Vincent Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Nov 2023
- Last 24 months
- 0 permits filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2023 | Completed final sign-off Dec 2023 | 424 Union St | replace dryrot woods less than 50% at second exit stair at the back of the building. not visible from street.-rearDetails
replace dryrot woods less than 50% at second exit stair at the back of the building. not visible from street.-rear | $1,450 |
| Aug 22, 2016 | Completed final sign-off Feb 2017 | 3530 Lawton St | in-fill one bedroom under (e) sun room, construct one bedroom, two full bathroom, laundry room & legalize one bedroom at ground floor, construct new deck with staircase at rear of building, (approx. 14'x6')Details
in-fill one bedroom under (e) sun room, construct one bedroom, two full bathroom, laundry room & legalize one bedroom at ground floor, construct new deck with staircase at rear of building, (approx. 14'x6') | $60,000 |
| Jul 16, 2013 | Completed final sign-off Nov 2013 | 150 Merced Av | new deck and stair to replace extg damaged extg deck. no change to extg building.Details
new deck and stair to replace extg damaged extg deck. no change to extg building. | $9,000 |
| Nov 15, 2011 | Completed final sign-off Apr 2012 | 107 27th Av | cover with drywall below top front entrance stairs. min 5/8" type "x" sheetrock.Details
cover with drywall below top front entrance stairs. min 5/8" type "x" sheetrock. | $150 |
| Sep 14, 2007 | Completed final sign-off May 2008 | 1678 47th Av | proposed room remodeling on ground/first floor and 2nd floor including (n) bathroom, bedroom, (n) window, relocation of interior stairs ,a nd (n) stucco on front facade.Details
proposed room remodeling on ground/first floor and 2nd floor including (n) bathroom, bedroom, (n) window, relocation of interior stairs ,a nd (n) stucco on front facade. | $50,000 |
| Jan 21, 2005 | Completed final sign-off Mar 2005 | 2586 29th Av | replace extg front entry stair in extg location with concreteDetails
replace extg front entry stair in extg location with concrete | $5,000 |