Upscale Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jul 2026
- Last 24 months
- 16 permits filed
442 permits since 2000: 358 completed, 9 in progress, 39 never finaled, 36 expired or cancelled.
Of the 39 never-finaled permits, 6 are 3 to 5 years old, 13 are 5 to 10 years old, 20 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
7 roof deck permits: 3 completed, 4 expired or cancelled. Typically 264 days from filing to permit and 707 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2025 | Expired or cancelled cancelled Jan 2026 | 1990 Lombard St | 3/f: conversion of office suite at 3/f into 4 residential dwelling units, new roof decks, new windows at 3/f includes structural work.Details
3/f: conversion of office suite at 3/f into 4 residential dwelling units, new roof decks, new windows at 3/f includes structural work. | $750,000 |
| Oct 15, 2015 | Completed final sign-off Sep 2018 | 2673 Clay St | remodel & horizontal additions to (e) single family home, demo (e) gym in rear yard. (e) historical front facade to remain intact. except for relocation of (e) entry porch to be perp to street to match (e) street pattern. (n) roof deck & new stair penthouse/stair to roof.Details
remodel & horizontal additions to (e) single family home, demo (e) gym in rear yard. (e) historical front facade to remain intact. except for relocation of (e) entry porch to be perp to street to match (e) street pattern. (n) roof deck & new stair penthouse/stair to roof. | $850,000 |
| Jun 30, 2014 | Expired or cancelled withdrawn Mar 2017 | 200 Locust St | modification of exterior finishes. replacement of windows in existing locations. addition of 4/f dormer, new roof and roof deck. floor plan addition at south sideDetails
modification of exterior finishes. replacement of windows in existing locations. addition of 4/f dormer, new roof and roof deck. floor plan addition at south side | $100,000 |
| Sep 19, 2013 | Completed final sign-off May 2017 | 185 Belgrave Av | vertical & horizontal addition to a sfr. interior remodel to include relocation of stair on all three levels. new fenestrations @ south east. west elevations. new exterior decks & roof decks.Details
vertical & horizontal addition to a sfr. interior remodel to include relocation of stair on all three levels. new fenestrations @ south east. west elevations. new exterior decks & roof decks. | $450,000 |
| Jan 11, 2012 | Completed final sign-off Apr 2014 | 2732 Vallejo St | horizontal addition to (e) ground floor dining room and roof deck above at front of house. replacement and extension of existing rear deck at second floor. removal of (e) sloped roof between two roof dormers at rear and replacement with flat roof.Details
horizontal addition to (e) ground floor dining room and roof deck above at front of house. replacement and extension of existing rear deck at second floor. removal of (e) sloped roof between two roof dormers at rear and replacement with flat roof. | $45,000 |
| Jun 27, 2008 | Expired or cancelled expired Dec 2010 | 2649 Green St | replace rear roof deck tile floor covering. repair water leak. no structural work.Details
replace rear roof deck tile floor covering. repair water leak. no structural work. | $5,000 |
| Feb 22, 2001 | Expired or cancelled expired Nov 2003 | 76 Magnolia St | addition of 3rd story -conversion part of ground floor to 1 bedroom apt addition of roof deck.Details
addition of 3rd story -conversion part of ground floor to 1 bedroom apt addition of roof deck. | $150,000 |