-off May 2018 | 104 Eagle St | replace 6 front windows with wood replacement units. no change to openings. u-factor 0.28Details
replace 6 front windows with wood replacement units. no change to openings. u-factor 0.28 | $6,000 |
| Apr 21, 2017 | Completed final sign-off May 2018 | 104 Eagle St | remodel bath & kitchen in lower unit, new cabinets, counter tops, tile, no building envelope changes, no wall changes, all lighting to be high efficacyDetails
remodel bath & kitchen in lower unit, new cabinets, counter tops, tile, no building envelope changes, no wall changes, all lighting to be high efficacy | $35,000 |
| Mar 23, 2017 | Completed final sign-off Jul 2018 | 954 Chenery St | revision to pa 2015-0820-4806 (s1/r1) replacement of failed retaining wall in garage. wall will be constructed in the same place as existing; no other changes will be madeDetails
revision to pa 2015-0820-4806 (s1/r1) replacement of failed retaining wall in garage. wall will be constructed in the same place as existing; no other changes will be made | $8,000 |
| Feb 2, 2017 | Expired or cancelled expired Sep 2019 | 54 Miraloma Dr | revision to 201610261199 move laundry & storage roomDetails
revision to 201610261199 move laundry & storage room | |
| Nov 4, 2016 | Completed final sign-off Mar 2017 | 1874 10th Av | revision to 201606220634 convert (e) storage room to 4th bedroom and 1/2 bathDetails
revision to 201606220634 convert (e) storage room to 4th bedroom and 1/2 bath | $10,000 |
| Oct 26, 2016 | Expired or cancelled expired Sep 2019 | 54 Miraloma Dr | convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add windowDetails
convert e family room to new bedroom 5. remodel e stairs. replace e window. add new bath 4. add window | $50,000 |
| Sep 30, 2016 | Completed final sign-off Nov 2016 | 2 Hugo St | to comply with nov 200339639, 200341822 remove illegal stairs as per notice of violation of 7-1-03 (complaint 20339639)Details
to comply with nov 200339639, 200341822 remove illegal stairs as per notice of violation of 7-1-03 (complaint 20339639) | $500 |
| Aug 8, 2016 | Completed final sign-off Nov 2016 | 3315 Cesar Chavez St | replace (e) furnace & (e) water heater @ garage level. n/a maher ordinanceDetails
replace (e) furnace & (e) water heater @ garage level. n/a maher ordinance | $5,000 |
| Jul 6, 2016 | Completed final sign-off Apr 2019 | 21 Castro St | create a new accessory dwelling unit in an (e) garage. to legalize an (e) roof deck.Details
create a new accessory dwelling unit in an (e) garage. to legalize an (e) roof deck. | $95,000 |
| Jun 22, 2016 | Completed final sign-off Mar 2017 | 1874 10th Av | renovate rooms down. remodel master bathroom, convert office to bedroom. add laundry closet, add integral stair, move cabinet in kitchen on second floor. addition of 280 sf habitable area on ground floor. selective structural strengthening work.Details
renovate rooms down. remodel master bathroom, convert office to bedroom. add laundry closet, add integral stair, move cabinet in kitchen on second floor. addition of 280 sf habitable area on ground floor. selective structural strengthening work. | $75,000 |
| Jun 2, 2016 | Completed final sign-off Jun 2016 | 4626 17th St | revision to pa #2015 1014 9652: add deck to landing, deck to be less than 30" above grae. (permit required per note on job card of pa# 2015 1014 9652)Details
revision to pa #2015 1014 9652: add deck to landing, deck to be less than 30" above grae. (permit required per note on job card of pa# 2015 1014 9652) | $2,500 |
| May 19, 2016 | Completed final sign-off Nov 2016 | 3315 Cesar Chavez St | revision to 2016 0304 1279: revise column to steel from lvl. revise rear deck maher naDetails
revision to 2016 0304 1279: revise column to steel from lvl. revise rear deck maher na | $5,000 |
