Back to bathroom remodel contractors
Van Der Sterre Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2013
- Last 24 months
- 0 permits filed
135 permits since 2000: 107 completed, 14 never finaled, 14 expired or cancelled.
Of the 14 never-finaled permits, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 28 completed, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 879 Clayton St | renovation of existing bathroom - new fixtures & finishes, no structural changes.Details
renovation of existing bathroom - new fixtures & finishes, no structural changes. | $23,750 |
| Oct 3, 2013 | Expired or cancelled expired Mar 2016 | 149 Albion St | new 3-stop residential dumbwaiter & shaft. and replace extg drivway slab and extg vehicular gate with new driveway slab and new vehicular gate in like kind. new half bath new hot tub, new skylight, gas meter relocation. revision to app#201006043843 s1/r1/various int. plan layout revisions.Details
new 3-stop residential dumbwaiter & shaft. and replace extg drivway slab and extg vehicular gate with new driveway slab and new vehicular gate in like kind. new half bath new hot tub, new skylight, gas meter relocation. revision to app#201006043843 s1/r1/various int. plan layout revisions. | $3,600 |
| Apr 26, 2013 | Completed final sign-off Jul 2013 | 2 Short St | replace existing fixtures and finishes at kitchen & 2 bathrms, no exterior changes,new appliances paint and floor refinish, upgrade lighting at kitchen & baths/high eff & occupancy sensors @ baths, no structural changesDetails
replace existing fixtures and finishes at kitchen & 2 bathrms, no exterior changes,new appliances paint and floor refinish, upgrade lighting at kitchen & baths/high eff & occupancy sensors @ baths, no structural changes | $78,500 |
| Dec 21, 2012 | Completed final sign-off Nov 2014 | 105 Hoffman Av | add garage & bedrooms to an (e) basement & infill under an (e) deck. raise (e) 1st floor approx 2'-0" to accomodate the new garage slope & new stair to connect the (e) & new floors. work also includes add bath & laundry.Details
add garage & bedrooms to an (e) basement & infill under an (e) deck. raise (e) 1st floor approx 2'-0" to accomodate the new garage slope & new stair to connect the (e) & new floors. work also includes add bath & laundry. | $150,000 |
| Dec 7, 2011 | Completed final sign-off Jun 2012 | 2428 Larkin St | renovation at upper condominium, 2428. add new master bath, new finishes at existing bath, relocation of kitchen. no expanded footprint or exterior changes. currently 1 bath, changing to 2.Details
renovation at upper condominium, 2428. add new master bath, new finishes at existing bath, relocation of kitchen. no expanded footprint or exterior changes. currently 1 bath, changing to 2. | $60,000 |
| Oct 5, 2011 | Completed final sign-off Dec 2011 | 23 Walter St | convert (e) storage space at level one into bedromm full bathroom and closet with new interior stair to level 2Details
convert (e) storage space at level one into bedromm full bathroom and closet with new interior stair to level 2 | $45,000 |
| Jul 26, 2011 | Completed final sign-off Nov 2011 | 2654 Greenwich St | renovation at existing housekeep unit (2656 greenwich):- replace fixtures and finishes at existing bath and kitchen; replace 1 window and 2 door at existing openings in kind. window not visible from the street. minor dryrot repair at balcony. max. u value=0.40. no structural work.Details
renovation at existing housekeep unit (2656 greenwich):- replace fixtures and finishes at existing bath and kitchen; replace 1 window and 2 door at existing openings in kind. window not visible from the street. minor dryrot repair at balcony. max. u value=0.40. no structural work. | $37,500 |
| Apr 5, 2011 | Completed final sign-off Oct 2011 | 2612 Scott St | existing bathroom & wetbar renovation at upper bedroom level (top level), new fixtures & finishes, no structural changes and misc. lighting upgrade. no change in walls and opening layout.Details
existing bathroom & wetbar renovation at upper bedroom level (top level), new fixtures & finishes, no structural changes and misc. lighting upgrade. no change in walls and opening layout. | $37,500 |
| Nov 12, 2010 | Completed final sign-off Apr 2011 | 1637 Diamond St | bathroom & kitchen renovation- new fixtures & finishes, no structural change, new window & door replacement in existing openings. all wood, dual glazed, same style, new lighting as required.Details
