Back to kitchen remodel contractors
Upscale Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Jul 2026
- Last 24 months
- 16 permits filed
442 permits since 2000: 358 completed, 9 in progress, 39 never finaled, 36 expired or cancelled.
Of the 39 never-finaled permits, 6 are 3 to 5 years old, 13 are 5 to 10 years old, 20 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
99 kitchen remodel permits: 83 completed, 5 in progress, 4 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 251 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 3330 Jackson St | in kind kitchen remodel (no changes to the floor plan or walls), no additional plumbing fixtures. cabinets, countertops, replacement plumbing fixtures, paint.Details
in kind kitchen remodel (no changes to the floor plan or walls), no additional plumbing fixtures. cabinets, countertops, replacement plumbing fixtures, paint. | $40,000 |
| Jun 8, 2026 | In progress issued Sep 2026 | 3330 Jackson St | major renovation of interior spaces; replacement of existing staircase; expansion of the kitchen on the rear(north facade) to incorporate expansive glass door; all (e) windows, interior and exterior finishes to be replaced.Details
major renovation of interior spaces; replacement of existing staircase; expansion of the kitchen on the rear(north facade) to incorporate expansive glass door; all (e) windows, interior and exterior finishes to be replaced. | $1,600,000 |
| Apr 23, 2026 | In progress issued May 2026 | 2780 Vallejo St | in kind kitchen remodel, no changes to stucture or floor plan, no additional plumbing.Details
in kind kitchen remodel, no changes to stucture or floor plan, no additional plumbing. | $50,000 |
| Feb 22, 2026 | In progress issued Aug 2026 | 2780 Vallejo St | interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind.Details
interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind. | $1,375,000 |
| Jun 12, 2025 | In progress issued Oct 2025 | 1990 Lombard St | 2nd floor: revision to 202408229253 to incorporate the following: removal of hallway wall at 2nd fl office. new shower compartment at restroom 204. updated lighting/electrical and updated indoor hvac units. no structural changes. relocate kitchen.Details
2nd floor: revision to 202408229253 to incorporate the following: removal of hallway wall at 2nd fl office. new shower compartment at restroom 204. updated lighting/electrical and updated indoor hvac units. no structural changes. relocate kitchen. | $10,000 |
| Jan 29, 2025 | Completed final sign-off Oct 2025 | 3876 Clay St | kitchen and bath remodel. all new finishes are replaced in kind. no structural work. no moving walls. all fixtures to remain in the same location. bathroom remodel located on the second floor.Details
kitchen and bath remodel. all new finishes are replaced in kind. no structural work. no moving walls. all fixtures to remain in the same location. bathroom remodel located on the second floor. | $250,000 |
| Dec 5, 2024 | Completed final sign-off Sep 2025 | 75 West Clay St | repair and replace finishes in the media room, lower bath, pantry, kitchen & primary bath in kind. install (n) heat pump hvac heat system for media room and office. no structural work is needed.Details
repair and replace finishes in the media room, lower bath, pantry, kitchen & primary bath in kind. install (n) heat pump hvac heat system for media room and office. no structural work is needed. | $50,000 |
| Sep 19, 2024 | Expired or cancelled cancelled Nov 2025 | 2821 Steiner St | repair and replace all interior finishes due to water damage. work includes refurbishing 3 existing bathrooms and kitchen- new drywall throughout, paint, and flooring throughout. remediation report to be at site for review by field inspector.Details
repair and replace all interior finishes due to water damage. work includes refurbishing 3 existing bathrooms and kitchen- new drywall throughout, paint, and flooring throughout. remediation report to be at site for review by field inspector. | $250,000 |
| Jun 13, 2024 | Completed final sign-off Aug 2024 | 26 Commonwealth Av | dry rot repair in kitchen and kitchen nook.Details
dry rot repair in kitchen and kitchen nook. | $35,000 |
| Apr 4, 2024 | Completed final sign-off Oct 2025 | 3075 Pacific Av | interior remodel of primary bathroom: primary closet, guest bath, guest bed closet, powder room, partial kitchen cabinet replacement and replacing rear windows and doors in existing locations.all work is replace in kind in existing locations.Details
interior remodel of primary bathroom: primary closet, guest bath, guest bed closet, powder room, partial kitchen cabinet replacement and replacing rear windows and doors in existing locations.all work is replace in kind in existing locations. | $400,000 |
| Nov 13, 2023 | Completed final sign-off May 2025 | 2266 Vallejo St | remodel unit 4 kitchen on level 3. new appliances, cabinets, counters, lighting, and electrical. new direct vent fireplaces at level 3 and 4 in exising fireplace locations. change tub to shower in unit 4 hall bath. existing plumbing fixtures to remain. remodel primary bath, new tile and vanities.Details
