Back to bathroom remodel contractors
Vk Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Jun 2026
- Last 24 months
- 2 permits filed
91 permits since 2000: 58 completed, 5 in progress, 17 never finaled, 11 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 9 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 12 completed, 3 in progress, 6 never finaled. Typically 1 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2024 | In progress filed Sep 2024, not yet issued | 85 Yerba Buena Av | proposed remodel for existing 2 bathrooms @ 2nd flDetails
proposed remodel for existing 2 bathrooms @ 2nd fl | $50,000 |
| Dec 21, 2023 | In progress issued Jan 2024 | 464 Duncan St | revision to 202310118414 remodeling (e) kitchen and bathroom; change layout of full bath room @ 2nd fl; remodeling (e) bathroom @ 1st fl. add a sauna roomDetails
revision to 202310118414 remodeling (e) kitchen and bathroom; change layout of full bath room @ 2nd fl; remodeling (e) bathroom @ 1st fl. add a sauna room | $10,000 |
| Oct 11, 2023 | In progress issued Oct 2023 | 464 Duncan St | remodeling (e) kitchen and bathroom, add a full bathroom @ 2/f.Details
remodeling (e) kitchen and bathroom, add a full bathroom @ 2/f. | $80,000 |
| Aug 1, 2023 | Completed final sign-off Feb 2024 | 2280 Cecilia Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |
| Apr 15, 2022 | Never finaled issued Jul 2022, no final | 1627 Beach St | add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1.Details
add family room, den, bathroom and laundry room to ground fl. renovate kitchen & bathroom on level 1. add internal stair connecting ground floor & level 1. | $200,000 |
| Apr 6, 2021 | Never finaled issued Apr 2021, no final | 1638 Quint St | recommencement and completion of work approved under permit application# 201807275742. 50% of work remaining. unit legalization: ordinance 43-14: (1 bedroom and 1 bathroom)Details
recommencement and completion of work approved under permit application# 201807275742. 50% of work remaining. unit legalization: ordinance 43-14: (1 bedroom and 1 bathroom) | $65,000 |
| Nov 6, 2020 | Never finaled issued Mar 2021, no final | 1629 Beach St | renovation of (e) unit in a two unit condo bldg. no vertical or horizontal additions. renovation of kitchen & relocation of master bathroom.Details
renovation of (e) unit in a two unit condo bldg. no vertical or horizontal additions. renovation of kitchen & relocation of master bathroom. | $70,000 |
| Dec 21, 2018 | Completed final sign-off Jun 2019 | 22 Littlefield Tr | new bath room at 2nd floor, relocated water heaterDetails
new bath room at 2nd floor, relocated water heater | $20,000 |
| Oct 11, 2018 | Completed final sign-off May 2019 | 545 Pacific Av | revision to pa#201808167604 move location of sink in bathroom.Details
revision to pa#201808167604 move location of sink in bathroom. | |
| Aug 16, 2018 | Completed final sign-off May 2019 | 545 Pacific Av | commercial office ti - remove 2 partition walls, move kitchen, renovate bathroom to meet adaDetails
commercial office ti - remove 2 partition walls, move kitchen, renovate bathroom to meet ada | $50,000 |
| Jul 27, 2018 | Never finaled issued Jan 2019, no final | 1638 Quint St | unit legalization per ord# 43-14 @ 1st flr w/ 1 bedroom and 1 bath.Details
unit legalization per ord# 43-14 @ 1st flr w/ 1 bedroom and 1 bath. | $40,000 |
| Feb 22, 2016 | Completed final sign-off Aug 2016 | 184 Pixley St | remodel bathroom, change existing kitchen to be laundry room and dining room to be kitchen.Details
remodel bathroom, change existing kitchen to be laundry room and dining room to be kitchen. | $18,000 |
| Jun 1, 2015 | Completed final sign-off Oct 2015 | 2169 Green St | to comply with complaint: 201548151 - proposed change of (e) storage room to laundry room and half bath at basement level of apt #2. maher naDetails
to comply with complaint: 201548151 - proposed change of (e) storage room to laundry room and half bath at basement level of apt #2. maher na | $8,500 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 112 Westwood Dr | first flr: repair existing foundation, second floor: remodeling existing bathroom.Details
first flr: repair existing foundation, second floor: remodeling existing bathroom. | $28,000 |
| Jul 1, 2014 | Never finaled issued Jul 2014, no final | 1056 Filbert St | scope of work , remodeling kitchen & bathroom new sheetrock , kitchen cabinets,countertops sink & painting, bathroom sheet rock ,tile ,toilet vanity & shower, no wall alterations or loction of fixtures.Details
scope of work , remodeling kitchen & bathroom new sheetrock , kitchen cabinets,countertops sink & painting, bathroom sheet rock ,tile ,toilet vanity & shower, no wall alterations or loction of fixtures. | $20,000 |
| Feb 1, 2013 | Completed final sign-off May 2013 | 630 Brussels St | scope of work: bathrooms remodeling:replace toilet , shower stall, and install new sheetrock. location of items listed will not change. lighting shall comply with t-24Details
scope of work: bathrooms remodeling:replace toilet , shower stall, and install new sheetrock. location of items listed will not change. lighting shall comply with t-24 | $12,000 |
| Aug 28, 2012 | Completed final sign-off Dec 2012 | 1908 16th Av | remodel bathroom -replace ceiling and walls, new sinkDetails
remodel bathroom -replace ceiling and walls, new sink | $8,000 |
| Mar 5, 2012 | Completed final sign-off May 2012 | 186 Pixley St | remodeling (e) kitchen & bathroom at 2nd floorDetails
remodeling (e) kitchen & bathroom at 2nd floor | $20,000 |
| Dec 6, 2010 | Completed final sign-off Aug 2011 | 1414 Santiago St | complete remodel of bathroom with architect drawings, no moving or adding wallsDetails
complete remodel of bathroom with architect drawings, no moving or adding walls | $10,000 |
| Oct 27, 2009 | Completed final sign-off Dec 2009 | 50 Linda St | bathroom remodel. demo plaster & sheet rock. exchange sink, toilet and window in same opening. re-use same claw foot tub. all fixtures will remain in same location.Details
bathroom remodel. demo plaster & sheet rock. exchange sink, toilet and window in same opening. re-use same claw foot tub. all fixtures will remain in same location. | $10,000 |
| Mar 25, 2005 | Completed final sign-off Aug 2005 | 409 Clipper St | replace tub, toilet, sink, tile in bathroom on 2nd floorDetails
replace tub, toilet, sink, tile in bathroom on 2nd floor | $10,000 |