bathroom & kitchen renovation- new fixtures & finishes, no structural change, new window & door replacement in existing openings. all wood, dual glazed, same style, new lighting as required. | $67,400 |
| Feb 4, 2010 | Completed final sign-off Feb 2011 | 3349 Washington St | new 3rd floor roof deck and interior remodel w/ no construction of additional conditioned floor area. interior work includes remodel of bath #2, remove/replace interior partitions 3rd floor, replace 3rd floor windows with new dual glazed windows in existing openings.Details
new 3rd floor roof deck and interior remodel w/ no construction of additional conditioned floor area. interior work includes remodel of bath #2, remove/replace interior partitions 3rd floor, replace 3rd floor windows with new dual glazed windows in existing openings. | $40,000 |
| Jun 3, 2009 | Completed final sign-off Mar 2010 | 2406 Larkin St | renovate kitchen & 2 guest baths - new fixtures & finishes - no structural changes.Details
renovate kitchen & 2 guest baths - new fixtures & finishes - no structural changes. | $72,500 |
| May 26, 2009 | Never finaled issued Sep 2009, no final | 347 Liberty St | interior alteration increasing size of (e) garage, install new elevator from garage to upper two levels, enlarge (e) kitchen and renovate kitchen/bath/laundry at 1st floor. add new elevator access at 2nd floor.Details
interior alteration increasing size of (e) garage, install new elevator from garage to upper two levels, enlarge (e) kitchen and renovate kitchen/bath/laundry at 1st floor. add new elevator access at 2nd floor. | $500,000 |
| Feb 2, 2009 | Completed final sign-off Mar 2010 | 2406 Larkin St | proposed renovation to single family home extg. property to add horizontal and vertical addtion at rear of property. keeping in context of neighborhood with style of shape of addition. new addtion will be a total of 3 bedrooms and 3.5 bathrooms.Details
proposed renovation to single family home extg. property to add horizontal and vertical addtion at rear of property. keeping in context of neighborhood with style of shape of addition. new addtion will be a total of 3 bedrooms and 3.5 bathrooms. | $300,000 |
| Jan 26, 2009 | Completed final sign-off Jun 2009 | 3349 Washington St | renovate kitchen finish & finishes at 2 bathrooms, new tile and slab, new cabinets & fixtures. no structural changes. replace 2 doors at rear patio in existing locations.Details
renovate kitchen finish & finishes at 2 bathrooms, new tile and slab, new cabinets & fixtures. no structural changes. replace 2 doors at rear patio in existing locations. | $72,500 |
| Jan 20, 2009 | Completed final sign-off Mar 2009 | 2040 Franklin St | bath & kitchen renovation- new fixtures & finishes.Details
bath & kitchen renovation- new fixtures & finishes. | $27,500 |
| Sep 24, 2008 | Completed final sign-off Feb 2010 | 51 Ford St | work @ unit# 53 only. renovation of ktichen & bathroom. new cabinets, fixtures & finishes. replace (e) window sash in kind. no structural changes. approx 12 windows to be modified. u factor 0.67 or better. minor lighting changes.Details
work @ unit# 53 only. renovation of ktichen & bathroom. new cabinets, fixtures & finishes. replace (e) window sash in kind. no structural changes. approx 12 windows to be modified. u factor 0.67 or better. minor lighting changes. | $52,500 |
| Jul 21, 2008 | Never finaled issued Jul 2008, no final | 455 Frederick St | 1 kitchen & 1 bathroom renovation. new cabinets, fixtures & finishes. no structural change. no envelope change. no change to windows or doors.Details
1 kitchen & 1 bathroom renovation. new cabinets, fixtures & finishes. no structural change. no envelope change. no change to windows or doors. | $87,500 |
| Nov 14, 2007 | Completed final sign-off Apr 2008 | 2308 Divisadero St | upgrade (e) electrical. new outlet & switches & fixtures. insulation as required. new hvac, new 1 bath fixtures & finishes, new drywall & finish as required. no structural changes. patch & dry wall only for install of mep & insulation.Details
upgrade (e) electrical. new outlet & switches & fixtures. insulation as required. new hvac, new 1 bath fixtures & finishes, new drywall & finish as required. no structural changes. patch & dry wall only for install of mep & insulation. | $17,500 |
| Nov 10, 2006 | Completed final sign-off Jan 2007 | 3 Meacham Pl | 1 exist. bathroom renovation-new fixtures & finishes. no relocations, no structural change lighting to be flourescent on a motion detector.Details