remodel unit 4 kitchen on level 3. new appliances, cabinets, counters, lighting, and electrical. new direct vent fireplaces at level 3 and 4 in exising fireplace locations. change tub to shower in unit 4 hall bath. existing plumbing fixtures to remain. remodel primary bath, new tile and vanities. | $45,000 |
| Oct 27, 2022 | Completed final sign-off Oct 2023 | 470 Beacon St | partial remodel, 3/f & 4/f, remodel of kitchen, guest bedroom, bathroom, replace windows/doors, new flooring throughout, improvements to fire place & living room terraceDetails
partial remodel, 3/f & 4/f, remodel of kitchen, guest bedroom, bathroom, replace windows/doors, new flooring throughout, improvements to fire place & living room terrace | $150,000 |
| Jan 10, 2022 | Completed final sign-off Mar 2025 | 1230 Kearny St | bathroom and kitchen remodel. replace plumbing fixtures. new kitchen appliances; new flooring; new led in kind. no structural changes. (3) bathrooms & (1) kitchen.Details
bathroom and kitchen remodel. replace plumbing fixtures. new kitchen appliances; new flooring; new led in kind. no structural changes. (3) bathrooms & (1) kitchen. | $100,000 |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 2200 Pacific Av | revision to pa #201910235398 - no revisions to previously approved windows. new toilet fixtures and finishes in four bathrooms, replacement kitchen cabinets and new appliances, replacement exterior windows title 24 compliant, replacement convenience stair, and new title 24 compliant lightingDetails
revision to pa #201910235398 - no revisions to previously approved windows. new toilet fixtures and finishes in four bathrooms, replacement kitchen cabinets and new appliances, replacement exterior windows title 24 compliant, replacement convenience stair, and new title 24 compliant lighting | $250,000 |
| Mar 10, 2020 | Completed final sign-off Jan 2021 | 3664 22nd St | scope of work includes an interior remodel of kitchen and kid's bathrooms (302 & 307) and putting new finished floor throughout the second floor.Details
scope of work includes an interior remodel of kitchen and kid's bathrooms (302 & 307) and putting new finished floor throughout the second floor. | $1,050,000 |
| Oct 23, 2019 | Completed final sign-off Aug 2021 | 2200 Pacific Av | unit #11a: demo/mold & abatement, upgrade electrical panel, remodel kitchen and (3) bathrooms in kind. refurbish stairs in unit, window replacement w/ title 24 compliant, new floor coverings throughout. test for hazardous material and removal "mold" will be done by licensed moldDetails
unit #11a: demo/mold & abatement, upgrade electrical panel, remodel kitchen and (3) bathrooms in kind. refurbish stairs in unit, window replacement w/ title 24 compliant, new floor coverings throughout. test for hazardous material and removal "mold" will be done by licensed mold | $250,000 |
| Jul 9, 2019 | Completed final sign-off Sep 2020 | 1722 Great Hy | kitchen & bath remodel in each unit, add 2 bathroom, full window replacement, new doors at rear ground level, new level 2 rear deck, stair to grade, 3 new skylightsDetails
kitchen & bath remodel in each unit, add 2 bathroom, full window replacement, new doors at rear ground level, new level 2 rear deck, stair to grade, 3 new skylights | $50,000 |
| Oct 12, 2018 | Completed final sign-off Jan 2022 | 34 Maple St | remodel kitchen, 2 powder rooms, 7 bathrooms, 1 laundry, no structural work or removal of walls. -replace hardword flooring throughtout the house, . not structural wood, . replace all smoke/co detectors.Details
remodel kitchen, 2 powder rooms, 7 bathrooms, 1 laundry, no structural work or removal of walls. -replace hardword flooring throughtout the house, . not structural wood, . replace all smoke/co detectors. | $150,000 |
| Sep 12, 2018 | Completed final sign-off Jan 2019 | 3455 Pierce St | unit #204: kitchen and bathroom remodel. demo & replace in kind. w/o structural workDetails
unit #204: kitchen and bathroom remodel. demo & replace in kind. w/o structural work | $30,000 |
| Dec 27, 2017 | Completed final sign-off Apr 2018 | 3445 Pierce St | apt 305: kitchen & bathroom remodel - no structural - redo finishes.Details
apt 305: kitchen & bathroom remodel - no structural - redo finishes. | $40,000 |
| Dec 27, 2017 | Completed final sign-off May 2018 | 290 Alhambra St | apt 9: kitchen & bathroom remodel; no structural work. redo finishes.Details
apt 9: kitchen & bathroom remodel; no structural work. redo finishes. | $40,000 |
| Dec 14, 2017 | Never finaled issued Dec 2017, no final | 2310 Buchanan St | family room and kitchen improvement. new hardwood floors. new built-in cabinets. new countertops, painting. no floor layout change. no structural work.Details
family room and kitchen improvement. new hardwood floors. new built-in cabinets. new countertops, painting. no floor layout change. no structural work. | $13,000 |
| Nov 7, 2017 | Completed final sign-off Apr 2018 | 3455 Pierce St | apt 202: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes.Details
apt 202: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes. | $40,000 |
| Nov 7, 2017 | Completed final sign-off May 2018 | 2290 Francisco St | apt 101: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes.Details
apt 101: kitchen & bathroom remodel, no structural work. redo finishes. no layout changes. | $40,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 3455 Pierce St | unit #305: kitchen remodel. remove and replace in kindDetails
