Back to bathroom remodel contractors
Tripoli Carpentry And Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Jul 2026
- Last 24 months
- 7 permits filed
35 permits since 2000: 26 completed, 5 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 6 completed, 2 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 327 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2026 | In progress issued Aug 2026 | 278 Eureka St | move closet in main bedroom. install 2 lighttubes in bathroom and stairwell. install attic access ladder in back bedroom. install built-in entertainment center in living room.Details
move closet in main bedroom. install 2 lighttubes in bathroom and stairwell. install attic access ladder in back bedroom. install built-in entertainment center in living room. | $20,000 |
| Feb 19, 2025 | In progress issued Feb 2025 | 61 Paradise Av | kitchen remodel including moving 2 windows visible from street. bathroom remodel including moving 1 windows. remove fireplace chimney and move rear doorDetails
kitchen remodel including moving 2 windows visible from street. bathroom remodel including moving 1 windows. remove fireplace chimney and move rear door | $80,000 |
| Feb 12, 2025 | Completed final sign-off Jan 2026 | 63 Eureka St | whole house renovation including all new electrical, bathroom plumbing, insulation, all new drywall and hardwood flooring. layout of bath and 1/2 bath to change. remove closet in entryway.Details
whole house renovation including all new electrical, bathroom plumbing, insulation, all new drywall and hardwood flooring. layout of bath and 1/2 bath to change. remove closet in entryway. | $200,000 |
| Apr 18, 2024 | Completed final sign-off Jun 2024 | 81 Eureka St | revision 202402216286- change 2x windows in bathroomDetails
revision 202402216286- change 2x windows in bathroom | $1,500 |
| Feb 21, 2024 | Completed final sign-off Jun 2024 | 81 Eureka St | in-kind kitchen and bathroom remodel. layout remains the sameDetails
in-kind kitchen and bathroom remodel. layout remains the same | $60,000 |
| May 25, 2016 | Completed final sign-off Oct 2017 | 50 Saint Elmo Wy | mid level floor remodel to (e) 2-story split level residence, including upgrades to kitchen, interior stair & bathroom; installation of new side stair to restore egress - replacing (e) rotted stairs.Details
mid level floor remodel to (e) 2-story split level residence, including upgrades to kitchen, interior stair & bathroom; installation of new side stair to restore egress - replacing (e) rotted stairs. | $75,000 |
| Sep 17, 2014 | Completed final sign-off Feb 2016 | 50 Saint Elmo Wy | ground floor remodel of existing split level 3 story residence ,incl upgrades to laundry room & 1/2 bath, replace 3 windows with wood windows to match existing. approx 750 s.f.; maher n/aDetails
ground floor remodel of existing split level 3 story residence ,incl upgrades to laundry room & 1/2 bath, replace 3 windows with wood windows to match existing. approx 750 s.f.; maher n/a | $50,000 |
| Mar 19, 2013 | Expired or cancelled expired Feb 2019 | 143 Detroit St | replace footing in rear of bldg, excavate to lower floor, add closet, bathroom, and laundry room & office space room.Details
replace footing in rear of bldg, excavate to lower floor, add closet, bathroom, and laundry room & office space room. | $60,000 |
| Sep 12, 2011 | Completed final sign-off Aug 2012 | 3263 20th St | open wall to back utility room, move current kitchen to back utility room. install new bathroom, new w/d in closet, work on 2nd floorDetails
open wall to back utility room, move current kitchen to back utility room. install new bathroom, new w/d in closet, work on 2nd floor | $62,000 |