| Apr 1, 2016 | Completed final sign-off Dec 2016 | 2107 28th Av | downstairs room - reconfigure to create new bedroom - to replace (e), game room, new bathroom - to replace (e), wine storage and mechanical roomDetails
downstairs room - reconfigure to create new bedroom - to replace (e), game room, new bathroom - to replace (e), wine storage and mechanical room | $120,000 |
| Mar 4, 2016 | Completed final sign-off Nov 2016 | 3315 Cesar Chavez St | remodel kitchen. new rear deck. n/a for maherDetails
remodel kitchen. new rear deck. n/a for maher | $60,000 |
| Mar 1, 2016 | Completed final sign-off May 2016 | 1458 Haight St | revision to appl #201601147092 - adding electrical page.Details
revision to appl #201601147092 - adding electrical page. | |
| Jan 14, 2016 | Completed final sign-off May 2016 | 1458 Haight St | tenant improvement - new fixtures to finishes. new dressing roomsDetails
tenant improvement - new fixtures to finishes. new dressing rooms | $55,000 |
| Jan 13, 2016 | Completed final sign-off Mar 2016 | 105 Banks St | partial kitchen remodel: refurbish cabinets, replace flooring, add led lighting, no new cabinets, no new tops, no new fixtures.Details
partial kitchen remodel: refurbish cabinets, replace flooring, add led lighting, no new cabinets, no new tops, no new fixtures. | $10,000 |
| Dec 29, 2015 | Completed final sign-off May 2016 | 1458 Haight St | remove/relocate existing dressing room walls. remove portion of existing mezzanine. demo only - non structural wall only. separate ti permit. ab-017 applies.Details
remove/relocate existing dressing room walls. remove portion of existing mezzanine. demo only - non structural wall only. separate ti permit. ab-017 applies. | $5,000 |
| Dec 14, 2015 | Completed final sign-off Apr 2016 | 1801 Diamond St | remodel kitchen; remove wall in kitchen & add 2 beams & 1 shear wallDetails
remodel kitchen; remove wall in kitchen & add 2 beams & 1 shear wall | $20,000 |
| Nov 23, 2015 | Never finaled issued Nov 2015, no final | 2107 28th Av | exploratory demolition on groundfloor. remove wall and ceiling finishes to observe framing mechanical systems. dig exploratoey holes to determine foundation depth.Details
exploratory demolition on groundfloor. remove wall and ceiling finishes to observe framing mechanical systems. dig exploratoey holes to determine foundation depth. | $500 |
| Oct 19, 2015 | Completed final sign-off Dec 2015 | 2334 Pine St | install new sliding glass door to replace (e) doorDetails
install new sliding glass door to replace (e) door | $3,000 |
| Oct 14, 2015 | Completed final sign-off Jun 2016 | 4626 17th St | add door, landing, and stair to grade at rear less than 30" above grade, replace 5 kitchen cabinets, provide new tankless water heater, provide new lighting.Details
add door, landing, and stair to grade at rear less than 30" above grade, replace 5 kitchen cabinets, provide new tankless water heater, provide new lighting. | $15,000 |
| Aug 25, 2015 | Completed final sign-off Dec 2015 | 1650 Jackson St | unit #506: remodel kitchen - new cabinets, tops & fixtures. remodel bath - new tile, vanity and fixtures. no structural work. no exterior workDetails
unit #506: remodel kitchen - new cabinets, tops & fixtures. remodel bath - new tile, vanity and fixtures. no structural work. no exterior work | $25,000 |
| Aug 20, 2015 | Completed final sign-off Jan 2016 | 4316 26th St | remodel 2nd flr bath, new tile, new cabinets, new plumbing fixtures, no structural work/no wall modification.Details
remodel 2nd flr bath, new tile, new cabinets, new plumbing fixtures, no structural work/no wall modification. | $15,000 |
