Permit GraphShortlistSan Francisco building permits since 2000

United Painting & Const

Contractor license
893326
State license record
Based in
San Francisco
On San Francisco permits
Mar 2010 to May 2025
Last 24 months
1 permit filed

11 permits since 2000: 10 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 4Kitchen remodel 3Bathroom remodel 2

4 stairs permits: 4 completed. Typically 0 days from filing to permit and 28 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
May 21, 2025Completed
final sign-off Jun 2025
3279 Cesar Chavez Strepair (10 steps) stairway - response to nov#202536411 item #4: replace 4 rotten steps, build 1st step concrete. replace handrail. up to code. from ground floor to second floor. less than 50% repair (not visible from the street)
Details
Permit
202505216995
Status
complete
Filed
May 21, 2025
Permit issued
May 21, 2025
Final sign-off
Jun 9, 2025
Declared cost
$4,500
Address
3279 Cesar Chavez St

repair (10 steps) stairway - response to nov#202536411 item #4: replace 4 rotten steps, build 1st step concrete. replace handrail. up to code. from ground floor to second floor. less than 50% repair (not visible from the street)

Open the permit page

$4,500
Apr 23, 2021Completed
final sign-off Dec 2022
3548 22nd Stwork includes the reconfiguration of the commercial entry and unisex restroom for accesibility and the in-kind replacement of the rear exterior stairs leading to the 2nd fl. and those from street level leading to the yard level
Details
Permit
202104239271
Status
complete
Filed
Apr 23, 2021
Permit issued
Oct 13, 2021
Final sign-off
Dec 12, 2022
Declared cost
$20,000
Address
3548 22nd St

work includes the reconfiguration of the commercial entry and unisex restroom for accesibility and the in-kind replacement of the rear exterior stairs leading to the 2nd fl. and those from street level leading to the yard level

Open the permit page

$20,000
Aug 11, 2011Completed
final sign-off Sep 2011
1007 Shotwell Strepair side stairway, replace one step, 4 pcs 2x6 landing and add one straiger to support, fix & replace in kind. replace one 1x10x10 wood trim between 2 garage door and replace 4 pcs. decorator trim at bottom side next to garage door, fix & replace in kind.
Details
Permit
201108112272
Status
complete
Filed
Aug 11, 2011
Permit issued
Aug 11, 2011
Final sign-off
Sep 13, 2011
Declared cost
$950
Address
1007 Shotwell St

repair side stairway, replace one step, 4 pcs 2x6 landing and add one straiger to support, fix & replace in kind. replace one 1x10x10 wood trim between 2 garage door and replace 4 pcs. decorator trim at bottom side next to garage door, fix & replace in kind.

Open the permit page

$950
Dec 6, 2010Completed
final sign-off Dec 2010
656 Valencia Stcomply with nov# 201074266 dated 10-22-10, repair top section of back stairway
Details
Permit
201012066156
Status
complete
Filed
Dec 6, 2010
Permit issued
Dec 6, 2010
Final sign-off
Dec 28, 2010
Declared cost
$2,500
Address
656 Valencia St

comply with nov# 201074266 dated 10-22-10, repair top section of back stairway

Open the permit page

$2,500