Topline Builders Corp
- Based in
- Daly City
- On San Francisco permits
- Feb 2006 to Oct 2022
- Last 24 months
- 0 permits filed
145 permits since 2000: 119 completed, 19 never finaled, 7 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 16 completed. Typically 9 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2019 | Completed final sign-off May 2020 | 2748 Bush St | construct 1 bedroom, 1 full bathroom, 1 powder room & family room @ ground floor; remodel (e) kitchen, bathroom. add 1 full bathroom & 1 powder room @ 2nd floor; re-built (e) interior staircase from 2nd fl to ground floorDetails
construct 1 bedroom, 1 full bathroom, 1 powder room & family room @ ground floor; remodel (e) kitchen, bathroom. add 1 full bathroom & 1 powder room @ 2nd floor; re-built (e) interior staircase from 2nd fl to ground floor | $125,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 35 Cityview Wy | construct 2 bedrooms, 2 bath rooms & family room @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & upgrade partial ceiling joists @ 2nd fl; add tie beam at ground floor; repair exterior stucco in kind & front staircase (steps only)Details
construct 2 bedrooms, 2 bath rooms & family room @ ground fl; remodel (e) kitchen, bathroom, add 1 new bathroom & upgrade partial ceiling joists @ 2nd fl; add tie beam at ground floor; repair exterior stucco in kind & front staircase (steps only) | $110,000 |
| Mar 15, 2019 | Completed final sign-off May 2020 | 1453 26th Av | 1st fl garage, add 3 bedrooms, 2 full baths, entertainment area. 2nd fl add rear deck and stairDetails
1st fl garage, add 3 bedrooms, 2 full baths, entertainment area. 2nd fl add rear deck and stair | $80,000 |
| Oct 25, 2018 | Completed final sign-off Jun 2019 | 689 26th Av | to comply with nov201613531,201529882,201472296,201326721,201145650.201145747,201064407: 1/f-infill at rear, add 2 full bathrooms, 2 bedrooms and laundry. 2/f: total remodel, add 1 full bathroom, reconfgiure interior stairs and infill south lightwell, new rear siding and doors/wdws.Details
to comply with nov201613531,201529882,201472296,201326721,201145650.201145747,201064407: 1/f-infill at rear, add 2 full bathrooms, 2 bedrooms and laundry. 2/f: total remodel, add 1 full bathroom, reconfgiure interior stairs and infill south lightwell, new rear siding and doors/wdws. | $130,000 |
| Jul 5, 2018 | Completed final sign-off May 2019 | 1542 21st Av | add bath & bar sink on 3rd. remodel kit & bath add 2 bath & skylights, convert kitchen to bedroom, rearrange staircase on 2nd, add 2 bathrm 2 full bath, storage & family rm on 1st. replace w/alimn clad wood windows in kind at front. replace vinyl windows at rear. upgrade ele plm systemDetails
add bath & bar sink on 3rd. remodel kit & bath add 2 bath & skylights, convert kitchen to bedroom, rearrange staircase on 2nd, add 2 bathrm 2 full bath, storage & family rm on 1st. replace w/alimn clad wood windows in kind at front. replace vinyl windows at rear. upgrade ele plm system | $150,000 |
| Apr 10, 2018 | Completed final sign-off Jan 2019 | 2271 40th Av | redeisential interior remodel of structure & addition of habitable space on ground floor. new 2 bedroom, 2 bath on ground; 2 exhaust fans. remodel of second floor w/new 1 bath & skylights. new rear deck with stairs at rear of (e) bldg per plan. replace windows in-kind at front of (e) bldg facade.Details
redeisential interior remodel of structure & addition of habitable space on ground floor. new 2 bedroom, 2 bath on ground; 2 exhaust fans. remodel of second floor w/new 1 bath & skylights. new rear deck with stairs at rear of (e) bldg per plan. replace windows in-kind at front of (e) bldg facade. | $84,000 |
| Mar 5, 2018 | Completed final sign-off Dec 2018 | 1252 Alemany Bl | 1)convert extg family room into 2 bedrooms. relocate full bath room and media room at ground floor. 2)remodel extg kitchen, bathroom, construct one new bath room. rebuilt interior stair, upgrade partial ceiling framing and construct 3 skylight at 2nd floor.Details
