Back to kitchen remodel contractors
Tripoli Carpentry And Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Jul 2026
- Last 24 months
- 7 permits filed
35 permits since 2000: 26 completed, 5 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 5 completed, 2 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 384 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2025 | In progress issued Feb 2025 | 61 Paradise Av | kitchen remodel including moving 2 windows visible from street. bathroom remodel including moving 1 windows. remove fireplace chimney and move rear doorDetails
kitchen remodel including moving 2 windows visible from street. bathroom remodel including moving 1 windows. remove fireplace chimney and move rear door | $80,000 |
| Mar 28, 2024 | In progress issued Mar 2024 | 33 Nantucket Av | replace in kind kitchen renovation. no changes to structure, size or use. updating electrical and plumbing. not changing plumbing locations.Details
replace in kind kitchen renovation. no changes to structure, size or use. updating electrical and plumbing. not changing plumbing locations. | $50,000 |
| Feb 21, 2024 | Completed final sign-off Jun 2024 | 81 Eureka St | in-kind kitchen and bathroom remodel. layout remains the sameDetails
in-kind kitchen and bathroom remodel. layout remains the same | $60,000 |
| Jul 29, 2016 | Completed final sign-off Oct 2017 | 50 Saint Elmo Wy | revision to ref pa 201605258346 to add work scope: remove ceiling framing in kitchen to create vaulted ceiling therein. maher naDetails
revision to ref pa 201605258346 to add work scope: remove ceiling framing in kitchen to create vaulted ceiling therein. maher na | $10,000 |
| May 25, 2016 | Completed final sign-off Oct 2017 | 50 Saint Elmo Wy | mid level floor remodel to (e) 2-story split level residence, including upgrades to kitchen, interior stair & bathroom; installation of new side stair to restore egress - replacing (e) rotted stairs.Details
mid level floor remodel to (e) 2-story split level residence, including upgrades to kitchen, interior stair & bathroom; installation of new side stair to restore egress - replacing (e) rotted stairs. | $75,000 |
| May 14, 2013 | Completed final sign-off Jun 2014 | 426 Connecticut St | remodel of 1st & 2nd floor-new kitchen, lighting & electrical upgrades. installation of new insulation, windows, doors to meet title 24 energy code. structural upgrades to foundation on ground floor. no front facade work.Details
remodel of 1st & 2nd floor-new kitchen, lighting & electrical upgrades. installation of new insulation, windows, doors to meet title 24 energy code. structural upgrades to foundation on ground floor. no front facade work. | $120,000 |
| May 8, 2013 | Expired or cancelled cancelled Jan 2026 | 426 Connecticut St | whole house remodel: demo all finished surfaces, change wall locations per plans new wiring, remodel kitchen, insulate, install new windows and french door, install new trim, strengthen foundation per plans.Details
whole house remodel: demo all finished surfaces, change wall locations per plans new wiring, remodel kitchen, insulate, install new windows and french door, install new trim, strengthen foundation per plans. | $120,000 |
| Sep 12, 2011 | Completed final sign-off Aug 2012 | 3263 20th St | open wall to back utility room, move current kitchen to back utility room. install new bathroom, new w/d in closet, work on 2nd floorDetails
open wall to back utility room, move current kitchen to back utility room. install new bathroom, new w/d in closet, work on 2nd floor | $62,000 |