Van Der Sterre Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2013
- Last 24 months
- 0 permits filed
135 permits since 2000: 107 completed, 14 never finaled, 14 expired or cancelled.
Of the 14 never-finaled permits, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2012 | Completed final sign-off Nov 2014 | 105 Hoffman Av | add garage & bedrooms to an (e) basement & infill under an (e) deck. raise (e) 1st floor approx 2'-0" to accomodate the new garage slope & new stair to connect the (e) & new floors. work also includes add bath & laundry.Details
add garage & bedrooms to an (e) basement & infill under an (e) deck. raise (e) 1st floor approx 2'-0" to accomodate the new garage slope & new stair to connect the (e) & new floors. work also includes add bath & laundry. | $150,000 |
| Apr 19, 2012 | Completed final sign-off Oct 2012 | 502 Jefferson St | repair 2nd floor deck and upgrade (e) foundation and strengthening the deck for dry rot rotted timber.Details
repair 2nd floor deck and upgrade (e) foundation and strengthening the deck for dry rot rotted timber. | $18,000 |
| Feb 23, 2011 | Completed final sign-off Apr 2014 | 4366 26th St | extension of ground floor towards rear yard and addition of partial 3rd level below ground level, minor renovation of kitchen, reconfiguration of deck & stairs.Details
extension of ground floor towards rear yard and addition of partial 3rd level below ground level, minor renovation of kitchen, reconfiguration of deck & stairs. | $105,000 |
| Jul 21, 2008 | Completed final sign-off Sep 2008 | 630 Oak St | repair dryrot at rear stairs. replace 2 stringers & 3-7 joists at deck/landings. less than 10% replacement/repair. no change to windows orders.Details
repair dryrot at rear stairs. replace 2 stringers & 3-7 joists at deck/landings. less than 10% replacement/repair. no change to windows orders. | $1,250 |
| Dec 31, 2007 | Completed final sign-off Feb 2008 | 146 Elsie St | replacement of existing rear yard deck. extend deck to north side and build property line wall, new deck to be less than 3' above grade.Details
replacement of existing rear yard deck. extend deck to north side and build property line wall, new deck to be less than 3' above grade. | $18,750 |
| May 8, 2007 | Completed final sign-off Aug 2007 | 1637 Diamond St | replacement inkind of extg lower deck and structure at rear. upgrade extg footings for deck and replace posts in kind to support extg rear of house(conditioned space)Details
replacement inkind of extg lower deck and structure at rear. upgrade extg footings for deck and replace posts in kind to support extg rear of house(conditioned space) | $47,500 |
| Apr 10, 2006 | Completed final sign-off Mar 2008 | 608 Elizabeth St | renovation of basement and 1st floor with new deck. 2nd story- vertical addition include 3 bedrooms and 2 bathrooms. new stair (interior) from 2nd floor to basement.Details
renovation of basement and 1st floor with new deck. 2nd story- vertical addition include 3 bedrooms and 2 bathrooms. new stair (interior) from 2nd floor to basement. | $500,000 |
| Feb 7, 2005 | Completed final sign-off May 2005 | 150 Funston Av | rebuild & reconfiguire exist rear stairs & landings per plan reduce width of exist deck as noted.Details
rebuild & reconfiguire exist rear stairs & landings per plan reduce width of exist deck as noted. | $22,750 |
| Apr 23, 2003 | Completed final sign-off Sep 2003 | 431 Belvedere St | repair exist 2nd level deck & rear stairs & landings as required. no structural changes.Details
repair exist 2nd level deck & rear stairs & landings as required. no structural changes. | $8,750 |
| Jun 24, 2002 | Never finaled issued Jun 2002, no final | 20 Hill Point Av | repl (e)low height deck;new footings & structure;deck rebuilt in kindDetails
repl (e)low height deck;new footings & structure;deck rebuilt in kind | $16,250 |
| Mar 12, 2002 | Expired or cancelled expired May 2004 | 375 Santa Clara Av | 02nd flr additon @ rear @ (e) deck over (e) enclosed space basement remodel, stair from basement toDetails
02nd flr additon @ rear @ (e) deck over (e) enclosed space basement remodel, stair from basement to | $100,000 |