Turley Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2015 to Oct 2024
- Last 24 months
- 0 permits filed
42 permits since 2000: 28 completed, 1 in progress, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 47 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2021 | Never finaled issued Jul 2023, no final | 559 Jersey St | addition of (n) 3rd flr w/ (n) roof deck to an (e)single fam home. (n) third floor includes (n) north elevation windows, (n) south elevation windows, (n) west elevation windows, (n) deck, (n) staircase from (e) main level to the (n) 3rd level and (n) staircase from (n) 3rd flr to (n) roof top deck.Details
addition of (n) 3rd flr w/ (n) roof deck to an (e)single fam home. (n) third floor includes (n) north elevation windows, (n) south elevation windows, (n) west elevation windows, (n) deck, (n) staircase from (e) main level to the (n) 3rd level and (n) staircase from (n) 3rd flr to (n) roof top deck. | $300,000 |
| Aug 6, 2020 | Completed final sign-off Dec 2020 | 3625 Anza St | correction to (e) structure to convert to condiminiums (comply w/physical inspecdtion report cc-8373, item #2 only) and make compliant to (e) building codes. replace (e) rear stairs in-kind.Details
correction to (e) structure to convert to condiminiums (comply w/physical inspecdtion report cc-8373, item #2 only) and make compliant to (e) building codes. replace (e) rear stairs in-kind. | $50,000 |
| Jun 19, 2019 | Completed final sign-off Sep 2020 | 2572 Pine St | eliminate the interior staircase between garage & 2nd fl. kitchen remodel on 2nd fl. eliminate 3 fixtures full bath on 2nd fl. add one powder room on 2nd fl.Details
eliminate the interior staircase between garage & 2nd fl. kitchen remodel on 2nd fl. eliminate 3 fixtures full bath on 2nd fl. add one powder room on 2nd fl. | $30,000 |
| Dec 15, 2017 | Completed final sign-off May 2018 | 1466 25th Av | replace (2) windows in-kind at rear (max u-factor 0.32), replace exterior stair & landing @ kitchen exit door to back yard, less than 50%Details
replace (2) windows in-kind at rear (max u-factor 0.32), replace exterior stair & landing @ kitchen exit door to back yard, less than 50% | $5,985 |
| Dec 4, 2017 | Completed final sign-off May 2018 | 1466 25th Av | 13 x 13 wood deck @ rear of house and stairDetails
13 x 13 wood deck @ rear of house and stair | $16,900 |
| Sep 12, 2017 | Expired or cancelled withdrawn Dec 2017 | 1466 25th Av | new rear deck & stair for single family residence.Details
new rear deck & stair for single family residence. | $10,000 |