Back to kitchen remodel contractors
Urban Builder General Contracting Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jun 2026
- Last 24 months
- 11 permits filed
180 permits since 2000: 167 completed, 6 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
51 kitchen remodel permits: 49 completed, 1 in progress, 1 never finaled. Typically 6 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2025 | In progress issued Jul 2025 | 2128 Vallejo St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 2 shower pan(s). | $100,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2025 | 621 27th St | remodeling of (e) bathroom & (n) bedrm @ 1st fl; add 450 sf conditioned space @ 1st fl; remodel (e) foyer, kitchen, dining rm & 2 bedrms @ 2nd fl; enlarge 1st fl street facing bedrm window for light and ventilation; strengthening living rm floorDetails
remodeling of (e) bathroom & (n) bedrm @ 1st fl; add 450 sf conditioned space @ 1st fl; remodel (e) foyer, kitchen, dining rm & 2 bedrms @ 2nd fl; enlarge 1st fl street facing bedrm window for light and ventilation; strengthening living rm floor | $50,000 |
| Sep 21, 2022 | Completed final sign-off Jun 2024 | 1343 38th Av | replace in kind cabinets and fixtures in kitchen and bathroom.Details
replace in kind cabinets and fixtures in kitchen and bathroom. | $5,000 |
| Dec 10, 2021 | Completed final sign-off Jul 2024 | 1283 06th Av | create (n) 565 sf habitable space by infilling under existing deck & converting portion of exiting storage area. expand (e) deck 17' from rear wall. move mechanical room in storage area. remodel (e) kitchen including new cabinets, fixtures, lighting & equipment.Details
create (n) 565 sf habitable space by infilling under existing deck & converting portion of exiting storage area. expand (e) deck 17' from rear wall. move mechanical room in storage area. remodel (e) kitchen including new cabinets, fixtures, lighting & equipment. | $249,000 |
| Aug 27, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | rev to pa202101142640 - rev to structural to including removal of w/c addition & kitchen windows. new layout for main bedroom. new 2hr enclosure for path of travel light well to rear yard.Details
rev to pa202101142640 - rev to structural to including removal of w/c addition & kitchen windows. new layout for main bedroom. new 2hr enclosure for path of travel light well to rear yard. | |
| Apr 2, 2021 | Completed final sign-off Mar 2024 | 22 Flint St | convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights.Details
convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights. | $325,000 |
| Jan 14, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well.Details
kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well. | $100,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2024 | 160 Buena Vista Tr | interior remodel units 160 and 162: demo (e) secondary staircase in unit 160 and 162, transfer into bathroom; remodel kitchens; new rear deck w/ stair for unit 162; ground floor new residential area: shared office, closet, office & bathroom; select window replacement on west & south facadesDetails
interior remodel units 160 and 162: demo (e) secondary staircase in unit 160 and 162, transfer into bathroom; remodel kitchens; new rear deck w/ stair for unit 162; ground floor new residential area: shared office, closet, office & bathroom; select window replacement on west & south facades | $347,147 |
| Feb 10, 2020 | Completed final sign-off Sep 2020 | 191 San Felipe Av | revision to 201909252632. changes to rear facing window sizes, revised title 24, add structural beam at kitchen where wall removed, dry rot repair of 8' wall at rear, wall strengthening voluntary plywood.Details
revision to 201909252632. changes to rear facing window sizes, revised title 24, add structural beam at kitchen where wall removed, dry rot repair of 8' wall at rear, wall strengthening voluntary plywood. | $12,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2020 | 191 San Felipe Av | kitchen remodel, bathroom remodel, window replacement in kindDetails
kitchen remodel, bathroom remodel, window replacement in kind | $37,000 |