| Aug 20, 2015 | Completed final sign-off Jul 2018 | 954 Chenery St | replace (e) foundation. boldt (e) 1st fl. framing to new foundtion. add new 3rdflr above (e) 2nd flr. provide 3 new bedrms, 2 baths, closets, flat roof. provide 3 new shear walls from foundation to new roof. open kitchen-dining wall, provide new posts, beam, footing. open 1st fl. bedroom-hall nonDetails
replace (e) foundation. boldt (e) 1st fl. framing to new foundtion. add new 3rdflr above (e) 2nd flr. provide 3 new bedrms, 2 baths, closets, flat roof. provide 3 new shear walls from foundation to new roof. open kitchen-dining wall, provide new posts, beam, footing. open 1st fl. bedroom-hall non | $200,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2017 | 442 Staples Av | legalize in-law unit per ordinance #43-14 lower slab remodel bath & kitchen with great room.Details
legalize in-law unit per ordinance #43-14 lower slab remodel bath & kitchen with great room. | $90,000 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 2025 O'farrell St | comply with physical inspection report #cc-7832Details
comply with physical inspection report #cc-7832 | $20,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 1230 Mason St | provide exit path from rear stairs to public way. garage to revert to last authorized use for 2 car parking per pa#200807015804. legalization of existing steel beams at the ground floor.Details
provide exit path from rear stairs to public way. garage to revert to last authorized use for 2 car parking per pa#200807015804. legalization of existing steel beams at the ground floor. | $20,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2016 | 1119 Broderick St | new basement retaining wall to expand existing walkway.Details
new basement retaining wall to expand existing walkway. | $7,500 |
| Jul 10, 2015 | Completed final sign-off Sep 2015 | 43 Prospect Av | remove an existing metal spiral stairway and replace it with a new wood stairDetails
remove an existing metal spiral stairway and replace it with a new wood stair | $15,000 |
| Jun 29, 2015 | Never finaled issued Jun 2015, no final | 1940 Sacramento St | partial kitchen remodel: new base cabinets and countertops. partial master bath remodel - new tile floor and lavy. add laundry in den closet new lights in living room. n/a maher ord. # 155-13Details
partial kitchen remodel: new base cabinets and countertops. partial master bath remodel - new tile floor and lavy. add laundry in den closet new lights in living room. n/a maher ord. # 155-13 | $25,000 |
| Jun 29, 2015 | Completed final sign-off Oct 2015 | 1998 08th Av | replace kitchen window - not visible from street. windows is inkind.Details
replace kitchen window - not visible from street. windows is inkind. | $3,500 |
| Jun 26, 2015 | Completed final sign-off Dec 2015 | 1940 Sacramento St | add skylight at entry hall, add solar tube at bathroom maher not reqDetails
add skylight at entry hall, add solar tube at bathroom maher not req | $5,000 |
| Jun 10, 2015 | Completed final sign-off Jun 2016 | 551 Eureka St | alter ceiling in bedroom. revision to app#201502037393Details
alter ceiling in bedroom. revision to app#201502037393 | $3,500 |
| May 26, 2015 | Completed final sign-off Oct 2015 | 1119 Broderick St | remodel kitchen - no walls moving add laundry hook ups in storage area under stairs.Details
remodel kitchen - no walls moving add laundry hook ups in storage area under stairs. | |
| Apr 27, 2015 | Completed final sign-off Jul 2015 | 453 Dolores St | replace beam over garage door with steel beam and posts. add footing under new posts. new belt drive for garage doorDetails
replace beam over garage door with steel beam and posts. add footing under new posts. new belt drive for garage door | $5,000 |