unit #305: kitchen remodel. remove and replace in kind | $20,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 3455 Pierce St | unit #003: kitchen and bathroom remodel. remove and replace finishes in kind. no structural workDetails
unit #003: kitchen and bathroom remodel. remove and replace finishes in kind. no structural work | $40,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2019 | 201 Locust St | demo & remodel kitchen & 3 baths . no interior walls to be removed.Details
demo & remodel kitchen & 3 baths . no interior walls to be removed. | $20,000 |
| Jul 6, 2017 | Completed final sign-off Jan 2018 | 290 Alhambra St | apt 15: kitchen renovation, plumbing and appliances, cabinets, counters, replace in-kind, no structural changes.Details
apt 15: kitchen renovation, plumbing and appliances, cabinets, counters, replace in-kind, no structural changes. | $20,000 |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 2700 Broadway | kitchen and bathroom remodel - total of 6 baths, no structural work or changes to the exterior of building. minor remodel of laundry-utility. add work: verify smoke detectors inside and out of bedrooms. replace any as needed. n/a maherDetails
kitchen and bathroom remodel - total of 6 baths, no structural work or changes to the exterior of building. minor remodel of laundry-utility. add work: verify smoke detectors inside and out of bedrooms. replace any as needed. n/a maher | $175,000 |
| Apr 6, 2017 | Completed final sign-off Dec 2017 | 2205 Scott St | interior remodel, remodel kitchen & powder room @ 2nd floor. remodel bathrooms @ 3rd floor. replace in-kind. no structural alterations.Details
interior remodel, remodel kitchen & powder room @ 2nd floor. remodel bathrooms @ 3rd floor. replace in-kind. no structural alterations. | $300,000 |
| Mar 20, 2017 | Completed final sign-off Nov 2017 | 3330 Pierce St | unit#107 kitchen & bathroom remodel & replace finishes down to studs. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher.Details
unit#107 kitchen & bathroom remodel & replace finishes down to studs. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher. | $30,000 |
| Mar 20, 2017 | Completed final sign-off Sep 2017 | 3455 Pierce St | unit#102 kitchen & bathroom remodel. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher.Details
unit#102 kitchen & bathroom remodel. no structural work. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. n/a for maher. | $30,000 |
| Dec 2, 2016 | Completed final sign-off Aug 2017 | 3445 Pierce St | #204: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maherDetails
#204: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maher | $30,000 |
| Dec 2, 2016 | Completed final sign-off Aug 2017 | 3455 Pierce St | #302: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maherDetails
#302: kitchen + 1 bath - remove and replace in kind. no structural work.n/a maher | $30,000 |
| Oct 19, 2016 | Completed final sign-off Aug 2017 | 3455 Pierce St | unit #104: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13Details
unit #104: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13 | $30,000 |
| Oct 19, 2016 | Completed final sign-off Aug 2017 | 3455 Pierce St | unit # 105: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13Details
unit # 105: kitchen and bath - remove and replace finishes in kind. no structural work. n/a maher ord. 155-13 | $30,000 |
| Aug 25, 2016 | Completed final sign-off Dec 2016 | 2290 Francisco St | unit #105: kitchen and bath - remove and replace finishes, in kind. no structural work. no wall modification.Details
unit #105: kitchen and bath - remove and replace finishes, in kind. no structural work. no wall modification. | $30,000 |
| Feb 19, 2016 | Completed final sign-off May 2016 | 3455 Pierce St | unit #304: kitchen and bath: remove and replace finishes in kind. no structural work.Details
unit #304: kitchen and bath: remove and replace finishes in kind. no structural work. | $40,000 |
| Oct 30, 2015 | Completed final sign-off Mar 2017 | 200 Brannan St | #436 - interior - kitchen & bath remodel of existing condominium. n/a maher ordinanceDetails
#436 - interior - kitchen & bath remodel of existing condominium. n/a maher ordinance | $185,000 |
| Aug 25, 2015 | Completed final sign-off Sep 2018 | 385 Santa Clara Av | horizontal addition to residence, remodel of (e) residence w/ kitchen & baths. excavate full extent of basement. lot merger under separate permit. removal of detached garage.Details
horizontal addition to residence, remodel of (e) residence w/ kitchen & baths. excavate full extent of basement. lot merger under separate permit. removal of detached garage. | $1,502,350 |
| Feb 5, 2015 | Completed final sign-off May 2015 | 470 Lombard St | kitchen remodel, replace existing finishes, new kitchen cabinets, move plumbing fixutre and add new light and plugs to be title 24 compliant. complete bathroom, remodel, remove all finishes and install new shower and vanity, new fixtures and upgrade electrical.Details
kitchen remodel, replace existing finishes, new kitchen cabinets, move plumbing fixutre and add new light and plugs to be title 24 compliant. complete bathroom, remodel, remove all finishes and install new shower and vanity, new fixtures and upgrade electrical. | $25,000 |