| Jul 1, 2019 | Completed final sign-off May 2020 | 514 Funston Av | interior remodelgr, 2nd, 3rd, gr: new bdrm, bth, laundry, replace e stair w/ new (interior). 2nd: new kitchen ,powder rm. 3rd: mstr bdrm remodel. deck under seperate permitDetails
interior remodelgr, 2nd, 3rd, gr: new bdrm, bth, laundry, replace e stair w/ new (interior). 2nd: new kitchen ,powder rm. 3rd: mstr bdrm remodel. deck under seperate permit | $150,000 |
| Jun 7, 2019 | Completed final sign-off Nov 2019 | 1258 33rd Av | relocate 2nd fl bearing wall and remodel e kitchen. remodel 3rd fl hall to provide laundry closetDetails
relocate 2nd fl bearing wall and remodel e kitchen. remodel 3rd fl hall to provide laundry closet | $15,000 |
| Feb 7, 2019 | Completed final sign-off Jan 2021 | 108 11th Av | renovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom.Details
renovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom. | $350,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2019 | 2822 Sacramento St | renovate exiting one kitchen, no walls removed, all work in kind.Details
renovate exiting one kitchen, no walls removed, all work in kind. | $10,000 |
| Jan 15, 2019 | Completed final sign-off Jun 2019 | 2820 Sacramento St | renovate exiting one kitchen, no walls removed, all work in kind.Details
renovate exiting one kitchen, no walls removed, all work in kind. | $10,000 |
| Nov 3, 2017 | Completed final sign-off Jan 2019 | 294 31st Av | revision to 201612205398, revise framing plan and details, modify floor plan at kitchen, relocate powder rm, rebuild interior stairway add skyklight, window at south elevation and rear of buildingDetails
revision to 201612205398, revise framing plan and details, modify floor plan at kitchen, relocate powder rm, rebuild interior stairway add skyklight, window at south elevation and rear of building | $10,000 |
| Oct 2, 2017 | Completed final sign-off Apr 2018 | 3621 Scott St | remodel interior of single family dwelling, kitchen, 3 baths, 2 new roof decks with new exterior stairs to roof, new int stairs.partial lightwell infills at no and so lightwells. 1st fl new habitable space at e storage maher not reqDetails
remodel interior of single family dwelling, kitchen, 3 baths, 2 new roof decks with new exterior stairs to roof, new int stairs.partial lightwell infills at no and so lightwells. 1st fl new habitable space at e storage maher not req | $180,000 |
| Sep 11, 2017 | Completed final sign-off Apr 2018 | 3621 Scott St | upgrade of appliace in kitchen & toilets & sinks in bathrooms. exploratory sheet rock removal 20 sf at kitchen & 20 sf in bathroom. na for maher.Details
upgrade of appliace in kitchen & toilets & sinks in bathrooms. exploratory sheet rock removal 20 sf at kitchen & 20 sf in bathroom. na for maher. | $5,000 |
| Jun 22, 2017 | Completed final sign-off Apr 2019 | 44 Lower Tr | interior remodel in lower unit on 1st floor & basement. convert crawl space to (n) habitable space, relocating kitchen, living & dining to basement. add 1 master suite on 1st floor & new bath & den in basementDetails
interior remodel in lower unit on 1st floor & basement. convert crawl space to (n) habitable space, relocating kitchen, living & dining to basement. add 1 master suite on 1st floor & new bath & den in basement | $70,000 |
| May 30, 2017 | Completed final sign-off Apr 2019 | 42 Lower Tr | work on upper unit on 2nd floor only - interior remodeling kitchen, bathroom, set back wall 3'-11" increase guardrail ht from 36" to 42" ht. replace roofing & reinforce roof framing (flat roof)Details
work on upper unit on 2nd floor only - interior remodeling kitchen, bathroom, set back wall 3'-11" increase guardrail ht from 36" to 42" ht. replace roofing & reinforce roof framing (flat roof) | $100,000 |
| Mar 16, 2017 | Completed final sign-off Dec 2017 | 4425 20th St | alteration of (e) kitchen and dining rooms to open up space & remodel kitchen. conversion of pantry & closet into new bath. conversion of closet to laundry closetDetails