| Mar 24, 2015 | Completed final sign-off Mar 2016 | 14 Macondray Ln | remove (e) factory built wood burning fire place from lower unit, remove chimney, close openigns in floor & roof,install book case where fire place is being removed,provide 1-hr assembly bet units where chimney removed.Details
remove (e) factory built wood burning fire place from lower unit, remove chimney, close openigns in floor & roof,install book case where fire place is being removed,provide 1-hr assembly bet units where chimney removed. | $1,000 |
| Mar 3, 2015 | Completed final sign-off Sep 2016 | 200 Stillings Av | remodel (e) bedroom and bath, replace (e) stairway with new code compliant and relocate extg laundry, repair dryrot at (e) deck and railing.Details
remodel (e) bedroom and bath, replace (e) stairway with new code compliant and relocate extg laundry, repair dryrot at (e) deck and railing. | $85,000 |
| Feb 26, 2015 | Completed final sign-off May 2015 | 43 Ellert St | top level floor unit 45 : remodel kitchen and 2 bathts, middle level unit 43: remodel kitchen and 1 bath. no change in layout and openings. replace lighting with high eff.Details
top level floor unit 45 : remodel kitchen and 2 bathts, middle level unit 43: remodel kitchen and 1 bath. no change in layout and openings. replace lighting with high eff. | $75,000 |
| Feb 24, 2015 | Completed final sign-off Oct 2015 | 2694 23rd Av | legalizing 2 bedrooms and 1 bathroom on 1st flr. relocate laundry rom. replace windows at bedrooms and new bath with wood windows - size for size.Details
legalizing 2 bedrooms and 1 bathroom on 1st flr. relocate laundry rom. replace windows at bedrooms and new bath with wood windows - size for size. | $80,000 |
| Feb 3, 2015 | Completed final sign-off Jun 2016 | 551 Eureka St | add bedroom, bath, laundry, storage at first floor. remodel kitchen, dining room, powder room. replace deck at 2nd floor. remodel bath and closets at 3rd floor.Details
add bedroom, bath, laundry, storage at first floor. remodel kitchen, dining room, powder room. replace deck at 2nd floor. remodel bath and closets at 3rd floor. | $225,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 1168 Page St | shear wall at first floor. add one beam at 3rd floor. replace siding at rear of house not visible from street.Details
shear wall at first floor. add one beam at 3rd floor. replace siding at rear of house not visible from street. | $25,000 |
| Jan 5, 2015 | Completed final sign-off Jan 2015 | 1601 Florida St | voluntary sill bolts & plywood sheathing installion an crawl space; install 5/8" anchor bolts @ 48" centers & 1/2" plywood on cripple wall at precita st side; install 5/8" anchor bolts @ 48" max spacing, 1/2" plywood & 2 holdowns on florida st side open exterior open stud wall.Details
voluntary sill bolts & plywood sheathing installion an crawl space; install 5/8" anchor bolts @ 48" centers & 1/2" plywood on cripple wall at precita st side; install 5/8" anchor bolts @ 48" max spacing, 1/2" plywood & 2 holdowns on florida st side open exterior open stud wall. | $2,500 |
| Dec 8, 2014 | Completed final sign-off Mar 2015 | 551 Eureka St | exploratory work - 1/f / g/f; remove t-bar ceiling tiles to see framing. ; open some walls to see utilities. dig pits to find foundation depth.Details
exploratory work - 1/f / g/f; remove t-bar ceiling tiles to see framing. ; open some walls to see utilities. dig pits to find foundation depth. | $1,000 |
| Oct 24, 2014 | Completed final sign-off Oct 2015 | 1168 Page St | add bedroom in former storage area. remodel bedroom, bathroom, add laundry at 1st fl. remodel kitchen to great room on 2nd fl. rear stairs, doors, windows. no envelope expansion. no work visible from street.Details
add bedroom in former storage area. remodel bedroom, bathroom, add laundry at 1st fl. remodel kitchen to great room on 2nd fl. rear stairs, doors, windows. no envelope expansion. no work visible from street. | $50,000 |
