Back to bathroom remodel contractors
United Painting & Const
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to May 2025
- Last 24 months
- 1 permit filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 6 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2020 | Completed final sign-off Jan 2021 | 296 Precita Av | remodel the kitchen (~12'x14') and bathroom (~5'x8') on the third floor. replacing the cabinets and flooring. kitchen: 8 fixtures. bathroom: 4 fixtures. all work in kind.Details
remodel the kitchen (~12'x14') and bathroom (~5'x8') on the third floor. replacing the cabinets and flooring. kitchen: 8 fixtures. bathroom: 4 fixtures. all work in kind. | $20,000 |
| May 9, 2018 | Completed final sign-off Apr 2019 | 11 Winter Pl | for total (4) units each: (4) kitchen remodel and (4) bathroom remodel. no change of (e) floor planDetails
for total (4) units each: (4) kitchen remodel and (4) bathroom remodel. no change of (e) floor plan | $4,000 |