| Sep 5, 2014 | Completed final sign-off May 2017 | 185 Belgrave Av | kitchen & bathroom remodel. no exterior work. no structural work under this permit. all other work under appln #201309197260.Details
kitchen & bathroom remodel. no exterior work. no structural work under this permit. all other work under appln #201309197260. | $25,000 |
| Jul 11, 2014 | Completed final sign-off Sep 2015 | 2622 Jackson St | interior work only - remodel master suite partial kitchen, remodel, remodle powder rooms. expand basement storage; minor structural work.Details
interior work only - remodel master suite partial kitchen, remodel, remodle powder rooms. expand basement storage; minor structural work. | $250,000 |
| Jun 30, 2014 | Completed final sign-off Oct 2016 | 36 Jordan Av | horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind.Details
horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind. | $350,000 |
| Jun 5, 2014 | Completed final sign-off Mar 2015 | 2848 Union St | remodel kitchen, replace windows and doors. extend existing moment frame up on story. 5 doors on entry level, 2 doors on the top level. 1 window on the third floor, 1 window on the top floor.Details
remodel kitchen, replace windows and doors. extend existing moment frame up on story. 5 doors on entry level, 2 doors on the top level. 1 window on the third floor, 1 window on the top floor. | $80,000 |
| Mar 20, 2014 | Completed final sign-off Nov 2014 | 2257 Green St | interior kitchen and bath remodel. replace kitchen windows at rear of bldg in same location.Details
interior kitchen and bath remodel. replace kitchen windows at rear of bldg in same location. | $100,000 |
| Jan 30, 2014 | Completed final sign-off Sep 2014 | 115 Spruce St | structural revision to pa# 201305076285 in kitchen remodel. compliance with ordinance #155-13 not required.Details
structural revision to pa# 201305076285 in kitchen remodel. compliance with ordinance #155-13 not required. | |
| Dec 2, 2013 | Completed final sign-off Mar 2014 | 462 Lombard St | (rear) complete kitchen remodel, remove all finishes,new cabinetry, plumbing fixtures, and elec outlets and lighting to comply with t-24, update 1 bathrm, remodel, remove all finishes, new tile shower, toilet, vanity and elec fixtures, repl water heater and furnace in kindDetails
(rear) complete kitchen remodel, remove all finishes,new cabinetry, plumbing fixtures, and elec outlets and lighting to comply with t-24, update 1 bathrm, remodel, remove all finishes, new tile shower, toilet, vanity and elec fixtures, repl water heater and furnace in kind | $30,000 |
| Nov 13, 2013 | Completed final sign-off Oct 2015 | 326 Spruce St | remodel e attic at 3/f include(n)stair to attic @bed level, remodel hall bath, new linen closet @ hall remove(e) fire box @bedrm @ entry, living rm widening of openings@ living rm & dining rms remove (e) fireplace chimney@kitchen add island, new dormersDetails
remodel e attic at 3/f include(n)stair to attic @bed level, remodel hall bath, new linen closet @ hall remove(e) fire box @bedrm @ entry, living rm widening of openings@ living rm & dining rms remove (e) fireplace chimney@kitchen add island, new dormers | $325,000 |
| Jun 4, 2013 | Completed final sign-off Mar 2015 | 2505 Pacific Av | exterior renovation(paint+repair of existing). voluntary foundation strengthening. remodel of existing kitchen and bathrooms. installation of new elevator. modification of rear bay+removeal of basement+3rd floor kitchen.Details
exterior renovation(paint+repair of existing). voluntary foundation strengthening. remodel of existing kitchen and bathrooms. installation of new elevator. modification of rear bay+removeal of basement+3rd floor kitchen. | $965,000 |
| May 7, 2013 | Completed final sign-off Nov 2014 | 115 Spruce St | 35 s.f horizontal addition on 2nd flr kitchen at rear of house. work includes (n) kitchen cabinets, counters, lighting.Details
35 s.f horizontal addition on 2nd flr kitchen at rear of house. work includes (n) kitchen cabinets, counters, lighting. | $30,000 |
| Mar 22, 2013 | Completed final sign-off Apr 2013 | 2780 Broadway | remove rotted window in kitchen & replace in-kind. paint exterior and some interiors. window is on west facade & behind existing parapet wall. window is more than 3 feet from property line, not visable from street. no rough opening changes. u-factor for window shall not exceed 0.40.Details
remove rotted window in kitchen & replace in-kind. paint exterior and some interiors. window is on west facade & behind existing parapet wall. window is more than 3 feet from property line, not visable from street. no rough opening changes. u-factor for window shall not exceed 0.40. | $10,000 |
| Mar 21, 2013 | Completed final sign-off Sep 2014 | 115 Spruce St | remodel 1st & 3rd floors-1st fl-widen garage opening to 9'6" with 12' setback from front of residence. add new wine room & renovate (e) shower & closet. 3rd fl-remove safe, redo closet off master bedroom. add stackable washer & dryer. no work on 2nd floor. remove 2nd kitchen on ground floor.Details