| Aug 26, 2014 | Completed final sign-off Nov 2014 | 672 Lisbon St | renovate one wall to add a closet. renovate kitchen.Details
renovate one wall to add a closet. renovate kitchen. | $20,000 |
| Aug 25, 2014 | Completed final sign-off Jan 2015 | 5001 Diamond Heights Bl | to complete work & obtain final inspection for work approved under pa#2012-08-23-8123.Details
to complete work & obtain final inspection for work approved under pa#2012-08-23-8123. | $2,000 |
| Aug 19, 2014 | Expired or cancelled withdrawn Jan 2015 | 912 Steiner St | refurbish 1st fl rooms. half bath only, on ground floor. no building expansion.Details
refurbish 1st fl rooms. half bath only, on ground floor. no building expansion. | $40,000 |
| Aug 19, 2014 | Completed final sign-off Dec 2014 | 244 Downey St | voluntary structural upgrade to extg beam. 5 new column footings.Details
voluntary structural upgrade to extg beam. 5 new column footings. | $15,000 |
| Jul 30, 2014 | Completed final sign-off Nov 2014 | 1531 Noe St | remodel one bath - convert tub to shower. new tile, new cabinets & new fixtures. non structural.Details
remodel one bath - convert tub to shower. new tile, new cabinets & new fixtures. non structural. | $10,000 |
| Jul 11, 2014 | Completed final sign-off Dec 2014 | 912 Steiner St | voluntary strengthing on 1st fl. beam on 2nd fl post and footing on 1st fl. add laundry on 3rd fl. add closet at master bedroom 3rd floorDetails
voluntary strengthing on 1st fl. beam on 2nd fl post and footing on 1st fl. add laundry on 3rd fl. add closet at master bedroom 3rd floor | $50,000 |
| Jul 9, 2014 | Completed final sign-off Sep 2014 | 310 Diamond St | remodel ground floor bathroom - change tub to shower, new tile, new fixtures.Details
remodel ground floor bathroom - change tub to shower, new tile, new fixtures. | $9,037 |
| Jun 11, 2014 | Completed final sign-off Nov 2014 | 283 Surrey St | replace one window at rear of bldg. legalize existing deck/covered patio.Details
replace one window at rear of bldg. legalize existing deck/covered patio. | $40,000 |
| May 15, 2014 | Completed final sign-off Nov 2014 | 310 Diamond St | replace front stairs in same location/configuration.Details
replace front stairs in same location/configuration. | $10,000 |
| May 9, 2014 | Completed final sign-off Sep 2014 | 2694 23rd Av | replace windows at 14 locations with wood windows - pella architectural series. u value .40Details
replace windows at 14 locations with wood windows - pella architectural series. u value .40 | $12,000 |
| May 9, 2014 | Completed final sign-off Oct 2014 | 2694 23rd Av | remodle top floor bathroom - keep tub, new tiels, new pedestal sink. to comply with cec15(k) 10Details
remodle top floor bathroom - keep tub, new tiels, new pedestal sink. to comply with cec15(k) 10 | $12,000 |
| Mar 11, 2014 | Completed final sign-off Oct 2014 | 357 Allison St | add rooms at 1st floor down - 2 bedrooms, 1 bath, 1 laundry.Details
add rooms at 1st floor down - 2 bedrooms, 1 bath, 1 laundry. | $50,000 |
| Feb 3, 2014 | Completed final sign-off Feb 2014 | 436 Edinburgh St | replace upper flight only at rear stairs in kind.Details
replace upper flight only at rear stairs in kind. | $3,500 |
| Jan 29, 2014 | Completed final sign-off Mar 2014 | 920 Faxon Av | increase valuation of scope of work by $30,000 on pa 201401136142, this increase will reflect the proper value of the workDetails
increase valuation of scope of work by $30,000 on pa 201401136142, this increase will reflect the proper value of the work | $30,000 |
| Jan 22, 2014 | Completed final sign-off Feb 2014 | 47 Clifford Tr | add attic access ladder. add skylight in bathroom. not visible from street. add solar attic fanDetails