alteration of (e) kitchen and dining rooms to open up space & remodel kitchen. conversion of pantry & closet into new bath. conversion of closet to laundry closet | $50,000 |
| Dec 20, 2016 | Completed final sign-off Jan 2019 | 294 31st Av | remodel lower level to create new bedroom & ensuite bath, renovate kitchen @2nd flr,repl fixtures/finishes @ powder rm, remodel 3rd flr bathrooms & powder rms.merge north & west bedrms @3rd flr into one master bedroom. new window @ front wood clad.Details
remodel lower level to create new bedroom & ensuite bath, renovate kitchen @2nd flr,repl fixtures/finishes @ powder rm, remodel 3rd flr bathrooms & powder rms.merge north & west bedrms @3rd flr into one master bedroom. new window @ front wood clad. | $96,000 |
| Jun 3, 2016 | Completed final sign-off Jan 2018 | 535 15th Av | horizontal expansion on all 3 floors. (n) kitchen, bathsDetails
horizontal expansion on all 3 floors. (n) kitchen, baths | $80,000 |
| Mar 18, 2016 | Completed final sign-off Oct 2016 | 253 Diamond St | 4th floor: remodel kitchen & laundry area, add property line window @ kitchen - widen wall opening between kitchen & dining room. install header. sprinklers under separate permit per ab009.Details
4th floor: remodel kitchen & laundry area, add property line window @ kitchen - widen wall opening between kitchen & dining room. install header. sprinklers under separate permit per ab009. | $45,000 |
| Dec 16, 2015 | Completed final sign-off Feb 2017 | 3639 21st St | alteration of interior spaces (kitchen, baths) replacement of fenestration, no change of building footprint. small 2nd floor dormer extension.Details
alteration of interior spaces (kitchen, baths) replacement of fenestration, no change of building footprint. small 2nd floor dormer extension. | $110,000 |
| Oct 5, 2015 | Completed final sign-off Oct 2016 | 1632 48th Av | revision to bpa 2014 1120 2144. change layout of interior stairs. relocate kitchen & dining room opposite each other, enlarge windows in living room along south wall.Details
revision to bpa 2014 1120 2144. change layout of interior stairs. relocate kitchen & dining room opposite each other, enlarge windows in living room along south wall. | $5,000 |
| Aug 28, 2015 | Completed final sign-off Jan 2016 | 2447 Vallejo St | unit #4: removate & expand (e) bathroom into adjoing bedrrom, consolidate dining rm & living rm & add bedroom in the formal dining rm area. relocate door opening at (e) center hall. add closet to master bedroom. new laundry area at north end of kitchen. maher na er egress windows compliantDetails
unit #4: removate & expand (e) bathroom into adjoing bedrrom, consolidate dining rm & living rm & add bedroom in the formal dining rm area. relocate door opening at (e) center hall. add closet to master bedroom. new laundry area at north end of kitchen. maher na er egress windows compliant | $57,000 |
| Aug 12, 2015 | Completed final sign-off Dec 2015 | 4831 17th St | replace kitchen cabinets, and back splash, replace sink, replace lighting. walls to be moved under seperate pa# 201508123994Details
replace kitchen cabinets, and back splash, replace sink, replace lighting. walls to be moved under seperate pa# 201508123994 | $17,500 |
| Aug 12, 2015 | Completed final sign-off Dec 2015 | 4831 17th St | remove wall beteween kitchen and dining room & expand opening between living area. work done in conjuction with pa# 201508123995Details
remove wall beteween kitchen and dining room & expand opening between living area. work done in conjuction with pa# 201508123995 | $3,500 |
| Jul 16, 2015 | Completed final sign-off Nov 2016 | 2605 Diamond St | g/f-relocate front door, create 1 hr separation @ garage, 1/f- add (n) masterbath, remodel (e) bath. 2/f- remodel kitchen/bathroom, enclose 9e) lightwell @ south. exterior-replace wood windows, stamped stucco @ front with siding, replace roof, 2 new skylights.Details
g/f-relocate front door, create 1 hr separation @ garage, 1/f- add (n) masterbath, remodel (e) bath. 2/f- remodel kitchen/bathroom, enclose 9e) lightwell @ south. exterior-replace wood windows, stamped stucco @ front with siding, replace roof, 2 new skylights. | $365,000 |
