Turley Construction
- Based in
- Novato
- On San Francisco permits
- Sep 2015 to Oct 2024
- Last 24 months
- 0 permits filed
42 permits since 2000: 28 completed, 1 in progress, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 479 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2021 | Never finaled issued Jul 2023, no final | 559 Jersey St | addition of (n) 3rd flr w/ (n) roof deck to an (e)single fam home. (n) third floor includes (n) north elevation windows, (n) south elevation windows, (n) west elevation windows, (n) deck, (n) staircase from (e) main level to the (n) 3rd level and (n) staircase from (n) 3rd flr to (n) roof top deck.Details
addition of (n) 3rd flr w/ (n) roof deck to an (e)single fam home. (n) third floor includes (n) north elevation windows, (n) south elevation windows, (n) west elevation windows, (n) deck, (n) staircase from (e) main level to the (n) 3rd level and (n) staircase from (n) 3rd flr to (n) roof top deck. | $300,000 |
| Dec 4, 2017 | Completed final sign-off May 2018 | 1466 25th Av | 13 x 13 wood deck @ rear of house and stairDetails
13 x 13 wood deck @ rear of house and stair | $16,900 |
| Sep 12, 2017 | Expired or cancelled withdrawn Dec 2017 | 1466 25th Av | new rear deck & stair for single family residence.Details
new rear deck & stair for single family residence. | $10,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2017 | 174 26th Av | interior remodel of kitchen, baths, bedroom, roof decks, rear deck extension, change brick to wood slats in front, change rear doors & windows, redo stucco & roof.Details
interior remodel of kitchen, baths, bedroom, roof decks, rear deck extension, change brick to wood slats in front, change rear doors & windows, redo stucco & roof. | $275,000 |