1)convert extg family room into 2 bedrooms. relocate full bath room and media room at ground floor. 2)remodel extg kitchen, bathroom, construct one new bath room. rebuilt interior stair, upgrade partial ceiling framing and construct 3 skylight at 2nd floor. | $72,000 |
| Jan 9, 2018 | Completed final sign-off Jul 2018 | 246 Thrift St | comply w/nov #201707284 - legalize ground floor bathroom. remove sink under stairs. remove partition on 2nd floor.Details
comply w/nov #201707284 - legalize ground floor bathroom. remove sink under stairs. remove partition on 2nd floor. | $4,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2023 | 440 28th St | add a new garage at (n) b/f, driveway, garage roof to be basement deck. remove exterior wood stair from basement to first floor. replace exterior stair from sidewalk to basement.Details
add a new garage at (n) b/f, driveway, garage roof to be basement deck. remove exterior wood stair from basement to first floor. replace exterior stair from sidewalk to basement. | $80,000 |
| Apr 11, 2014 | Completed final sign-off Dec 2014 | 1546 Alemany Bl | infill lightwell at 2/f; construct new bathroom, family, bedroom & laundry. relocate furnace & water heater at 1st floor. relocate kitchen, remodel bathroom & convert (e) kitchen to bedrooms. new light fixture & outlets, infill lightwell & remove (e) exterior stair @ 2nd floor. all work per plans.Details
infill lightwell at 2/f; construct new bathroom, family, bedroom & laundry. relocate furnace & water heater at 1st floor. relocate kitchen, remodel bathroom & convert (e) kitchen to bedrooms. new light fixture & outlets, infill lightwell & remove (e) exterior stair @ 2nd floor. all work per plans. | $49,000 |
| Jul 8, 2013 | Completed final sign-off Apr 2014 | 1270 York St | alter e floor layout at 1st fl, remodel e kitchen and bath, infill under e room (52 sf) new bath. replace stair at rear, new railing at e front patio, new outlet and light fixtures, new furnace and water heaterDetails
alter e floor layout at 1st fl, remodel e kitchen and bath, infill under e room (52 sf) new bath. replace stair at rear, new railing at e front patio, new outlet and light fixtures, new furnace and water heater | $40,000 |
| Jul 31, 2012 | Completed final sign-off Jan 2013 | 830 Meade Av | at first floor, convert ext family space to bedrooms, and construct non bearing walls for new bathroom and laundry and hall way. remove extg interior stairs.Details
at first floor, convert ext family space to bedrooms, and construct non bearing walls for new bathroom and laundry and hall way. remove extg interior stairs. | $18,000 |
| Jun 27, 2012 | Completed final sign-off Jul 2012 | 818 Goettingen St | repair the exterior stair, damage & rust wood to p.t. wood less than 50%Details
repair the exterior stair, damage & rust wood to p.t. wood less than 50% | $2,000 |
| Jul 27, 2011 | Completed final sign-off Dec 2011 | 3157 Geary Bl | provide accessible toilet, provide interior stairs to (e) basement storage. modify lighting & electrical work. seal (e) floor openingDetails
provide accessible toilet, provide interior stairs to (e) basement storage. modify lighting & electrical work. seal (e) floor opening | $23,000 |
| May 21, 2010 | Completed final sign-off Jun 2010 | 3238 Noriega St | construct rear deck with stairs at rear o (e) building. legalize (e) bderoom & add one full bathroom on (e) ground flr. per plan.Details
construct rear deck with stairs at rear o (e) building. legalize (e) bderoom & add one full bathroom on (e) ground flr. per plan. | $18,000 |
| Mar 28, 2006 | Completed final sign-off Jul 2006 | 762 Head St | interior remodel, relocate kitchen, add one bath, bedroom & laundry at 2nd fl, remodel bath, repair e stair, replace windows.Details
interior remodel, relocate kitchen, add one bath, bedroom & laundry at 2nd fl, remodel bath, repair e stair, replace windows. | $30,000 |