remodel 1st & 3rd floors-1st fl-widen garage opening to 9'6" with 12' setback from front of residence. add new wine room & renovate (e) shower & closet. 3rd fl-remove safe, redo closet off master bedroom. add stackable washer & dryer. no work on 2nd floor. remove 2nd kitchen on ground floor. | $25,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2013 | 315 Laurel St | the original kitchen cabinets, were not being replaced, except for the island, in the original plan, owner's opted to change the perimeter cabinets & countertops & appliances, there will be minor elec & plmbg alterations due to the change, rev to 201109023805Details
the original kitchen cabinets, were not being replaced, except for the island, in the original plan, owner's opted to change the perimeter cabinets & countertops & appliances, there will be minor elec & plmbg alterations due to the change, rev to 201109023805 | $15,000 |
| Jul 18, 2012 | Completed final sign-off Apr 2013 | 2332 Washington St | minimal structural upgrades, main level & 2nd floor renovations. kitchen and bathroom remodel.Details
minimal structural upgrades, main level & 2nd floor renovations. kitchen and bathroom remodel. | $180,000 |
| Apr 17, 2012 | Completed final sign-off May 2013 | 3636 Washington St | lighting to comply with cec150(k), exterior paint, kitchen & 3 bathrooms replace in kind.Details
lighting to comply with cec150(k), exterior paint, kitchen & 3 bathrooms replace in kind. | $125,000 |
| Feb 24, 2012 | Completed final sign-off Apr 2014 | 2732 Vallejo St | interior remodel: basement laundry room, basement bathroom and lowering of basement slab on grade. remodel 1st fl bath, demo stair and au pair room. remodel 2nd floor kitchen, family room, entry gallery. remodel 3rd fl master suite bath. remodel 4th fl bath. replace windows/ext doors,removeDetails
interior remodel: basement laundry room, basement bathroom and lowering of basement slab on grade. remodel 1st fl bath, demo stair and au pair room. remodel 2nd floor kitchen, family room, entry gallery. remodel 3rd fl master suite bath. remodel 4th fl bath. replace windows/ext doors,remove | $648,400 |
| Jan 4, 2012 | Completed final sign-off Apr 2012 | 2625 Lyon St | remodel of 1 kitchen and bath, remove all finishes in kitchen to the studs, repl in kind with new cabinets/counters/re-use appliances/refinish hardwood floros, 1 bathrm remove shower tile, floor tile, vanity and toilet, re-tile and reinstall toilet and vanity, new paint, no structural work, lightingDetails
remodel of 1 kitchen and bath, remove all finishes in kitchen to the studs, repl in kind with new cabinets/counters/re-use appliances/refinish hardwood floros, 1 bathrm remove shower tile, floor tile, vanity and toilet, re-tile and reinstall toilet and vanity, new paint, no structural work, lighting | $38,000 |
| Jan 3, 2012 | Completed final sign-off Nov 2012 | 1291 05th Av | interior remodel within extg bldg envelope. 1st floor: renovate extg storage laundry and mch space. add bathroom. 2nd floor:relocate extg power room in place. kitchen remodel. 3rd floor: in place master bathroom and closet remodel.Details
interior remodel within extg bldg envelope. 1st floor: renovate extg storage laundry and mch space. add bathroom. 2nd floor:relocate extg power room in place. kitchen remodel. 3rd floor: in place master bathroom and closet remodel. | $275,000 |
| Dec 12, 2011 | Completed final sign-off Nov 2015 | 535 El Camino Del Mar | remodel (e) 2nd story bedroom / bath over garage as accessory to new bedroom over (e) study. new interior stair to replace (e) exterior stair. replace kitchen roof, remodel (e) kitchen, bath, finishes, replace (e) windows, and exterior fin.Details
remodel (e) 2nd story bedroom / bath over garage as accessory to new bedroom over (e) study. new interior stair to replace (e) exterior stair. replace kitchen roof, remodel (e) kitchen, bath, finishes, replace (e) windows, and exterior fin. | $100,000 |
| Dec 6, 2011 | Never finaled issued Dec 2011, no final | 1291 05th Av | kitchen & master bath remodel, strip finished to studs in most areas keep (e) cabinets on north wall & most of west wall. patch in a few new cabinets, new electrical & plumbing, lighting to be flourescent to meet title 24. no change on walls and openings.Details
kitchen & master bath remodel, strip finished to studs in most areas keep (e) cabinets on north wall & most of west wall. patch in a few new cabinets, new electrical & plumbing, lighting to be flourescent to meet title 24. no change on walls and openings. | $30,000 |
| Sep 21, 2011 | Completed final sign-off Jan 2013 | 2416 Gough St | convert portion of (e) garage level under kitchen & brkfst rm to habitable space. partially infill under (e) deck to allign w/ (e) rear wall above. 1st fl: extend (e) brkfst rm north to side property line to enclose portion of deck. total depth of bldg does not change. 2nd fl: raise (e) bath ceilingDetails
convert portion of (e) garage level under kitchen & brkfst rm to habitable space. partially infill under (e) deck to allign w/ (e) rear wall above. 1st fl: extend (e) brkfst rm north to side property line to enclose portion of deck. total depth of bldg does not change. 2nd fl: raise (e) bath ceiling | $143,000 |
| Sep 2, 2011 | Completed final sign-off Mar 2012 | 1100 Union St | addendum to permit #201107119849 for submission of plans to show walls moved and electrical per dbi request.renovation of kitchen, baths, relocate laundry & new finishes throughout.Details
