Back to bathroom remodel contractors
Vincent Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Nov 2023
- Last 24 months
- 0 permits filed
24 permits since 2000: 23 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2017 | Completed final sign-off May 2018 | 2733 Noriega St | construct 2 bedroom and 2 full bathroom at ground level. remodel (e) kitchen. convert 1 (e) bath to 2 bath upgrade partial at 2nd flrDetails
construct 2 bedroom and 2 full bathroom at ground level. remodel (e) kitchen. convert 1 (e) bath to 2 bath upgrade partial at 2nd flr | $78,000 |
| Aug 22, 2016 | Completed final sign-off Feb 2017 | 3530 Lawton St | in-fill one bedroom under (e) sun room, construct one bedroom, two full bathroom, laundry room & legalize one bedroom at ground floor, construct new deck with staircase at rear of building, (approx. 14'x6')Details
in-fill one bedroom under (e) sun room, construct one bedroom, two full bathroom, laundry room & legalize one bedroom at ground floor, construct new deck with staircase at rear of building, (approx. 14'x6') | $60,000 |
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 1975 29th Av | remodel bathroom & kitchen. bathtub, vanity & toilet, high efficacy lights. kitchen cabinets.Details
remodel bathroom & kitchen. bathtub, vanity & toilet, high efficacy lights. kitchen cabinets. | $15,000 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 2490 44th Av | remodel bathroom, 1 bath tub, vanity, 1 toilet, install carbon monoxide alarmDetails
remodel bathroom, 1 bath tub, vanity, 1 toilet, install carbon monoxide alarm | $5,500 |
| Sep 23, 2010 | Completed final sign-off May 2011 | 150 Merced Av | int'l alt: 1st floor kitchen remodel, new patio door, new bd, remodel extg halfbath.2nd floor: remodel extg bath, add new master bath and closet, reduce window size in extg bath. replace all windows in kind with double pane wood.Details
int'l alt: 1st floor kitchen remodel, new patio door, new bd, remodel extg halfbath.2nd floor: remodel extg bath, add new master bath and closet, reduce window size in extg bath. replace all windows in kind with double pane wood. | $40,000 |
| Apr 28, 2009 | Never finaled issued May 2009, no final | 2547 30th Av | infill under existing sunroom @ ground floor, add new bedroom & bath at ground floor.Details
infill under existing sunroom @ ground floor, add new bedroom & bath at ground floor. | $30,000 |
| Sep 14, 2007 | Completed final sign-off May 2008 | 1678 47th Av | proposed room remodeling on ground/first floor and 2nd floor including (n) bathroom, bedroom, (n) window, relocation of interior stairs ,a nd (n) stucco on front facade.Details
proposed room remodeling on ground/first floor and 2nd floor including (n) bathroom, bedroom, (n) window, relocation of interior stairs ,a nd (n) stucco on front facade. | $50,000 |
| Nov 6, 2006 | Completed final sign-off May 2007 | 1583 18th Av | remodel at the (e) g/f level, including construct a bedroom and a family room at the rear area, construct a storagee at (e0 g/f, build a full bathroom at (e) g/f as plan shown. replace the (n) furnace, (n) water & relocate washer and dryer as plan shown. replace 2 vinyl frame windows and install 3Details
remodel at the (e) g/f level, including construct a bedroom and a family room at the rear area, construct a storagee at (e0 g/f, build a full bathroom at (e) g/f as plan shown. replace the (n) furnace, (n) water & relocate washer and dryer as plan shown. replace 2 vinyl frame windows and install 3 | $24,000 |
| Mar 27, 2001 | Completed final sign-off Jun 2001 | 2030 Sloat Bl | add family room, bedroom & storage & full bath at g/floorDetails
add family room, bedroom & storage & full bath at g/floor | $15,000 |