| May 20, 2015 | Completed final sign-off Jan 2016 | 807 Noe St | enlarge wall opening between kitchen and dining room on second floor. covert a closet into a new bathroom on the 3rd floor. remodel existing kitchen and second floor bathroom.Details
enlarge wall opening between kitchen and dining room on second floor. covert a closet into a new bathroom on the 3rd floor. remodel existing kitchen and second floor bathroom. | $30,000 |
| Apr 13, 2015 | Completed final sign-off Sep 2015 | 4100 20th St | remodel (e) kitchen, remodel (e) bathrom, add bathroom, replace (e) deck.Details
remodel (e) kitchen, remodel (e) bathrom, add bathroom, replace (e) deck. | $150,000 |
| Apr 7, 2015 | Completed final sign-off Aug 2015 | 119 09th Av | new bathroom and kitchen remodel on 2nd floor. no structural work.Details
new bathroom and kitchen remodel on 2nd floor. no structural work. | $50,000 |
| Jan 13, 2015 | Completed final sign-off Jun 2015 | 567 16th Av | renovate existing kitchen: remove existing cabinets, update electrical, patch drywall, install new cabinets & counters.Details
renovate existing kitchen: remove existing cabinets, update electrical, patch drywall, install new cabinets & counters. | $10,000 |
| Sep 30, 2014 | Completed final sign-off Jan 2015 | 673 Kansas St | one kitchen renovation: remove old cabinets. instal new cabinets, counters and appliances, new outlets to code. all work in unit 1 lower level.Details
one kitchen renovation: remove old cabinets. instal new cabinets, counters and appliances, new outlets to code. all work in unit 1 lower level. | $10,000 |
| Sep 23, 2013 | Completed final sign-off Apr 2014 | 166 Casitas Av | new stairs & railing at rear yard, new sliding glass door at rear, new windows at side yard. interior renovation on 1st floor-kitchen, bathroom, laundry. remove walls. interior renovation on 2nd floor-master bathroom & closetDetails
new stairs & railing at rear yard, new sliding glass door at rear, new windows at side yard. interior renovation on 1st floor-kitchen, bathroom, laundry. remove walls. interior renovation on 2nd floor-master bathroom & closet | $95,000 |
| Aug 14, 2013 | Completed final sign-off Apr 2014 | 2277 Bryant St | 1) 1st floor: voluntary structural upgrade and expansion of 14 sq ft to accomodate 2nd means of egress. 2)2nd and 3rd floor alterations to residential 2 units: renovate kitchens at both units, new master baths at both units, renovation of 1 extg bath at both units. reframe & change 6 windows.Details
1) 1st floor: voluntary structural upgrade and expansion of 14 sq ft to accomodate 2nd means of egress. 2)2nd and 3rd floor alterations to residential 2 units: renovate kitchens at both units, new master baths at both units, renovation of 1 extg bath at both units. reframe & change 6 windows. | $420,000 |
| May 3, 2013 | Completed final sign-off Jul 2013 | 50 Berkshire Wy | remove a bearing wall between the kitchen & dining room. add a beam, 2 posts & 1 footingDetails
remove a bearing wall between the kitchen & dining room. add a beam, 2 posts & 1 footing | $10,000 |
| Apr 25, 2013 | Completed final sign-off Jul 2013 | 50 Berkshire Wy | renovate existing kitchenDetails
renovate existing kitchen | $20,000 |
| Sep 21, 2012 | Never finaled issued Sep 2012, no final | 208 Elsie St | remodel kitchen: new lighting, new plumbing, new dry wall, new flooring & cabinets. a min. of 50% of total wattage of permanently installed lighting shall be high efficacy. no structural work.Details
remodel kitchen: new lighting, new plumbing, new dry wall, new flooring & cabinets. a min. of 50% of total wattage of permanently installed lighting shall be high efficacy. no structural work. | $20,000 |
| Feb 28, 2012 | Completed final sign-off May 2012 | 634 Miramar Av | remodel of kitchen, removal of home office closet, removal of bedroom closet, construction of 2nd bathroom. relocate laundry to bsmt.Details
remodel of kitchen, removal of home office closet, removal of bedroom closet, construction of 2nd bathroom. relocate laundry to bsmt. | $40,000 |
