Back to kitchen remodel contractors
Vincent Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Nov 2023
- Last 24 months
- 0 permits filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 18 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2017 | Completed final sign-off May 2018 | 2733 Noriega St | construct 2 bedroom and 2 full bathroom at ground level. remodel (e) kitchen. convert 1 (e) bath to 2 bath upgrade partial at 2nd flrDetails
construct 2 bedroom and 2 full bathroom at ground level. remodel (e) kitchen. convert 1 (e) bath to 2 bath upgrade partial at 2nd flr | $78,000 |
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 1975 29th Av | remodel bathroom & kitchen. bathtub, vanity & toilet, high efficacy lights. kitchen cabinets.Details
remodel bathroom & kitchen. bathtub, vanity & toilet, high efficacy lights. kitchen cabinets. | $15,000 |
| Oct 25, 2010 | Completed final sign-off May 2011 | 150 Merced Av | revision to permit app#201009231520. revise window location at remodeled kitchen and remove wing wall at kitchen. remove construction of 2 new footings indicated on above referenced permit application. keep extg footings.Details
revision to permit app#201009231520. revise window location at remodeled kitchen and remove wing wall at kitchen. remove construction of 2 new footings indicated on above referenced permit application. keep extg footings. | |
| Sep 23, 2010 | Completed final sign-off May 2011 | 150 Merced Av | int'l alt: 1st floor kitchen remodel, new patio door, new bd, remodel extg halfbath.2nd floor: remodel extg bath, add new master bath and closet, reduce window size in extg bath. replace all windows in kind with double pane wood.Details
int'l alt: 1st floor kitchen remodel, new patio door, new bd, remodel extg halfbath.2nd floor: remodel extg bath, add new master bath and closet, reduce window size in extg bath. replace all windows in kind with double pane wood. | $40,000 |