Back to bathroom remodel contractors
Turley Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2015 to Oct 2024
- Last 24 months
- 0 permits filed
42 permits since 2000: 28 completed, 1 in progress, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 10 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 5 days from filing to permit and 392 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2023 | In progress issued Dec 2024 | 3452 Cabrillo St | interior remodel in 1st fl unit: add a media room and remodel two (e) bathrooms. remove portion of (e) non-bearing wall, and infill window.Details
interior remodel in 1st fl unit: add a media room and remodel two (e) bathrooms. remove portion of (e) non-bearing wall, and infill window. | $40,000 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 3452 Cabrillo St | full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers.Details
full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers. | $115,000 |
| Apr 13, 2023 | Completed final sign-off May 2024 | 1339 Vallejo St | 1 bathroom like for like. no str work.Details
1 bathroom like for like. no str work. | $35,000 |
| Jun 17, 2022 | Completed final sign-off May 2024 | 2244 15th St | rev to pa 202205244832. remodel kitchen and bath @ 2nd floor. remove wall and add structural beam between two rear rooms. add sound proofing @ ceilings, add lighting in rear rooms, hallway, bath and front room.Details
rev to pa 202205244832. remodel kitchen and bath @ 2nd floor. remove wall and add structural beam between two rear rooms. add sound proofing @ ceilings, add lighting in rear rooms, hallway, bath and front room. | $20,000 |
| May 24, 2022 | Completed final sign-off Sep 2023 | 2244 15th St | replace kitchen and bathroom in-kind.Details
replace kitchen and bathroom in-kind. | $86,000 |
| Jan 12, 2021 | Never finaled issued Apr 2021, no final | 2588 Pine St | remodel master bath, remodel hall bath.Details
remodel master bath, remodel hall bath. | $50,000 |
| Jan 7, 2021 | Completed final sign-off Apr 2021 | 2572 Pine St | replace master bedroom door & window, replace master bath window, all not visible from streetDetails
replace master bedroom door & window, replace master bath window, all not visible from street | $4,000 |
| Jul 31, 2020 | Completed final sign-off Dec 2020 | 3625 Anza St | remodel 2 bathrooms, in-kind, 1 in each unit. each bathroom is 45 sq ft.Details
remodel 2 bathrooms, in-kind, 1 in each unit. each bathroom is 45 sq ft. | $30,000 |
| Jul 29, 2020 | Expired or cancelled cancelled Aug 2023 | 559 Jersey St | bathroom (~36 sqft)remodel in kind. the fixtures to be replaced are the toilet, sink and shower valve. no change in layout. existing bath tub to remain.Details
bathroom (~36 sqft)remodel in kind. the fixtures to be replaced are the toilet, sink and shower valve. no change in layout. existing bath tub to remain. | $15,000 |
| Jun 19, 2019 | Completed final sign-off Sep 2020 | 2572 Pine St | eliminate the interior staircase between garage & 2nd fl. kitchen remodel on 2nd fl. eliminate 3 fixtures full bath on 2nd fl. add one powder room on 2nd fl.Details
eliminate the interior staircase between garage & 2nd fl. kitchen remodel on 2nd fl. eliminate 3 fixtures full bath on 2nd fl. add one powder room on 2nd fl. | $30,000 |
| May 28, 2019 | Completed final sign-off Mar 2020 | 745 Faxon Av | extg 2 baths to be remodeled. bath 1 replace extg wndw at glassblock glazing with new compliant wndw with less glazing area. replace all finishes and plmg fixtures with new compliant plmg fixtures. new high efficacy lighting throughout. new electrical at bathsDetails
extg 2 baths to be remodeled. bath 1 replace extg wndw at glassblock glazing with new compliant wndw with less glazing area. replace all finishes and plmg fixtures with new compliant plmg fixtures. new high efficacy lighting throughout. new electrical at baths | $20,000 |
| Feb 9, 2017 | Completed final sign-off Apr 2019 | 349 Bacon St | convert portion of garage to add bedroom, bathroom. replace 2 windows in-kind, replace window with door tankless water heater, new furnace, washer, dryerDetails
convert portion of garage to add bedroom, bathroom. replace 2 windows in-kind, replace window with door tankless water heater, new furnace, washer, dryer | $23,000 |
| Oct 20, 2016 | Expired or cancelled expired Apr 2019 | 349 Bacon St | kitchen & bathroom: replace in-kind.Details
kitchen & bathroom: replace in-kind. | $25,000 |
| May 2, 2016 | Completed final sign-off Aug 2016 | 2576 Diamond St | replace kitchen in-kind bath in-kind.Details
replace kitchen in-kind bath in-kind. | $32,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2017 | 174 26th Av | interior remodel of kitchen, baths, bedroom, roof decks, rear deck extension, change brick to wood slats in front, change rear doors & windows, redo stucco & roof.Details
interior remodel of kitchen, baths, bedroom, roof decks, rear deck extension, change brick to wood slats in front, change rear doors & windows, redo stucco & roof. | $275,000 |