add attic access ladder. add skylight in bathroom. not visible from street. add solar attic fan | $4,000 |
| Jan 13, 2014 | Completed final sign-off Mar 2014 | 920 Faxon Av | new slab in garage. new insulation and drywall in garage. new closet in garage. replace garage door with 6" wider doorDetails
new slab in garage. new insulation and drywall in garage. new closet in garage. replace garage door with 6" wider door | $20,000 |
| Jan 3, 2014 | Never finaled issued Jan 2014, no final | 1255 Shrader St | replace one 6x12 rotted beam at rear of properly with 6x12 pressure treated beam - in-kind. 9503832 - original permit.Details
replace one 6x12 rotted beam at rear of properly with 6x12 pressure treated beam - in-kind. 9503832 - original permit. | $950 |
| Nov 21, 2013 | Expired or cancelled expired Jan 2017 | 1611 Lyon St | convert an existing rear-yard deck into a 3 story addition to house a new residential elevator.Details
convert an existing rear-yard deck into a 3 story addition to house a new residential elevator. | $50,000 |
| Nov 21, 2013 | Completed final sign-off Jan 2014 | 2345 Green St | provide new foundation anchor bolts. add new plywood and holdowns at ground floor. provide connectors top and bottom of centerline posts.Details
provide new foundation anchor bolts. add new plywood and holdowns at ground floor. provide connectors top and bottom of centerline posts. | $7,200 |
| Nov 21, 2013 | Completed final sign-off Jan 2014 | 230 20th Av | rear deck and stairs. french door. 2 replacement windows.Details
rear deck and stairs. french door. 2 replacement windows. | $15,000 |
| Nov 5, 2013 | Completed final sign-off Dec 2013 | 142 Clearfield Dr | replace shower pan and bottom tile at upper bath. replace shower stall with bathtub at lower bath with new toilet, vanity and resilient flooring. no wall changes - no exterior work.Details
replace shower pan and bottom tile at upper bath. replace shower stall with bathtub at lower bath with new toilet, vanity and resilient flooring. no wall changes - no exterior work. | $11,000 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 48 Yukon St | to obtain final inspection for work approved under pa 200106201967. all work is complete. cfc requiredDetails
to obtain final inspection for work approved under pa 200106201967. all work is complete. cfc required | |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 48 Yukon St | to obtain final inppection for work approved under pa 200208123765. all work is completeDetails
to obtain final inppection for work approved under pa 200208123765. all work is complete | |
| Jul 5, 2013 | Completed final sign-off Dec 2013 | 892 Ashbury St | add spiral convenience stair from 1st to basement. remove portion of floor & framing @ first floor dining room; frame new stairwell; add code compliant 5'0" spiral stair for convenience access; replace furnace and water heaters; add furnace at basement dwelling unit.Details
add spiral convenience stair from 1st to basement. remove portion of floor & framing @ first floor dining room; frame new stairwell; add code compliant 5'0" spiral stair for convenience access; replace furnace and water heaters; add furnace at basement dwelling unit. | $10,000 |
| Jun 25, 2013 | Completed final sign-off Sep 2013 | 112 Eastwood Dr | partial bath remodel change tub to tile showerDetails
partial bath remodel change tub to tile shower | $5,000 |
| Apr 23, 2013 | Completed final sign-off Jun 2013 | 47 Arroyo Wy | remodel hall bath new tile, new fixtures, same location on main level vacancy light switches.Details
remodel hall bath new tile, new fixtures, same location on main level vacancy light switches. | $10,000 |
| Apr 23, 2013 | Completed final sign-off Jul 2013 | 768 Dartmouth St | remodel bath new tile, new fixtures, same location, vacancy light switches.Details