addendum to permit #201107119849 for submission of plans to show walls moved and electrical per dbi request.renovation of kitchen, baths, relocate laundry & new finishes throughout. | |
| Aug 12, 2011 | Completed final sign-off Jun 2012 | 29 Saint Germain Av | interior remodel-all flrs including laundry, master bedroom, master bath, kitchen, 2 baths, 1 powder rm, new cabinets, appliances & fixtures. new exterior entry stairs- replacement in kind, voluntary seismic upgrade, expand lower level stairhall into (e) crawl space. change 4 windows not in kindDetails
interior remodel-all flrs including laundry, master bedroom, master bath, kitchen, 2 baths, 1 powder rm, new cabinets, appliances & fixtures. new exterior entry stairs- replacement in kind, voluntary seismic upgrade, expand lower level stairhall into (e) crawl space. change 4 windows not in kind | $200,000 |
| Jul 11, 2011 | Completed final sign-off Mar 2012 | 1100 Union St | interior renovation of unit #201 only to include:floor finishes, new plumbing, light fixtures through out. new countertops and cabinets in kitchen. no structural work. entire unit includes 2 bedroom, 3 bathrooms kitchen, dinning room, living room (approx 2400 sq ft) provide high efficacy lighting.Details
interior renovation of unit #201 only to include:floor finishes, new plumbing, light fixtures through out. new countertops and cabinets in kitchen. no structural work. entire unit includes 2 bedroom, 3 bathrooms kitchen, dinning room, living room (approx 2400 sq ft) provide high efficacy lighting. | $335,650 |
| Mar 29, 2011 | Completed final sign-off May 2012 | 2781 Union St | infill (2) lightwells at existing 2nd floor, kitchen & 1 1/2 bath remodel & misc interior improvements. new windows and door at rear 1st flr, change garage doorDetails
infill (2) lightwells at existing 2nd floor, kitchen & 1 1/2 bath remodel & misc interior improvements. new windows and door at rear 1st flr, change garage door | $128,000 |
| Jan 10, 2011 | Completed final sign-off May 2012 | 2781 Union St | open walls for structural engineer. remove and replace kitchen, master bath, bath#2, powder room. exploritory wholes approx 1000 sf repaired in kind, refinished. no change to windows or doors. lighting to comply with cfc 150 kDetails
open walls for structural engineer. remove and replace kitchen, master bath, bath#2, powder room. exploritory wholes approx 1000 sf repaired in kind, refinished. no change to windows or doors. lighting to comply with cfc 150 k | $120,000 |
| Nov 24, 2010 | Completed final sign-off May 2012 | 2535 Lyon St | remodel of (e) 2 unit bldg: work includes seismic upgrade. legalization of (e) unit @ ground fl. new elevator, new ext. windows & doors. 2 (n) gas fireboxes replacing (e) fireplaces. new radiant heating, ,new plumbing system. new electrical system. remodel kitchens & bathrooms.Details
remodel of (e) 2 unit bldg: work includes seismic upgrade. legalization of (e) unit @ ground fl. new elevator, new ext. windows & doors. 2 (n) gas fireboxes replacing (e) fireplaces. new radiant heating, ,new plumbing system. new electrical system. remodel kitchens & bathrooms. | $600,000 |
| Nov 9, 2010 | Completed final sign-off Feb 2012 | 3527 Washington St | interior remodel-4 flrs within buildable area. garage-add shearwalls to north walls, 1st fl-add shearwalls to north wall of living rm, repl (e) flue @ living rm. relocate powder rm, remove 2 fireplaces in kitchen & dining rm. 2nd fl-remodel 1 bathrm, remove 1 fireplace in bedroom, re-configurDetails
interior remodel-4 flrs within buildable area. garage-add shearwalls to north walls, 1st fl-add shearwalls to north wall of living rm, repl (e) flue @ living rm. relocate powder rm, remove 2 fireplaces in kitchen & dining rm. 2nd fl-remodel 1 bathrm, remove 1 fireplace in bedroom, re-configur | $185,000 |
| Oct 8, 2010 | Expired or cancelled expired Dec 2018 | 2825 Lake St | partial renovation of interior incl kitchen & bathrooms. vertical addition of a new 3rd story to the main house & 2nd story over the garage. horizontal addition to north face of garage & to the southeast (rear) corner of the main house.Details
partial renovation of interior incl kitchen & bathrooms. vertical addition of a new 3rd story to the main house & 2nd story over the garage. horizontal addition to north face of garage & to the southeast (rear) corner of the main house. | $250,000 |
| Oct 8, 2010 | Completed final sign-off Apr 2011 | 2765 Union St | kitchen/master bath/guest bagth remodel, patching in baths, relocation of plumbing, no structural work, new lighting will conform to todays title 24, new tile and cabinets, re-using appliances and fixturesDetails
kitchen/master bath/guest bagth remodel, patching in baths, relocation of plumbing, no structural work, new lighting will conform to todays title 24, new tile and cabinets, re-using appliances and fixtures | $55,000 |
| Aug 18, 2010 | Completed final sign-off Jul 2012 | 2334 Lake St | interior remodel including reloacting kitchen, new elevator, new stair to first level and 2 new full bathrooms at level 3. new workshop at level 1.Details
interior remodel including reloacting kitchen, new elevator, new stair to first level and 2 new full bathrooms at level 3. new workshop at level 1. | $79,500 |