| Feb 8, 2012 | Completed final sign-off Apr 2012 | 39 Farnum St | one kitchen renovation - demo existing kitchen, new electrical & plumbing to code, new drywall, cabinets, counters and appliances.Details
one kitchen renovation - demo existing kitchen, new electrical & plumbing to code, new drywall, cabinets, counters and appliances. | $20,000 |
| Sep 27, 2011 | Completed final sign-off Dec 2011 | 209 Eureka St | renovate one kitchen and laundry room hook ups at extg room. update plmg and electrical in kitchen and laundry. laundry room in unit for private laundry lighting to comply with cec 150k. no change to window wall and doors.Details
renovate one kitchen and laundry room hook ups at extg room. update plmg and electrical in kitchen and laundry. laundry room in unit for private laundry lighting to comply with cec 150k. no change to window wall and doors. | $15,000 |
| Jul 11, 2011 | Completed final sign-off Dec 2011 | 1261 Florida St | remodel of kitchen & bathroom on lower unit (2nd floor).Details
remodel of kitchen & bathroom on lower unit (2nd floor). | $50,126 |
| May 24, 2011 | Completed final sign-off Sep 2011 | 211 Eureka St | demo of existing 1 kitchen, update plumbing & electrical. install new sheetrock and cabinets, counters. lighting to comply with cec 150(k). no change to walls, windows & doors.Details
demo of existing 1 kitchen, update plumbing & electrical. install new sheetrock and cabinets, counters. lighting to comply with cec 150(k). no change to walls, windows & doors. | $15,000 |
| Jan 13, 2011 | Completed final sign-off Aug 2012 | 345 Liberty St | remove wall between kitchen and dining room on 2nd floor. no kitchen remodel.Details
remove wall between kitchen and dining room on 2nd floor. no kitchen remodel. | $15,000 |
| Aug 24, 2010 | Completed final sign-off Dec 2010 | 3633 23rd St | remodel (e) bathroom & water closet - see plans; additon of (1) toilet & (1) sink; replace (2) lightwell windows; remodel (e) kitchen, pull & replace cabinets, flooring & appliancesDetails
remodel (e) bathroom & water closet - see plans; additon of (1) toilet & (1) sink; replace (2) lightwell windows; remodel (e) kitchen, pull & replace cabinets, flooring & appliances | $25,000 |
| Jul 2, 2010 | Completed final sign-off Nov 2010 | 521 Laidley St | 1st floor:replace garage door&garage entry doors;master bedroom/bath/closet remodel;relocate water heater &laundry;replace back window. 2nd floor:replace 1 wall with two structural columns and beam;remodel kitchen w/lights,cabs,cntrs,appliances; lights/elctr. in liv.rm.;new flooringDetails
1st floor:replace garage door&garage entry doors;master bedroom/bath/closet remodel;relocate water heater &laundry;replace back window. 2nd floor:replace 1 wall with two structural columns and beam;remodel kitchen w/lights,cabs,cntrs,appliances; lights/elctr. in liv.rm.;new flooring | $175,000 |
| Dec 4, 2009 | Completed final sign-off Mar 2010 | 4640 18th St | demolish some interior walls, cabinets & appliances in (e) kitchen & bathrooms as shown. replace with new cabinets, appliances, finishes. add rear window to nookDetails
demolish some interior walls, cabinets & appliances in (e) kitchen & bathrooms as shown. replace with new cabinets, appliances, finishes. add rear window to nook | $28,800 |
| Apr 20, 2009 | Completed final sign-off Aug 2009 | 1259 Florida St | demo extg kitchen, bathroom, dining room, bedroom:upgrade electrical and plmg to meet sf bldg codes. install new cabnets and appliances in kitchens. install new tile and fixtures in bathroom. install new forced air heating, replace single pane wndw with double pane.Details
demo extg kitchen, bathroom, dining room, bedroom:upgrade electrical and plmg to meet sf bldg codes. install new cabnets and appliances in kitchens. install new tile and fixtures in bathroom. install new forced air heating, replace single pane wndw with double pane. | $40,000 |
| Sep 27, 2007 | Completed final sign-off Nov 2007 | 2403 23rd St | small kitchen remodel, cabinets, sink,dishwasher, electrical. no structural work. no light changesDetails
small kitchen remodel, cabinets, sink,dishwasher, electrical. no structural work. no light changes | $8,000 |