Block 3044, lot 010
50 Saint Elmo Way
- City’s use
- Single Family Residential
- Built
- 1926
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,430 sq ft
- Lot
- 10,759 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 50 Saint Elmo Wy | Tripoli Carpentry And Construction | replace existing concrete / brick patio and stairs on the front of the house with terra cotta tile. no changes to use, shape, size or design except change of finished surface.Details
replace existing concrete / brick patio and stairs on the front of the house with terra cotta tile. no changes to use, shape, size or design except change of finished surface. | $20,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 50 Saint Elmo Wy | Tripoli Carpentry And Construction | repair concrete patio and steps at front of house to repair leaks. repair & replace less than 50% in-kind. not visible from street.Details
repair concrete patio and steps at front of house to repair leaks. repair & replace less than 50% in-kind. not visible from street. | $30,000 |
| Jul 29, 2016 | Completed final sign-off Oct 2017 | 50 Saint Elmo Wy | Tripoli Carpentry And Construction | revision to ref pa 201605258346 to add work scope: remove ceiling framing in kitchen to create vaulted ceiling therein. maher naDetails
revision to ref pa 201605258346 to add work scope: remove ceiling framing in kitchen to create vaulted ceiling therein. maher na | $10,000 |
| May 25, 2016 | Completed final sign-off Oct 2017 | 50 Saint Elmo Wy | Tripoli Carpentry And Construction | mid level floor remodel to (e) 2-story split level residence, including upgrades to kitchen, interior stair & bathroom; installation of new side stair to restore egress - replacing (e) rotted stairs.Details
mid level floor remodel to (e) 2-story split level residence, including upgrades to kitchen, interior stair & bathroom; installation of new side stair to restore egress - replacing (e) rotted stairs. | $75,000 |
| Jun 10, 2015 | Completed final sign-off Feb 2016 | 50 Saint Elmo Wy | Tripoli Carpentry And Construction | revision to app#201409176567. change extg windows to door, matching exiting on upper floor. includes new concrete landing. n/a for maherDetails
revision to app#201409176567. change extg windows to door, matching exiting on upper floor. includes new concrete landing. n/a for maher | $3,000 |
| Sep 17, 2014 | Completed final sign-off Feb 2016 | 50 Saint Elmo Wy | Tripoli Carpentry And Construction | ground floor remodel of existing split level 3 story residence ,incl upgrades to laundry room & 1/2 bath, replace 3 windows with wood windows to match existing. approx 750 s.f.; maher n/aDetails
ground floor remodel of existing split level 3 story residence ,incl upgrades to laundry room & 1/2 bath, replace 3 windows with wood windows to match existing. approx 750 s.f.; maher n/a | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tripoli Carpentry And Construction (6)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.