remodel bath new tile, new fixtures, same location, vacancy light switches. | $10,000 |
| Mar 5, 2013 | Completed final sign-off Jan 2015 | 5001 Diamond Heights Bl | revision to appl #2012.0823.8123 - install gas fireplace.Details
revision to appl #2012.0823.8123 - install gas fireplace. | $2,500 |
| Feb 22, 2013 | Completed final sign-off Oct 2013 | 793 Cole St | remodel kitchen with new partition, remodel bath to powder room, remodel 2 hall closets.Details
remodel kitchen with new partition, remodel bath to powder room, remodel 2 hall closets. | $40,000 |
| Feb 22, 2013 | Completed final sign-off Apr 2013 | 232 Hugo St | partial kitchen remodel-replace cabinets & countertop. no structural workDetails
partial kitchen remodel-replace cabinets & countertop. no structural work | $11,000 |
| Feb 4, 2013 | Completed final sign-off Oct 2014 | 53 Delano Av | remodel 1st floor kitchen, nook, bath, add laundry. replace rear stair to grade. enlarge deckDetails
remodel 1st floor kitchen, nook, bath, add laundry. replace rear stair to grade. enlarge deck | $20,000 |
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 520 Greenwich St | replace kitchen bavinets & coutner tops at 2 walls, partial remodeling no sturctural work no wall changes, no exterior work.Details
replace kitchen bavinets & coutner tops at 2 walls, partial remodeling no sturctural work no wall changes, no exterior work. | $10,000 |
| Dec 5, 2012 | Completed final sign-off Feb 2013 | 292 Surrey St | rot repair, replace front stairs, more than 50%. replace in kind with wood.Details
rot repair, replace front stairs, more than 50%. replace in kind with wood. | $4,500 |
| Oct 5, 2012 | Completed final sign-off Oct 2012 | 25 Madison St | voluntary strenthening at (4) locations in garagae. add l50 clps at top of walls at 16" o.c. provide 1/2" struc 1 plywood nailed 4"oc edges, 12" oc field. change anchor bolt washers to 3" plate washers.Details
voluntary strenthening at (4) locations in garagae. add l50 clps at top of walls at 16" o.c. provide 1/2" struc 1 plywood nailed 4"oc edges, 12" oc field. change anchor bolt washers to 3" plate washers. | $2,000 |
| Aug 23, 2012 | Never finaled issued Aug 2012, no final | 5001 Diamond Heights Bl | remodel 1st floor, new partitions for bedroom, bath, dressing room, hall, laundry. no exterior workDetails
remodel 1st floor, new partitions for bedroom, bath, dressing room, hall, laundry. no exterior work | $25,000 |
| Aug 17, 2012 | Completed final sign-off Aug 2013 | 645 03rd Av | interior adjustment of rear garage wall to allow for 20 foot garage depth. add "fill in" space at rear of garage/storage area for office/guest room use.replace (e) windows to rear yard with double pane sliding door and window.Details
interior adjustment of rear garage wall to allow for 20 foot garage depth. add "fill in" space at rear of garage/storage area for office/guest room use.replace (e) windows to rear yard with double pane sliding door and window. | $30,000 |
| Jul 24, 2012 | Completed final sign-off Oct 2012 | 289 Surrey St | repair rot at rear decks - less than 50%, replace in kind - same footprint. structural members same size or better.Details
repair rot at rear decks - less than 50%, replace in kind - same footprint. structural members same size or better. | $2,500 |
| Jun 7, 2012 | Completed final sign-off Nov 2012 | 457 Dellbrook Av | remodel gound level: add office, bedroom/family room, bathroom, wet bar. all work at 1st floor.Details
remodel gound level: add office, bedroom/family room, bathroom, wet bar. all work at 1st floor. | $25,000 |