| Jun 2, 2010 | Completed final sign-off Jul 2012 | 2334 Lake St | demolish existing addition, build new addition including kitchen + master bedroom.Details
demolish existing addition, build new addition including kitchen + master bedroom. | $653,000 |
| Mar 11, 2010 | Completed final sign-off Jan 2011 | 3712 Jackson St | kitchen & bathroom remodel. no structural work. remove & replace interior finishes. comform to title 24 regulations. work on 2nd. flr. for kitchen & 3rd. flr. for bath.Details
kitchen & bathroom remodel. no structural work. remove & replace interior finishes. comform to title 24 regulations. work on 2nd. flr. for kitchen & 3rd. flr. for bath. | $80,000 |
| Dec 1, 2009 | Completed final sign-off May 2011 | 2421 Pierce St | kitchen & bath interior renovation @ 1st & 2nd floor, reconfiguration of space @ basement, convert storage to habitable space @ attic w/in (e) roofline, replace slab on grade & expand parking to 3 cars @ garage. relocate stairs @ 1st & 2nd floor, no exterior modifications. structural modification.Details
kitchen & bath interior renovation @ 1st & 2nd floor, reconfiguration of space @ basement, convert storage to habitable space @ attic w/in (e) roofline, replace slab on grade & expand parking to 3 cars @ garage. relocate stairs @ 1st & 2nd floor, no exterior modifications. structural modification. | $320,000 |
| Nov 20, 2009 | Completed final sign-off Jul 2010 | 2440 Filbert St | remodel (e) residence at basement, 1st & 2nd level, work to include the renovation of kitchen, family room, 2 bthrooms & partial basement. elect, plbg & cabinets are to be upgraded in these spaces. remodel to include adding powder room, oone enlarging window & door at rear elevation.Details
remodel (e) residence at basement, 1st & 2nd level, work to include the renovation of kitchen, family room, 2 bthrooms & partial basement. elect, plbg & cabinets are to be upgraded in these spaces. remodel to include adding powder room, oone enlarging window & door at rear elevation. | $150,000 |
| Oct 13, 2009 | Completed final sign-off Sep 2010 | 107 Spruce St | kitchen and bathroom remodel on 2nd and 3rd floors. no structural work, no changes to bldg envelope. revising non structural wall in master bathroom. new interior paint, refinish floorsDetails
kitchen and bathroom remodel on 2nd and 3rd floors. no structural work, no changes to bldg envelope. revising non structural wall in master bathroom. new interior paint, refinish floors | $300,000 |
| May 12, 2009 | Completed final sign-off Jul 2009 | 1 Federal St | unit 22 - kitchen remodel. remove drywall and cabinets and replace with new tile, countertop, appliances and finishes.Details
unit 22 - kitchen remodel. remove drywall and cabinets and replace with new tile, countertop, appliances and finishes. | $35,000 |
| Mar 3, 2009 | Completed final sign-off Jul 2009 | 290 Union St | remodel of existing bathroom, relocate toilet, install new finishes no structural work. partial kitchen remodel remove & replace existing island. replace hardwood floor, remove fireplace.Details
remodel of existing bathroom, relocate toilet, install new finishes no structural work. partial kitchen remodel remove & replace existing island. replace hardwood floor, remove fireplace. | $30,000 |
| Jun 9, 2008 | Expired or cancelled expired Dec 2010 | 2649 Green St | kitchen / powder room / eating nook remodel. walls & ceiling to the studs. upgrade plumbing, electrical. replace all appliances. replace all cabinetry in same location. "no structural" water test, evaluate, repair exterior front staircase in kind if waterproof membrance is damaged. (e) stairs areDetails
kitchen / powder room / eating nook remodel. walls & ceiling to the studs. upgrade plumbing, electrical. replace all appliances. replace all cabinetry in same location. "no structural" water test, evaluate, repair exterior front staircase in kind if waterproof membrance is damaged. (e) stairs are | $50,000 |
| May 14, 2008 | Completed final sign-off Sep 2008 | 66 Santa Ysabel Av | kitchen & bath remodel - gut kitchen to studs, replace appliances. replace fixtures, title in bathroom. redo elect & plumbing to code. no structural work.Details
kitchen & bath remodel - gut kitchen to studs, replace appliances. replace fixtures, title in bathroom. redo elect & plumbing to code. no structural work. | $45,000 |
| Mar 18, 2008 | Completed final sign-off Sep 2008 | 2539 Turk Bl | 1 kitchen and 1 bath remodel. no structural. gut kitchen to studs. re-do elect & plumbing to code. install rock / cabinets & new appliances in same locations. bath remove & replace fixtures in same locations. new tile. min elect. all elect meet new title 24 requirements.Details
1 kitchen and 1 bath remodel. no structural. gut kitchen to studs. re-do elect & plumbing to code. install rock / cabinets & new appliances in same locations. bath remove & replace fixtures in same locations. new tile. min elect. all elect meet new title 24 requirements. | $38,000 |
| Feb 6, 2008 | Completed final sign-off Jun 2008 | 2298 Green St | work on unit#4.only. gut kitchen to studs - replace all cabinetry all lighting to conform to code on 2nd floor street level. flooring/lighting/countertops/cabinetry/paint changes. to comply with title 24 energy codes.Details
