Van Der Sterre Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2013
- Last 24 months
- 0 permits filed
135 permits since 2000: 107 completed, 14 never finaled, 14 expired or cancelled.
Of the 14 never-finaled permits, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
20 stairs permits: 18 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2012 | Completed final sign-off Nov 2014 | 105 Hoffman Av | add garage & bedrooms to an (e) basement & infill under an (e) deck. raise (e) 1st floor approx 2'-0" to accomodate the new garage slope & new stair to connect the (e) & new floors. work also includes add bath & laundry.Details
add garage & bedrooms to an (e) basement & infill under an (e) deck. raise (e) 1st floor approx 2'-0" to accomodate the new garage slope & new stair to connect the (e) & new floors. work also includes add bath & laundry. | $150,000 |
| Oct 5, 2011 | Completed final sign-off Dec 2011 | 23 Walter St | convert (e) storage space at level one into bedromm full bathroom and closet with new interior stair to level 2Details
convert (e) storage space at level one into bedromm full bathroom and closet with new interior stair to level 2 | $45,000 |
| Feb 23, 2011 | Completed final sign-off Apr 2014 | 4366 26th St | extension of ground floor towards rear yard and addition of partial 3rd level below ground level, minor renovation of kitchen, reconfiguration of deck & stairs.Details
extension of ground floor towards rear yard and addition of partial 3rd level below ground level, minor renovation of kitchen, reconfiguration of deck & stairs. | $105,000 |
| Nov 12, 2010 | Never finaled issued Nov 2010, no final | 455 27th St | replace garage & main entry stairs, replace operable sashes at (e) windows at front elevationDetails
replace garage & main entry stairs, replace operable sashes at (e) windows at front elevation | $17,400 |
| Jul 20, 2010 | Completed final sign-off Feb 2011 | 3349 Washington St | minor revision to p.a.#201002045976 including; minor change to (n) washington st. (north) door/window layout; replacement of (e) main stair skylight w/ (n) dual-glazed, flat glass unit.Details
minor revision to p.a.#201002045976 including; minor change to (n) washington st. (north) door/window layout; replacement of (e) main stair skylight w/ (n) dual-glazed, flat glass unit. | $1,500 |
| Jul 21, 2008 | Completed final sign-off Sep 2008 | 630 Oak St | repair dryrot at rear stairs. replace 2 stringers & 3-7 joists at deck/landings. less than 10% replacement/repair. no change to windows orders.Details
repair dryrot at rear stairs. replace 2 stringers & 3-7 joists at deck/landings. less than 10% replacement/repair. no change to windows orders. | $1,250 |
| Oct 4, 2007 | Completed final sign-off Dec 2008 | 168 Caselli Av | at rear bldg : remodel (e)3 story-residence w/new stair additn,new finishes,doors,windows,roof w/new gutters drainage, int. partitions to relocate bathrms,bedrms, living rm and kitchen. removal lower kitchen,consolidating both units into one single family dwelling.new hvac system.Details
at rear bldg : remodel (e)3 story-residence w/new stair additn,new finishes,doors,windows,roof w/new gutters drainage, int. partitions to relocate bathrms,bedrms, living rm and kitchen. removal lower kitchen,consolidating both units into one single family dwelling.new hvac system. | $300,000 |
| Apr 10, 2006 | Completed final sign-off Mar 2008 | 608 Elizabeth St | renovation of basement and 1st floor with new deck. 2nd story- vertical addition include 3 bedrooms and 2 bathrooms. new stair (interior) from 2nd floor to basement.Details
renovation of basement and 1st floor with new deck. 2nd story- vertical addition include 3 bedrooms and 2 bathrooms. new stair (interior) from 2nd floor to basement. | $500,000 |
| Dec 28, 2005 | Completed final sign-off Aug 2006 | 4702 03rd St | excavate as required to provide head rm at stair per struct plan revision to pa 200512130159, incl footing & framing.Details
excavate as required to provide head rm at stair per struct plan revision to pa 200512130159, incl footing & framing. | $7,750 |
| Dec 13, 2005 | Completed final sign-off Aug 2006 | 4702 03rd St | replace (e) stair to storage area w/new stair and handrails. replace several joists in kind to address rest damage to satisfy nov#200563157 (stairs) all work to be within commercial area.Details
replace (e) stair to storage area w/new stair and handrails. replace several joists in kind to address rest damage to satisfy nov#200563157 (stairs) all work to be within commercial area. | $6,950 |
| Aug 11, 2005 | Completed final sign-off Feb 2006 | 352 Coleridge St | replace (e) rear stairs and water proof deck syste. correction to bath units per 3r-4021. elec. &Details
replace (e) rear stairs and water proof deck syste. correction to bath units per 3r-4021. elec. & | $37,500 |
| Jun 10, 2005 | Completed final sign-off Jun 2005 | 1874 Filbert St | repair dryrot at lower rear stairway.replace w/ 3/12 stringers&2x10 treads.all pt. add post base....Details
repair dryrot at lower rear stairway.replace w/ 3/12 stringers&2x10 treads.all pt. add post base.... | $3,750 |
| Feb 7, 2005 | Completed final sign-off May 2005 | 150 Funston Av | rebuild & reconfiguire exist rear stairs & landings per plan reduce width of exist deck as noted.Details
rebuild & reconfiguire exist rear stairs & landings per plan reduce width of exist deck as noted. | $22,750 |
| Jul 14, 2004 | Completed final sign-off Oct 2004 | 155 Seal Rock Dr | revise to app #2004/06/21/6899 reconfigure stairs and raise windows and level floor in fam rm &Details
revise to app #2004/06/21/6899 reconfigure stairs and raise windows and level floor in fam rm & | $7,800 |
| Nov 26, 2003 | Completed final sign-off Jan 2004 | 1473 12th Av | repair rear stairs & landings as required. replace per sf code as required-same locations configuratDetails
repair rear stairs & landings as required. replace per sf code as required-same locations configurat | $6,750 |
| Jul 10, 2003 | Completed final sign-off Jul 2003 | 630 Oak St | in kind repair rear stairs and lower porch, less than 50% replacement. no structural changesDetails
in kind repair rear stairs and lower porch, less than 50% replacement. no structural changes | $1,250 |
| Apr 23, 2003 | Completed final sign-off Sep 2003 | 431 Belvedere St | repair exist 2nd level deck & rear stairs & landings as required. no structural changes.Details
repair exist 2nd level deck & rear stairs & landings as required. no structural changes. | $8,750 |
| Mar 12, 2002 | Expired or cancelled expired May 2004 | 375 Santa Clara Av | 02nd flr additon @ rear @ (e) deck over (e) enclosed space basement remodel, stair from basement toDetails
02nd flr additon @ rear @ (e) deck over (e) enclosed space basement remodel, stair from basement to | $100,000 |
| Mar 5, 2002 | Completed final sign-off Apr 2002 | 621 Elizabeth St | repair existing stairs & porch in the front of the property. no design or structural changes to be mDetails
repair existing stairs & porch in the front of the property. no design or structural changes to be m | $6,000 |
| Jan 27, 2001 | Completed final sign-off Sep 2003 | 553 Arkansas St | struct wrk correc framg relocat stairs/repla dmg dck/3 units merge to sngle fam dwgDetails
struct wrk correc framg relocat stairs/repla dmg dck/3 units merge to sngle fam dwg | $17,500 |