1 exist. bathroom renovation-new fixtures & finishes. no relocations, no structural change lighting to be flourescent on a motion detector. | $14,750 |
| Apr 10, 2006 | Completed final sign-off Mar 2008 | 608 Elizabeth St | renovation of basement and 1st floor with new deck. 2nd story- vertical addition include 3 bedrooms and 2 bathrooms. new stair (interior) from 2nd floor to basement.Details
renovation of basement and 1st floor with new deck. 2nd story- vertical addition include 3 bedrooms and 2 bathrooms. new stair (interior) from 2nd floor to basement. | $500,000 |
| Jan 18, 2006 | Completed final sign-off Oct 2006 | 235 Pacheco St | replace existing kitchen cabs, counter & appliances; replace existing finishes - no structural change- replace existing fixtures & finishes at rear bath & adj office ( finishes in the office only)Details
replace existing kitchen cabs, counter & appliances; replace existing finishes - no structural change- replace existing fixtures & finishes at rear bath & adj office ( finishes in the office only) | $72,500 |
| Aug 11, 2005 | Completed final sign-off Feb 2006 | 352 Coleridge St | replace (e) rear stairs and water proof deck syste. correction to bath units per 3r-4021. elec. &Details
replace (e) rear stairs and water proof deck syste. correction to bath units per 3r-4021. elec. & | $37,500 |
| Aug 10, 2005 | Completed final sign-off Mar 2006 | 235 Pacheco St | renovate 2 existing 2nd floor baths, new fixtures, finishes, structural changesDetails
renovate 2 existing 2nd floor baths, new fixtures, finishes, structural changes | $47,500 |
| Jun 17, 2005 | Completed final sign-off Sep 2005 | 745 El Camino Del Mar | reduce scope at lower level per revised plan. no structural changes. remove bathroom see page 4- grDetails
reduce scope at lower level per revised plan. no structural changes. remove bathroom see page 4- gr | |
| Aug 18, 2004 | Completed final sign-off Mar 2005 | 150 Funston Av | renovate existing kitchen and 2 bathrooms no structural changes, new cabinets fixtures & finishgesDetails
renovate existing kitchen and 2 bathrooms no structural changes, new cabinets fixtures & finishges | $57,500 |
| Oct 31, 2003 | Completed final sign-off Apr 2004 | 65 Lopez Av | add bath & bedroom at lower level. additional structural requirements for renovation. relocate windoDetails
add bath & bedroom at lower level. additional structural requirements for renovation. relocate windo | $57,500 |
| Oct 29, 2003 | Completed final sign-off Apr 2004 | 65 Lopez Av | renovate two bathrooms and kitchen- new fixtures & finishes. no structural changes. replace windows,Details
renovate two bathrooms and kitchen- new fixtures & finishes. no structural changes. replace windows, | $82,500 |
| May 28, 2003 | Completed final sign-off Aug 2003 | 326 Spruce St | bath renovation, new fixtures, no structural changes, front porch repair, front facade paint, no envDetails
bath renovation, new fixtures, no structural changes, front porch repair, front facade paint, no env | $24,750 |
| Sep 24, 2002 | Completed final sign-off Oct 2002 | 375 Santa Clara Av | demo at bsmt & garage for new family room,bath & laundry. soft demo only.no structural work.Details
demo at bsmt & garage for new family room,bath & laundry. soft demo only.no structural work. | $4,250 |
| Sep 9, 2002 | Completed final sign-off Mar 2003 | 1451 Mcallister St | renovate upper baths no configuration changes,change both to full baths,new fixturesDetails
renovate upper baths no configuration changes,change both to full baths,new fixtures | $12,650 |
| Aug 27, 2002 | Expired or cancelled expired May 2003 | 179 Mendosa Av | revision to permit app 200208093600-add window & replace existing per plan, add bath & br casework &Details
revision to permit app 200208093600-add window & replace existing per plan, add bath & br casework & | $14,750 |
| Aug 9, 2002 | Expired or cancelled expired May 2003 | 179 Mendosa Av | renovate two bathrooms including installation of fixtures & finishes. no structural or exterior chanDetails
renovate two bathrooms including installation of fixtures & finishes. no structural or exterior chan | $13,500 |
| Jul 22, 2002 | Completed final sign-off Mar 2003 | 1451 Mcallister St | renovate bathroom at lower level, new fixtures & finishes, no structural chnagesDetails
renovate bathroom at lower level, new fixtures & finishes, no structural chnages | $8,250 |