| May 25, 2012 | Completed final sign-off Jun 2012 | 140 Seville St | voluntary strengthening @ garage. (2) 12' sidewalls with 5/8" anchorblts epoxied 9" embeddmt @ 36" o.c. & 3" sq plate washers, struc 1ply w 10d nails 6" o.c. edge 12" o.c. field a35 top clips 16" oc. 6' front wall, 12' rear wall w/ anchorbolts 16"oc. 10d nails 3"edge, 12" field,a35 clips at12"ocDetails
voluntary strengthening @ garage. (2) 12' sidewalls with 5/8" anchorblts epoxied 9" embeddmt @ 36" o.c. & 3" sq plate washers, struc 1ply w 10d nails 6" o.c. edge 12" o.c. field a35 top clips 16" oc. 6' front wall, 12' rear wall w/ anchorbolts 16"oc. 10d nails 3"edge, 12" field,a35 clips at12"oc | $3,500 |
| May 9, 2012 | Completed final sign-off Aug 2012 | 354 Sussex St | 2nd floor (main level)-remodel kitchen-new cabinets, countertops, appliances, hardwood floors. replace door & window, not visible from the street. replace skylightDetails
2nd floor (main level)-remodel kitchen-new cabinets, countertops, appliances, hardwood floors. replace door & window, not visible from the street. replace skylight | $20,000 |
| Apr 27, 2012 | Completed final sign-off May 2012 | 3768 23rd St | voluntary strengthening at 4 locations in garage, add 5/8" anchor bolts in epoxy with 7" embeddment and 3" plate washers and nuts. add l50 clips at top of walls @ 16"o.c. install 1/2" truc 1 plywood with 4" o.c. edge and 12" o.c. field nailing.Details
voluntary strengthening at 4 locations in garage, add 5/8" anchor bolts in epoxy with 7" embeddment and 3" plate washers and nuts. add l50 clips at top of walls @ 16"o.c. install 1/2" truc 1 plywood with 4" o.c. edge and 12" o.c. field nailing. | $2,000 |
| Mar 13, 2012 | Completed final sign-off Feb 2013 | 567 Mangels Av | add 1 bathroom, legalize 1 bedroom, office and closet on ground floor. house will be 3 bedrooms and 2 bathrooms.Details
add 1 bathroom, legalize 1 bedroom, office and closet on ground floor. house will be 3 bedrooms and 2 bathrooms. | $15,000 |
| Jan 31, 2012 | Completed final sign-off Apr 2012 | 19 Edith St | remodel master bath - new cabinets, fixtures, tile flourescents. no change on walls and openings. partial kitchen remodel - 2 new cabinets - remove fireplace, new sink.Details
remodel master bath - new cabinets, fixtures, tile flourescents. no change on walls and openings. partial kitchen remodel - 2 new cabinets - remove fireplace, new sink. | $25,000 |
| Jan 30, 2012 | Never finaled issued Jan 2012, no final | 559 Teresita Bl | legalize extg atrium. posts and beams. add new entry hall and laundry. add storage partitions and doors. total habitable space 237 sq ft/new total 2102 s. feetDetails
legalize extg atrium. posts and beams. add new entry hall and laundry. add storage partitions and doors. total habitable space 237 sq ft/new total 2102 s. feet | $20,000 |
| Jan 25, 2012 | Completed final sign-off Mar 2012 | 1015 Lake St | add led lighting to studio ceiling (12) recessed fixtures. replace ceiling with 5/8" type x drywall. replace bathroom vanity top - new laminate top.Details
add led lighting to studio ceiling (12) recessed fixtures. replace ceiling with 5/8" type x drywall. replace bathroom vanity top - new laminate top. | $7,500 |
| Jan 13, 2012 | Completed final sign-off Jan 2013 | 559 Teresita Bl | comply with nov complaint #201081986. remove kitchen. take out countertop. cap off plumbing and patch walls. revert to single family.remove kitchen and cabinets and electical.Details
comply with nov complaint #201081986. remove kitchen. take out countertop. cap off plumbing and patch walls. revert to single family.remove kitchen and cabinets and electical. | $3,000 |
| Oct 26, 2011 | Completed final sign-off Feb 2012 | 3681 24th St | remodel kitchen, new cabinets, countertop. new led lighting. no structural work.Details
remodel kitchen, new cabinets, countertop. new led lighting. no structural work. | $19,000 |