work on unit#4.only. gut kitchen to studs - replace all cabinetry all lighting to conform to code on 2nd floor street level. flooring/lighting/countertops/cabinetry/paint changes. to comply with title 24 energy codes. | $28,000 |
| Nov 14, 2007 | Completed final sign-off Jan 2008 | 1562 Stockton St | change cabinets of 1 kitchen, remodel 1 bathroom. change tub sink toilet tile wall. florecent lighting at 1566a unitDetails
change cabinets of 1 kitchen, remodel 1 bathroom. change tub sink toilet tile wall. florecent lighting at 1566a unit | $14,000 |
| Aug 10, 2007 | Expired or cancelled expired Jun 2008 | 1568 Stockton St | change cabinets of kitchen, remodel bathroom, change tub,sink toilet tile wall, 50% of wattage of kitchen lighting to be fluoresceant, bathroom lighting to be fluorescant ok on occupant sensorDetails
change cabinets of kitchen, remodel bathroom, change tub,sink toilet tile wall, 50% of wattage of kitchen lighting to be fluoresceant, bathroom lighting to be fluorescant ok on occupant sensor | $14,000 |
| Feb 2, 2007 | Never finaled issued Feb 2007, no final | 1189 Stanyan St | ground floor-bedrm, bathrm remodel, strip bathroom to studs, new plumbing fixtures. 1st fl-powder rm, kitchen, new finishes, some dry wall patching. 2nd fl-2 bathrms, strip to studs, new fixtures, master bath to studs, new fixtures, kitchen lighting 50% flourscent.Details
ground floor-bedrm, bathrm remodel, strip bathroom to studs, new plumbing fixtures. 1st fl-powder rm, kitchen, new finishes, some dry wall patching. 2nd fl-2 bathrms, strip to studs, new fixtures, master bath to studs, new fixtures, kitchen lighting 50% flourscent. | $50,000 |
| Oct 18, 2006 | Completed final sign-off Mar 2007 | 3530 Broderick St | remodel (e) kitchen & bath. demo walls to studs, remove (e) appliances. no structural work. 50% of general lighting wattage must be flourescent.Details
remodel (e) kitchen & bath. demo walls to studs, remove (e) appliances. no structural work. 50% of general lighting wattage must be flourescent. | $30,000 |
| Jan 18, 2006 | Completed final sign-off Jan 2007 | 2647 Leavenworth St | demolish (e) kitchen & bathroom. install new kitchen & 2 bathooms. install new skylight. install new cabinetry.Details
demolish (e) kitchen & bathroom. install new kitchen & 2 bathooms. install new skylight. install new cabinetry. | $210,000 |
| Jan 6, 2005 | Completed final sign-off Jul 2005 | 2260 Washington St | remodel bathroom-replace all fixtures & new flooring.remodel kitchen-replace cabinets,fixtures,Details
remodel bathroom-replace all fixtures & new flooring.remodel kitchen-replace cabinets,fixtures, | $72,500 |
| Sep 13, 2004 | Completed final sign-off Jan 2005 | 333 Mangels Av | residential remodel of kitchen- demo both rooms to studs, remove all fixtures & replace w/new. new kDetails
residential remodel of kitchen- demo both rooms to studs, remove all fixtures & replace w/new. new k | $28,000 |
| Jul 27, 2004 | Completed final sign-off Jan 2005 | 462 Lombard St | kitchen & bathrooom remodel:remove plaster & fixtures to studs, new electrical, re do plumbing-replaDetails
kitchen & bathrooom remodel:remove plaster & fixtures to studs, new electrical, re do plumbing-repla | $22,000 |
| Jul 15, 2004 | Completed final sign-off Dec 2004 | 1192 Chestnut St | demo kitchen to studs,remove all fixtures,replace kitchen in kind,no structural,new elec & plumbingDetails
demo kitchen to studs,remove all fixtures,replace kitchen in kind,no structural,new elec & plumbing | $25,000 |
| Jul 9, 2004 | Expired or cancelled expired Aug 2006 | 464 Lombard St | kitchen and bath remodel. remove plaster and fixtures to sutds, new elec, redo plumb, replace cabineDetails
kitchen and bath remodel. remove plaster and fixtures to sutds, new elec, redo plumb, replace cabine | $22,000 |
| May 3, 2004 | Completed final sign-off Dec 2004 | 1190 Chestnut St | demove & remodel kitchenDetails
demove & remodel kitchen | $28,000 |
| Jun 10, 2003 | Completed final sign-off Dec 2003 | 464 Lombard St | remove/replace kitchen cabinets/wall coverings, relocate bath fix. in same walls/replace wall coveriDetails
remove/replace kitchen cabinets/wall coverings, relocate bath fix. in same walls/replace wall coveri | $12,000 |
| Dec 19, 2002 | Expired or cancelled expired Aug 2007 | 1463 Green St | 1 kitchen 1 .5 bath remodel,strip walls/replace old cabinets w/ new same locations,new tile,flrs,fixDetails
1 kitchen 1 .5 bath remodel,strip walls/replace old cabinets w/ new same locations,new tile,flrs,fix | $28,000 |
| Dec 17, 2001 | Completed final sign-off Oct 2002 | 1471 Green St | 1 kitchen 1.5 bath remodel strip all wall paneling plaster to open studs no struct. plumb & electricDetails
1 kitchen 1.5 bath remodel strip all wall paneling plaster to open studs no struct. plumb & electric | $29,000 |
| Aug 11, 2000 | Expired or cancelled expired Nov 2001 | 1467 Green St | kitchen & b athroom remodel, strip wall paneling to studsDetails
kitchen & b athroom remodel, strip wall paneling to studs | $45,000 |
| May 4, 2000 | Completed final sign-off Aug 2000 | 345 Ewing Tr | kitchen remodeling, new electrical and plumbing 2 new windows in same locationDetails
kitchen remodeling, new electrical and plumbing 2 new windows in same location | $32,000 |