Vk Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Jun 2026
- Last 24 months
- 2 permits filed
91 permits since 2000: 58 completed, 5 in progress, 17 never finaled, 11 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 9 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
7 stairs permits: 3 completed, 4 never finaled. Typically 5 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2023 | Never finaled issued Jul 2023, no final | 212 Prentiss St | repair front stairs - less than 50%: replace first step with concrete, attach stringers to concrete.Details
repair front stairs - less than 50%: replace first step with concrete, attach stringers to concrete. | $10,000 |
| Apr 15, 2022 | Never finaled issued Jul 2022, no final | 1627 Beach St | add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1.Details
add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1. | $200,000 |
| Dec 18, 2020 | Completed final sign-off Dec 2021 | 350 Madrid St | repair front stairs - dry rot. less than 50% in-kind replacementDetails
repair front stairs - dry rot. less than 50% in-kind replacement | $6,500 |
| Oct 11, 2018 | Completed final sign-off Apr 2019 | 200 Green St | add fire rated security door and replace stair door at 2nd fl. with fire rated door. accessibility upgradesDetails
add fire rated security door and replace stair door at 2nd fl. with fire rated door. accessibility upgrades | $14,765 |
| Nov 17, 2016 | Never finaled issued Nov 2016, no final | 1320 Portola Dr | replace (e) dry rot stairs in kindDetails
replace (e) dry rot stairs in kind | $12,000 |
| Nov 23, 2015 | Completed final sign-off Aug 2016 | 2169 Green St | rebuild (e) dryrot entrance stairs in kind. work in common area. n/a maher ordinance.Details
rebuild (e) dryrot entrance stairs in kind. work in common area. n/a maher ordinance. | $12,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 1052 Filbert St | repair extg damage structure at basement at basement/sub-basement floor. rebuild/repair rear bldg. rebuild stairs without having to comply with current codeDetails
repair extg damage structure at basement at basement/sub-basement floor. rebuild/repair rear bldg. rebuild stairs without having to comply with current code | $160,000 |